2017-0519 Healthcare Realty spec suite - TGBA.pdfOV EQ_4 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 10, 2017 TO: Gina Dais TGB Architects izdais@tgbarchitects.com FROM: Chuck Miller, Plans Examiner RE: Plan Check: BLD2017-0519 Project Address: 21727 76th Avenue W Project: Healthcare Realty spec suite tenant improvement Scope: Remove/add interior non -bearing walls w/doors, remove/replace suspended tile ceiling system, add/relocate sinks/toilet, reconfigure restroom — B occupancy group — 19 occupants — VB construction — existing NFPA- 13 sprinkler system — mechanical and plumbing included — fire sprinkler system alteration/sprinkler head relocation/fire alarm under separate permit Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicatin2 where the 'clouded' or otherwise highlighted changes can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. On sheet A2.11 — Demolition, Floor, and Ceiling Plans: 1. Plan 1 — Floor Plan a. Clarify on the plan the represented placement of the water heater serving the lavatory in space '112' — Toilet. It does not appear to meet the maximum piping length per Washington State Energy Code (WSEQ Table C404.3. 1. Utilization of an instantaneous water heater for the lavatory is typically proposed to avoid having to install a tank -type water heater in the same space (or immediately on the other side of the wall behind/adjacent the lavatory) and still meet the accessibility requirements of ICC A 117.1-2009. b. Clarify on the plans the represented placement of the water closet. It does not appear to provide the required minimum clearance width around the water closet per ICC Al 17.1-2009 Section 604.3.1 as indicated on sheet 'A8.01' — Toilets and Drinking Fountains (and Water Coolers) — Typical Clearances and Mounting Locations. The Americans with Disabilities Act (ADA) requires that all 'Title IIF regulated structures that contain a primary function area comply. Alterations to the primary function area require that the 'path of travel' is readily accessible to and usable by individuals with disabilities, including individuals who use wheelchairs. The 'path of travel' includes the restrooms. The State of Washington 'State Building Code Council' (SBCC) achieves this objective by the adoption of the International Existing Building Code JEBQ. Per IEBC 410.7, where an alteration contains an area of primary function, the route to the primary function area shall be accessible. The accessible route to the primary function area shall include toilet facilities serving the area of primary function. The costs of providing the accessible route are not required to exceed 20 percent of the costs of the alterations affecting the area of primary function. It appears that by relocating the north wall of space '112' — Toilet - that the required clear minimum clear width around the water closet per ICC Al 17.1-2009 Section 604.3.1 can be provided. On sheet A6.01 — Legends -Casework: 2. Section 4B — ADA Section at Reception (Side Panel sim) — Clarify on the plans the specified depth of the accessible portion of the sales and service countertop. It does not appear to meet the depth requirements of ICC Al 17.1-2009 Section 904.3. On sheet A8.01 — Interior Elevations: 3. Toilets and Drinking Fountains (and Water Coolers) — Typical Clearances and Mounting Locations — Coat Hooks & Robe Hooks — Clarify on the plans the specified mounting height of the coat/robe hook where one is indicated. It does not appear to meet the reach range requirements of ICC Al 17.1-2009 Sections 603.4/308. On sheet A8.11 — Legends — Partitions, Doors, Door Schedule: 4. Door Schedule - Indicate on the plans the required installation of door hardware that does not necessitate tight pinching or grasping, or twisting of the wrist to operate for each of the doors per International Building Code (IBC) 1010. 1.9.1 and ICC Al 17.1-2009 section 404.2.6. Page 2 of 2