Loading...
20170522090255.pdfof F.D4 'k SPECIAL INSPECTION AND TESTING AGREEMENT Permit #: BLD2017-0041 Project: MADRONA SCHOOL - SOILS Pi-ioi- to issitance of a pei-init, thisfoi-in must be completedin. its enth-ety andi-etiti-ned to the City foi- appi-ovaL The coinpletedfoi-in must have signatw�es of acknowledgment by allpai-ties. DUTIES AND RESPONSIBILITIES Special Inspection Firm and Special Inspectors: The Special Inspection firm of 15_,4�044'OAI -0 W1,4AP40"' Moe. will perform special inspection for the following types of work (separate forms must be submitted if more than one firm is to be employed): Reinforced Concrete Bolting in Concrete —Prestressed Concrete —Shotcrete —Structural Masonry —Structural Steel/Welding —High Strength Bolting —Spray applied Fireproofing --Smoke Control Systems —Lateral Wood —Structural Observation by design professional -9-Soils —Other —Other All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO certified, a detailed resume of the inspector and firm must be submitted. The resume must show that the inspector and the firm are qualified by education and experience to perform the work and testing required by the project design and specifications. The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used for inspection, unless they have been approved by the City. hispection records shall include: A daily record to be maintained on site, itemizing the inspections performed, Any nonconforming work shall be brought to the immediate attention of the contractor for resolution. A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the Certificate of Occupancy being issued. This report will indicate that inspection and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. \\cdmm,r-LISC[fS�tiserprof$\bjorback\])esk(op\SI Soils Madrona.doc2/14/2017 Contractor: The contractor shall provide (lie special inspector or agency adequate notification of work requiring inspection. The City approved plan and specifications inust be made available, at thejobsite for 111C LISC OfUIC Special illspector and [lie City inspector, The contractor shall maintain all daily inspection reports, oil site, for review by all parties. The special ilispectioll functions are considered to be ill addition to the normal inspections performed by (lie City and the coritracLor is responsible for contacting the City to SCIMIL11C I-CgUlar inspections. NO Concrete shall be poured or other work C0VCrCd Until approval is given by (lie City inspec(or. Buil(ling Department: The buildhig department shall review ally revisions and addenda. The City inspector Will monitor the special inspec(ion functions for compliance with the agreement. and the approved plans. The City inspector sliall be rospoilsible for approving various stages of construction to be covered and for work to proceed. Design Professionals: The architect and/or engineer will clearly indicaLe oil the plans and specifications the specific types of special inspection required and shall include a scliedLIlC fOr inspection and testing. The architect and/or engineer will coordinate their revision and addenda process in Stich a way 88 to CIISLII-e that all required City approvals are obtained, prior to work shown on the revisions being performed ill the field. Owner: The project owner, or the architect or engineer acting as the owners agent, shall employ the special itispector or agency. ENFORCEMENT A failure of the special inspector or firin to perform in keeping with the requirements of the IBC, the approved plans and this d=lnient, inay void this agreement and the Building Official's approval of the special inspector. fn such a case a lie - w special inspector and/or firin WOUld need to be proposed for approval. A failure of the design and/or constrUCti011 parties to Perf0frn in accordance with this agreement may reSUlt in a STOP WORK notice being posted on the project Until nonconforming itcnis have been resolved, ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agreement. Owner: Taine Wilton Sigila(Lil-C Date 5/19/2017 Contractor: -Signature Ajd7� Date: r1fV117 Arcli./Eng: -�Js Special Special Insp. Agcncy,5;Ae4& ACCEPTED FOR THE CITY OF EDMONDS BUrLDrNG DEPT. By:. Date: Solls Madiomi.doe2/14/2017 Date: 14 IiAhj V V