Loading...
20170530142848.pdf\v: V i) TING AGREEMENT SPECIAL INSPECTION AND TES Permit #: BLD2017-0496 Projeet: _1015 12"' AVE N EDMONDS.WA 98020 Prior to issuance. of a permit, ihisform must be completed in Us entirety and retarned to the Chyfor approval. Tike completedform must have signatures. of acknowledgment by all parties. J)UTIES AND RESPONSID111TIES Snecial lasoection Firm and Siveciall Inspectors: The Special Inspection firm Of aAln �')fk_zec XA99Q2��ill Letform Special inspectionfor the following types of work (sepaTate forms Must be submitted if more than one firm is to be employed): _X —Bolting in Concrete —X—Structural Observation by design professional _X_Grad.ing/soils X Structural Steel/Welding All individual inspectors to,be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is hot covered by the WABO categories, or the Inspector is not WABO �ertified, a detailed resurneof the inspector and firm must be Submitted, The resume must show that the .inspector qftd . the, firin art qualified by.educaticiii and experienct to�petform the work and testing required by the project design and Specifications. Th6 work shall be inspected for conformance with the plans and specifications approved by the City. Revisions and addenda sheets will not be used, for inspection, unless they havc� been. approved by the City. inspection records shall include,, A daily record to be maintained on site, itemizing the inspections peeformed. Any nonconforming work shall be ught to the immediate attention of the contractor for resolution. ,, bro s A weekly re ort shallbe submitted to the City; detailing the inspections and testing performed, list' F Ing any nonconforming work and resolution of nonconforming items. A final report shall be submitted to the building department prior to the CertificatiD of Occupancy being is,sued, This report will Indicate that inspeotion and testing was completed in conformance with the approved plans, specifications and approved revisions or addenda-. Any unresolved discre ancies must p be detailed in the final report. Contractor: The contractor shall provide the special inspector or agency adequate notification of work requiring inspection. d:kljsdts\mbaile)AAppDala\Local\MicrosoftkWindows\Tcmpormy Wernet Files\Content.Outlook\OWNW4rn'I\SpeciaI Inspection fbnn BLD2017-0496.dodh/2017 The City approved plan and specifications must be made available, at the Jobsite for the use of the special in.s toy. The contractor shall maintain all daily inspection reports, on site, for review by , pector and the City insper all parties. The special inspection functions are considered to be in addition to the normal inspections performed by thp City and the contractor is responsible , for contacting the City to schedule reguilar inspections. No concrete shal I be poured or other work covered until approval is given by the City inspector. Building Degartment: The building department shall review any revisions and addenda. The City. inspector will monitor the special inspection functions for com lans. The City inspector shall be pliance with the agreement and the approved p responsible for approving various stages of construction to be covered and for work to proceed. Desiom Professionals - The architect and/or engineer will clearly indicate on the plus and specifications the specific types of special inspection required and shall include a schedule for inspection and testing. The architect and/or engineer will coordinate their revis I on and addenda process in such a way as to ensure that all required City approvals are obtained, prior to Work shown on the revisions being performed in the field. Owner - The project owner, or the architect or engineer acting as the owners agen4 shall employ the special inspector or agency. ENFORCEMENT A failure, of the special inspector or firm to perform in keeping with the require.i.bents of the IBC, the approved plans and this docuinenti may void this agreement and the Building Official's approval (if the special inspector. In such a case a new special inspector and/or firm would need to be proposed:for approval. A failure of the des . ign and/or construction parties to perform in accordance with this agreement may result in a STOP WORK notice being posted on the project until nonconforming items have been resolved. ACKNOWLEDGMENTS I have read and agree to comply with the terms and conditions of this agareement. Owner: 1AA4* A -------,Signature Date I 1W4AVW\( etteym.-rwl Contractor, w1ccliv..A. 1�01 A Signature Datej-i--i7 % Arch./Eng: WICAVS-S Signature Date: Special Insp. %) A2-f Signatu Special Insp. Agency ACCE PT F r, HE CITY OF EDMONDS BUILDING DEPT. By: Date:4 CtlUscrs\mbiiiloy\AppData\LopaiNicrosoft\Windows\Temporary Interna Files\Con(ent.Outloc)k�OMNW4TTI\SpeoiaI inspection form BLD2017.0496.60/1/2017