Loading...
20170505164122.pdfMTC Materials Testing& Consulting, Inc GmftwII Faghiireriqg & Commil4ing 0 %pkwhil In9pralon 6 Mnlewiniq TeNting 0 FnAninmenial Convullka QFC 851 Edmonds - 1613107-05 - Proprietary Anchors: Report #P1 4256 CLIENT Woodman Construction DATE PROJECT LOCATION 22 82 8 1 00th Ave W PERMIT # Edincinds WA 98020 Inspection Information: Inspection Date: 05/02/2017 Time Onsite: 1:00 pm Weather Conditions: Overcast, 55 Inspection Pei -formed: Proprietary Anchors Field Data: Base Material: Z CMU Block Thickness in inches: INA Hole Data in inches: Specified Compressive Strength in psi: NA Depth: Edge Distance: End Distance: ! -1 Diameter: 5/8" El Clean 0 Drilled 0 Cored Mechanical Anchor Data: Type: Length in inches: Diameter in inches: Torque (Ft. lbs.): Adhesive Anchor Data: Product Name: HILTI HY-70 Location: Ramp Awning Ledger Number ofanchors: CK Threaded Rod Anchor Length in Inches: 5-1/8 05/02/2017 BLD2016-0325 Spacing: 24" 0 Setting Tool Present Batch #: 0832 20 Ll Exp. Date / Shelf Life:;02/2018 Anchor Diameter in Inches: 3/8 Remarks: As MTC arrived on site, all epoxy work had been completed, and anchors were completely installed. Contractor placed H I LTJ Anchor Rod (threaded) HAS-R 3/8"A-5-1/8" bolts with 1-11LT1 Composite sleeves. The contractor infonned MTC that rods were installed per detail N on page P6.00 of approved plans (HW Engineering). MTC informed that holes were drilled to 5/8" diameter. 3-1/2" deep. and were brushed and blown clean prior to epoxy placement. The contractor showed MTC the brush. air punip, and empty epoxy tubes. However, IVITC could not verify, these clairns, as work was completed upon arrival. ** MTC has spoken with the EOR and lie has re run the calculations, and wavirig the requirement for special inspection oil tile HY70 epoxy operation. Images: —a, '­ O�.. V.- -A ­+.- di —W --" .. .�­ I. r�& — ­­ —1— - —f—ji — W�, 1i �,­A .%0.# - -FM W"1-W f ! 104 - 3 P I I Mw,i. 1� I — 1,0 A ('- ­111,1q. 11.1 A 11 ,4 k, - � �, r, A Cairpnrale w 771 Chrysler DFlive - HurlunlIdain, WA 4R23A v Phone UMSS.111994 - Faic SW It qLjon 21 IS II L a, kt H I v41 -S W - 01�rnpia , W A 9H It 2 - P bon g 'I W1.1.14.9777 IF a iL 16U.5,44.97 71) NW Reglain 805 DoVovi Smoi, Sui�v �5 - Rellinghnni, W % �0�221 - Ph4me --�1641-641.61161 -.160-641-91 1 1. Visii Dur webs-ilv: ww" mic inc-fis, QFC851 Ednwnds- 16B]07-05,0510212017, #P]4256,Page I qf2 Materials Testing & Consulting, Inc. Gaw nird'FnWmt"4"9 * CAmPAIng 0 Speclill hopwOm 0 Holwith Taft 0 En4runmentid Cmimimi FASm"ww4A;rimmnr* Stmo i"I 19-F4 p"i UPLOADED: 05/04/2017 09:40:00 UPLOADED: 05/04/2017 09:40:00 UPLOADED: 05/04/2017 09:41:00 REPORTED BY: Joe Butorac REVIEWED BY: Kevin Walters, PrQject Manager A—Wr—mk. ."wd . dw—Am—w—Aft— 1.16, . —*... - WW� b k' 3401 1113 N riwi. 1p I Fieting A C—ul4ing. 1— A. 11 rim ii�o r.34F li-d Carparaie ', 777 Chrysler Drive a Rarlingtom, WA 9823.11 * Phone .144.7$3.9990 ar Fox 360.1155.19811 SW Region 21 1$ blimck Lali;,t! SPv4- S W.- Olympia. WA 98'.M * Phone 360-134,9777 Fax 360.534,9779 NW Roxion 805 Dvpo:nl SMOL, SURC 5 - fitkilimighmim, WA 9822$ * Phone 160.441,60(il F-Ax 360.647.91 it Vi5ii our wEbsitc- QFC 851 Edmonds - 16B]07-05,0510212017, #P14256, Page 2 qf2