20170518145318.pdfEASTSIDE CONSULTANTS, INC. ENGINEERS-
www.eastsideconsultants.com
May 15, 2017
Mitch Boyd
Stantec Consulting Services
City of Edmonds
6830 NE 185th Street
Edmonds, WA 98028
RE: Lanning Single Family Residence — BLD20161719
Dear Mr. Boyd,
SURVEYORS
RESUB
NjAy 16 2017
BUILDING DEPARTMEKY
CITY OF EDMONDS
Attached are the revised plans per the review comments dated May 15, 2017. The
following is an itemized response to your comments:
GENERAL
1) Noted
2) Noted
3) Added engineering approval block
4) Added construction Sequence
5) Added general construction notes
6) Noted
TESC/DEMO PLAN
1)
Added.
2)
Revised note.
3)
Added note.
4)
Added note.
5)
Added.
DRAINAGE PLAN
1) Irrigation meter and line is not proposed.
2) Pump detail reference added.
3) Added note.
4) Provided rim elevation.
5) Added callout.
6) Changed CB #1.
1320 N. W. MALL STREET, SUITE B, ISSAQUAH, WASHINGTON 98027 PHONE: (425) 392-5351 FAX: (425) 392-4676
7) Lowered pump on elevation.
8) Added seepage rate to plans.
9) Changed to a ribbed PVC pipe tank.
10) Changed to a ribbed PVC pipe tank.
11) Changed to a ribbed PVC pipe tank.
12) Changed to a ribbed PVC pipe tank.
13) Changed to a ribbed PVC pipe tank. Provided buoyancy calculations for new
system.
14) Changed to a ribbed PVC pipe tank.
15) Cut and Fill Table provided.
16) Revised sewer line design to achieve required separation.
17) Note added.
18) Note added.
SEWER/WATER PLANS
1) Note added.
2) Invert elevations added. Anchors added for section of sewer over 20%.
3) Note added.
STORMWATER RE PORT
1) Adherence to the City of Edmonds 2017 stormwater code added.
2) Updated drainage design description to match plans
3) Added description of downstream flowpath. Detention system is not required
because downstream flowpath is adequate to handle the flows.
4) Note added
5) Added seepage rate to report.
Please review the drawings. I can be reached at 425-392-5351 if you have any questions.
Sincerely,
twj�
EASTSIDE CONSULTANTS, INC.
Ronald S. Frederiksen, PE