Loading...
20170523103101.pdfENGINEERING May 10, 2017 civil & structural engineering & planning Jeanie McConnell, Engineering Program Manager City of Edmonds 121 5th Avenue N Edmonds, WA 98020 RE: Application #BLD20161712 Project Name: Guyot — Single Family Residence Project Address: 759 Cedar Street Dear Ms. McConnell, RESUB MAy 12 2017 BUILDING DEPARTMENT CITY OF EDMONDS Itemized below is our response to the review comments in the April 1, 2017 letter for the above referenced project. Our response appears in bold. GENERAL 1. Submit Row Permit Application form Noted. Client to provide. 2. Submit Side Sewer Permit Application form Noted. Client to provide. 3. Revise General Notes to reflect 2016 standard specs. Updated. 4. Show haul routes — 91h Ave, to SR-104, to 1-5. Added. 5. Show mailbox location Added to C3.1 Plan Sheet C2.1 —TEMPORARY EROSION CONTROL PLAN 1. Orange protective barrier fencing shall be placed at the drip line of trees to remain. Noted on plan 2. Clearly show section of existing curb/gutter on Cedar Street to be removed and replaced. it is only the area on the radius. This section has been highlighted and circled. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 www.cgengineering.com Cedar House Civil Design - CG #16326.20 Civil Comment Response #1 Sheet C3.1 —GRADING AND UTILITY PLAN 1. Revise plan sheet title to include "frontage improvement". Added as noted. May 12, 2017 Page 2 of 4 2. New curb and gutter shall be installed along entire 8th Ave S property frontage, including through the driveway approach and up to new CB to be installed at NE corner of property (see comment below). Callout requirement for new curb & gutter and reference City standard details E2.8 as provided on sheet C3.2. Added curb as indicated 8th Ave S right-of-way shall be improved to public road street standards, not private road standards. Minimum lane width is required to be 11-feet in each direction of travel. Refer to city standard detail E2.1.3. It has been previously discussed and agreed that the subject property would only be responsible for adding half of the additional area required to meet 22-feet. In scaling the plans, the existing road is 12-feet in width. An additional 10-feet would be required to meet road standards, 5-feet of which the subject property is responsible for. In widening the street, the existing slope of 8th Ave S needs to be reviewed. The existing street slope is inconsistent and a portion of the existing road section may need to be removed in order to add 5-feet of pavement and meet City standards. Provide a cross section and profile of the existing street section and clearly show on the plans removal and replacement of existing pavement as required. -Please add a note to the plans that final restoration of utility patches shall be completed by the contractor. Utility patches shall be combined and full width or half width overlay will be required depending on the extent of disturbance. Where utility patches fall entirely within one travel lane, the overlay shall extend to the centerline of roadway. Where utility patches extend into both travel lanes then a full width overlay is required. Per our discussion the required road width is to be 17 feet, based on the 12 foot "approximate" condition and the 22 foot required width. This leaves 10 feet to be developed, 5 feet of which the project is responsible for, 12 foot assumed existing condition plus the 5 foot additional paving required. This point is established as 12.5' from the CL, which is approximately 5' from the west edge of the existing pavement. This addition is +/- to keep the curb location uniform. The radius limits this widening on the north side of the street improvements, so per our discussion the City expectation would be that we "round out" the other side of the road from its existing irregular shape. This is a minimal addition. The Altmann Oliver Associates report dated 10.26.16 (included in Drainage Report) exempts the project from prescribed buffer widths due to legally established paved areas per ECDC 23.40.220.C.4. it is expected that the City will consider this minimal addition to even out the turn, all south of the guardrails prohibiting vehicle access toward the wetland, will be similarly allowed. Notes are provided on the plan to have the City inspector finalize the exact limits on the east side. A section and profile are included on C3.1 and C3.2 respectively. Note on patches and overlay were added to C3.1 4. As indicated by the Fire Department, a fire sprinkler system is required for this property. Typically if there is an existing water service line from the water main to the meter, the water service line/meter will not be the appropriate