Loading...
20170518145318.pdfEASTSIDE CONSULTANTS, INC. ENGINEERS- www.eastsideconsultants.com May 15, 2017 Mitch Boyd Stantec Consulting Services City of Edmonds 6830 NE 185th Street Edmonds, WA 98028 RE: Lanning Single Family Residence — BLD20161719 Dear Mr. Boyd, SURVEYORS RESUB NjAy 16 2017 BUILDING DEPARTMEKY CITY OF EDMONDS Attached are the revised plans per the review comments dated May 15, 2017. The following is an itemized response to your comments: GENERAL 1) Noted 2) Noted 3) Added engineering approval block 4) Added construction Sequence 5) Added general construction notes 6) Noted TESC/DEMO PLAN 1) Added. 2) Revised note. 3) Added note. 4) Added note. 5) Added. DRAINAGE PLAN 1) Irrigation meter and line is not proposed. 2) Pump detail reference added. 3) Added note. 4) Provided rim elevation. 5) Added callout. 6) Changed CB #1. 1320 N. W. MALL STREET, SUITE B, ISSAQUAH, WASHINGTON 98027 PHONE: (425) 392-5351 FAX: (425) 392-4676 7) Lowered pump on elevation. 8) Added seepage rate to plans. 9) Changed to a ribbed PVC pipe tank. 10) Changed to a ribbed PVC pipe tank. 11) Changed to a ribbed PVC pipe tank. 12) Changed to a ribbed PVC pipe tank. 13) Changed to a ribbed PVC pipe tank. Provided buoyancy calculations for new system. 14) Changed to a ribbed PVC pipe tank. 15) Cut and Fill Table provided. 16) Revised sewer line design to achieve required separation. 17) Note added. 18) Note added. SEWER/WATER PLANS 1) Note added. 2) Invert elevations added. Anchors added for section of sewer over 20%. 3) Note added. STORMWATER RE PORT 1) Adherence to the City of Edmonds 2017 stormwater code added. 2) Updated drainage design description to match plans 3) Added description of downstream flowpath. Detention system is not required because downstream flowpath is adequate to handle the flows. 4) Note added 5) Added seepage rate to report. Please review the drawings. I can be reached at 425-392-5351 if you have any questions. Sincerely, twj� EASTSIDE CONSULTANTS, INC. Ronald S. Frederiksen, PE