SPECIAL INSPECTION AND TESTING AGREEMENT
1 -7 - 0 7_4aO
Flermit
Project: NEIL. Fe�a.
Prior to issuance of a permit, thisform must be completed in its entirely and returned to the Ci4ifor
approvaL The completedform must have signatures of acknowledgment by aff parties.
DUTIES AND RFSPONSIBILITIES
Smial Inspection Firm 34nJ Spociol Insimytors:
The Special Inspection firm of7jioa-W �=�_ _ will perform special
inspection for the following types 6fVork (separate forms must be sub nitted if more than one firm is to be
employed):
—Reinforced Concrete
.---Bolting in Concrete
Prestressed Concrete
Shoterete
-----Str-uctural Masonry
—-Structural Steel/Welding
—High Strengh Bolting
---Spray applied Fireproofing
Smoke Control Systems
_,Lateral Wood
)(Structural Observation by design professional
X Grading/soi Is
—Other -
—Other
All individual inspectors to be employed on this project will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified, a detailed resume of the inspector and firm must be submitted, The resume must show that the
inspector and the firm am qualified by education and experience to perform the work and testing required by the
project design and specifications.
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; detailing the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
0 A final report shall be submitted to the building department prior to the Certificate of0ccupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved &CrepaMiCS MUSt
he detailed in the final report,
C-.%Users\tiic)niquist�AppData'xl.ijcal\Microsoft�Windows\Teinpi)rary Intemet FilesConlent OutlookWCOYMMMSpecial inspection
foun.doc3127/2017
Contractor:
The contractor shall provide the special inspector or agency adequate notification ol'work requiring inspection.
The City approved plan and specifications must be made available, at theJobsite for the use of the special
inspector and the C ity inspector. The contractor shall maintain all daily inspection reports, on site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Building Dygartment:
The building department shall review any revisions and addenda. The City inspector will monitor the special
inspection functions for compliance with the agreement and the approved plans. The City inspector shall be
responsible for approving various stages of construction to be covered and for work to proceed.
Desien Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that all required City approvals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project owner, or the architect or engineer acting as the owners agent. shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approved
plans and this document, may void this agreement and the Building Official's approval of the special inspector.
In such a case a new special inspector and/or firm would need to be proposed for approval- A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved,
ACKNOWLEDGMENTS
I have read and agree to comply with the terms and condition III
A&V_ OA_�t Signature zz�!.x n, to) A 0 Date
Owner. t _(
-7
Contractor: 4 ture Date:
J) 140AC 5V�:bignal _6A
Arch./Eng:_2;ZA-&-- &yo A Swe Yak,,� Signature Date:
Special Insp.Z*.fA0-*e- 6-to JqGSQCkAtAg5 -Signature Datc:L00--
Special Insp. Agcncyz.-W±_- &-.w &SPq!!!kh_e4 -
ACCEPTED FOR THE CITY OF EDMONDS BUILDTNG DEPT.
By� - - f - - ___ - — lkile: _�� Z-/-/P
C:\L),.,crs�thomquist�AppDalaq,ocal\Microsott\Windo%sVl*emporary Intemet Filcs%Coritent.Oullook\VCj3YIKMA�SpecinI inspzction
form,do0/2712017