size and a new tap will be required. The applicant will be required to pay for the new tap on the main and the new meter. a. Please add a note that a 1" meter is to be installed 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 ENGINEERING www.cgengineering.com Cedar House Civil Design - CG #16326.20 Civil Comment Response #1 May 12, 2017 Page 3 of 4 Show the water meter located in the right-of-way, such that the back of the meter is on the property line. The water meter shall not be located within the driveway. Please show a 1-1/2" water service line to be installed from the back of the meter to the house (as required for a combination fire and domestic service). Please label the pipe material and note tracer wire to be installed on the water service line (if line is not copper). Water line revised and labeled as indicated. It appears as though the existing side sewer and lateral are proposed for re -use. A portion of the existing sewer line will be cut and capped (near the property line) with the demolition of the existing single- family residence. Clearly show a new section of side sewer and label the rest as existing, addressing the following: a. Any portion of the existing side sewer proposed for re -use shall be TV'd by the contractor and video must be submitted to the City for review and approval to re -use. Revise plan notes to indicate such. b. For the existing sewer lateral, the City's Public Works Department will need to TV the lateral to determine if it is acceptable to re -use. Add notes to the plans to contact Edmonds Public Works Sewer Division, 425-771-0235, to schedule inspection. c. If a new sewer lateral is required and the connection will be core drilled, the connection at the sewer main shall be per City standards and with a Romac Inserta-tee. if the sewer connection will be cut in then a wye will be required. d. Label sewer pipe material and size. The sewer lateral (from the main to the property line shall be 6". Once on private property the sewer may reduce to 4". e. A cleanout shall be provided within 2-feet of the building. f. Provide invert elevations at the cleanout at the property line and at the house so that a minimum 2% slope and minimum 2' pipe coverage can be verified. Added notes to plan. Changed sewer to "new" on site. 6. Show all dry utilities and required utility separation. a. Please add a note that a minimum of 3' separation is required between the dry utilities (power, gas, phone, cable, etc.) and sewer, water, and storm and Tfrom any City main lines. b. All utilities shall be placed underground. Utilities shown, note has been added. 7. Please confirm impervious surface area calculations include the concrete walkway and any proposed patios. Yes, these have been included. Detention system is shown to be manifold system, however, pipe connections at each end are not clearly indicated. At a minimum a riser shall be shown at each corner of the detention system. This can be accomplished with CB's or pipe risers. The two CB's shown would be the minimum required. In addition, are the short pipe sections also proposed to be 18" in diameter? Risers added. Connector pipes called out as 18" diameter. 4= CM CENGINEERING 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 www.cgengineering.com Cedar House Civil Design - CG #16326.20 May 12, 2017 Civil Comment Response #1 Page 4 of 4 9. A catch basin shall be installed at the edge of right-of-way at the NE corner of the property. The detention outfall will tie into this structure. Storm crossings within City right-of-way shall be with 12" pipe. Added CB in new flow line. Added 12" pipe downstream of detention. 10. Revise Catch Basin Schedule as follows: a. Indicate pipe size at each IE and direction callout. b. Add CB details for new CB to be installed per comment 9 above. c. Add Existing Type I CB (CB is in 8th Ave and north of "alley") and provide invert elevation for new 12" pipe connection. Added information per comment. 11. Revise Detail 3 as follows: a. CMP is not an approved detention pipe material. Please revise detention pipe material and control structure pipe material accordingly. b. b. Please add a note to the plans that if the rim to invert elevation exceeds 5-feet then a type 11 manhole will be required. Revised to N-12, note added. 12. Driveway trench drain shall connect to detention system at a structure. Please revise plan accordingly. Connected to roof drain, which connects to structure 2. if you have any questions or comments regarding the responses to this review please do not hesitate to call. Sincerely, CG Engineering tGreGu' len, PE, SE C1 Princi I 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 ENGINEERING www.cgengineering.com