Loading...
20170523100940.pdfc o In f I u x architecture i In c 5512 - V avenue northeast seattle washington 98105 Chuck Miller, Plans Examiner 05-19-17 Development Services Department, Building Division City of Edmonds, 121 5th Ave N RESUB Edmonds, WA 98020 MAY 2 2 2017 13UILL)ING DEPARTMENT Re: BLD2016-1712 @ 759 Cedar St (conflux #16007) "rY OF EDMONDS Hi Chuck, The following item are in response to your correction letter of 03-16-17. Please note that we have incorporated your correction items into the plans that the client has also amended during the correction cycle. Also note that to give us more clearance from the maximum building height, we have reduced the depth of the roof members and gone to ii spray foam" insulation (see 1 /A-6). Please see delta 1 on drawings. 1. Please see sheet A-3, lower floor plan and window schedule. Added a (E), to indicate an egress window. Added a casement window to the schedule. Please see sheet A-1, south elevation. Added a casement window 2. Window Schedule a. Please see sheet A-3, window schedule. Added various window types. Operable for the purpose of egress. b. Please see sheet A-3, window schedule. Window type changed from "PICTURE" to "DOOR" to match the plans and elevations. c. Main Floor i. Please see sheet A-1, south elevation and sheet A-4, main floor plan and window schedule on sheet A-3. Changed quantity and size of windows. ii. Please see sheet A-11, west elevation and sheet A-2, north elevation and window schedule on sheet A-3. Changed quantity and size of windows. iii. Please see sbeet A-2, north, east elevations and sheet A-4, main floor plan — kitc*kenand window schedule on sheet A-3. Changed quantity and size c(f windows. iv. Please see item iii, above. v. Please see sheet A-3, window schedule. Added window in powder room. Added window in east end of hallway. 3. Please see sheet A-3, foundation plan. Reworded rigid insulation note. Removed "horz. or vert." 4. a. Please see sheet A-3, lower floor plan. Added (E) symbol indicating egress window in bedrooms. b. Please see sheet A-1, south elevation and sheet A-3, lower floor plan and window schedule. There should now be continuity of window information. c. Please see sheet A-2, east elevation and A-3, lower floor plan and window schedule. There should now be continuity of window information. d. Please see sheet A-3, lower floor plan. Please notice existing smoke detector, located inside bedroom #4. Added smoke detector / CO detector, outside bedroom #4. e. Please see response 4 d., above. f. Please see sheet A-3, lower floor plan. Revised note to read — "GAS W/H, SEE TABLE 406.2 ON A-5, FOR MORE INFORMATION". g. Please see sheet A-3, lower floor plan. Revised note to read — "GAS FURNACE, SEE TABLE 406.2 ON A-5 FOR MORE INFORMATION". h. Please see sheet A-3, lower floor plan and area summary. Added a conditioned mechanical room, inside the garage. 5. a. Please see sheet A-4, main floor plan. Added (E) symbol indicating egress window in bedrooms. b. Please see sheet A-4, main floor plan. Added "S.G." to doors with glazing and adjacent window in Great Room. 6. Architectural and Structural plans now correspond. Please also see correction letter by others. (Nickerson Engineering). 7. a. The notes of Section R403.5.3. have been added as a new note #13 in the Insulation portion of the General Notes on A-6. b. Please see sheet A-6, general note 4 under ventilation. Changed the sone rating to 1.0. c. Miscellaneous vi. Please see sheet A-6, general note 6, miscellaneous. Changed "sill" to read "bottom of clear opening". vii. Please see sheet A-6, general note 6, miscellaneous. Changed wording verbatim per IRC R310.1. 8. Please see correction letter by others. (Nickerson Engineering). 9. Please see correction letter by others. (Nickerson Engineering). 10. Please see correction letter by others. (Nickerson Engineering). Please let me know if you have any additional questions. Bryan Bishop / Kirk Christianson 206-523-4414 UNICKERSON ENGINEERING May 16, 2017 Chuck Miller Plans Examiner City of Edmonds Building Division 1215 th Ave N Edmonds, WA 98020 RE: Plan Review Comments dated March 16, 2017, Structural Response 759 Cedar Street Plan Check: BLD2016-1712 Project: Guyot SFR Dear Mr. Miller, The following is an itemized response to the corresponding comments in the above referenced letter. These responses are limited to the structural engineering related items only. Response to other comments is by others. 8. Main Floor Framing Plan - Clarify on the plans the difference in the represented placement of the windows in the south wall of 'Bedroom #Xand of that on sheet 'A-l'— South Elevation. The structural drawings have been revised to reflect the revised architectural drawings. Please see the set of revised structural drawings. 9. Roof Framing Plan a. Clarify on the plans the lateral design method used to transfer the roof diaphragm loads between gridlines "S'and "C'where the upper and lower roofs converge over the west end of the `Kitchen� The offset of the roof levels appears to result in an "open front diaphragm' along the west edge of the lower roof over the 'Kitchen' with the `SWV(6�4") (indicated along gridline 'Vin the provided structural calculations) resisting only the east edge of the upper roof. The load values indicated in the provided structural calculations along gridlines `8' and 'C' and the design to resist them may need to be changed to reflect the response to the plan review comment. b. Clarify on the plans the callout for the 5-112x18 GLB 'low beam-' (beam `8301" in the provided structural calculations) used to support the loads over the west end of the `Kitchen� It appears to be over spanned and deflects beyond that allowed per IRC Table R301.7. It does not appear that the loads from the roof over the "Kitchen' have been accountedfor. Due to the complexity of the roof framing at two different levels, we calculated by hand the load going into the different shearwalls. We have added the hand calculation notes to the key plans. Please see the revised structural calculations where we have indicated Nickerson Engineering LLC - 2221 Everett Avenue, #202 Everett, WA 98201 - (425) 610-4425 UNICKERSON ENGINEERING the loads going into the shearwalls. To be more accurate, we have also revised the lateral calculations to include an additional line of shearwalls in the north -south direction. b. This beam has been revised to include all the applicable loads acting on it, including the low roof area over the kitchen. Please see the revised structural calculations and drawings. 10. Plan Notes — Framing callout 'A'— Clarify on the plans the detail callout regarding the required installation of 'CS16'straps at the top of the door to guide proper construction and inspection. Please see the revised structural drawings which show the correct callout as well as the correct detail. Please also note that the structural drawings and calculations have been revised to reflect the revised architectural drawings. We trust this addresses your concerns. Please do not hesitate to contact us directly if you have any further questions. Regards, Gina Wagenleitner, EIT Nickerson Engineering LLC wagenleitner@nickersonengineering.com 425.610.4425 (o) Nickerson Engineering LLC - 2221 Everett Avenue, #202 Everett, WA 98201 - (425) 610-4425