Loading...
20170526082714.pdfCity of Edmonds Eric Carter, Plans Examiner Building Division 121 5th Ave N Edmonds, WA 98020 Dear Erik; Colin D Thompson 18329 72nd Ave W Edmonds, WA 98026 425-778-2176 May 24, 2017 'RESUEI MAY 2 5 2017 BU'LD'NG I)EPARNEW C17TOFEDMOND,3 Re: Plan Check: BLD2017-0001 Project Address: 18329 72nd Ave W Scope: Alteration/Remodel - R-3/1.1 Occupancy Group V-B construction -mechanical and plumbing included Pursuant to our conversation earlier today please find below my responses to the "clouded" areas in the permit application. Comment #1 The "Scope of work" portion of the permit application remains the same until such time as I can assess the state of the existing cement block foundation and the underlying footing, which either one or both may need to be replaced. Sheet 3: Comment #2 The window located at the master bath soaker tub will be "safety glazed" per IRC 308.4.5 The window located within the shower enclosure of the second bath will be set such that the lower edge of the glass will be 72 inches above the standing or walking surface per IRC 308.4.5. Comment #3 The Per energy credit has changed to 113. All new vertical fenestrations will have a U value of .25 or better. Comment #4 The existing hot water tank to be installed within the closet is electric, hence no combustion air is required. Comment #5 An 50 CFM exhaust fan with sone rating of 1 .0 or less is in the existing laundry room. This fan will be modified to be in continuous run mode thereby fulfilling the requirements of Table M 1 507.3.3(l) for a Dwelling Unit Floor Area of < 1500 sq. ft. and 2 bedrooms. Each bedroom will have a 4" diameter fresh air vent and an operable window per IRC M1 507.3.4.4 Eff icient Water Heatiog 5A In order to meet the 0.5 energy credits. The shower heads in the proposed bathrooms will be rated at 1.75 GPM or less and all lavatory faucets in the proposed bathrooms will be rated at 1 .0 GPM Or less. Sheet:6 Comment #6 Per energy credit 1 B Efficient Building Envelope: wall insulation > R-21 plus foam sheathing > R-4 and floor insulation > R-38 Comment #7 Per energy credit 1 B Efficient Building Envelope: Table 402.1.1 Ceiling insulation > R-38