Loading...
20170608125603.pdfDESIGN - BUILD - BALANCE Date: 06-05-17 To: City of Edmonds — Permits and Development From: Megan Knight Mega ti@crddesigtibuild.com OAL, 515 Re: Application#: 131-132017Q-566 Project: McDaniel/Buendia Home Remodel Project Address: 724 Walnut St. The responses below are in response to the comments supplied by the planning/building, engineering, and building division of the City of Edmonds. You will find their original comments attached. Planning/Buildin 1. Critical area checklist: please submit a completed critical area checklist for the site. - The critical area checklist has been submitted. 2. Accessory dwelling unit: the May 15 plans show the creating of an accessory dwelling unit in a former storage area in the basement. That is not permitted unless a land use permit for the secondary use is first obtained. - The land use permit has been applied for. Engineering Division Site Plan 1. Show all City easements. There appears to be a slope easement along the north property line. - City easement shown on the North end of the property line on page AO.1 2. All existing utilities should be shown from the city main line/lateral to the existing structure. - Shown on the north end of the site plan on page AO.1 3. Show filter fence on the plans and incorporate and reference the city standard detail E1.1 - Filter fence shown along the new walls of the garage. All other work is interior. 4. Show construction entrance on the plans and incorporate and reference City standard detail E1.2. If the existing driveway is to be used as the construction entrance, please indicate on the plans how construction storm water will be mitigated. TEL 211 FAX 211 782 782 6959 2679 CRDdesignbuild.corn 3929 stone way north seattle, wa 98103 DESIGN - BUILD - BALANCE Construction entrance will be the same as existing driveway, shown on site plan. We believe 100% of the storm water will be onsite. All other runoff will be handled by filter fence or filter sock. 5. Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site. Incorporate and reference city standard detail E1.3. - Note added to plans. 6. Please add a note to the plans that all disturbed soils will be compost amended per BMP T5.13. - Note added to plans. 7. Add note: install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction. - Note added to plans. Building Division 1. identify all window sizes where altered or where rooms have remodel work proposed. - Window sizes noted on plans. 2. Provide structural drawings for the carport to garage conversion including: a. Foundation plans and details, footing and stem wall size, rebar, etc b. Wall section details c. Roof plan and header sizes d. Identify what will remain and what will be demolished. - See construction detail on page A2.2 Megan M. Knight Project and Interior Designer CRD Design Build TIL 211 FAX 216 782 782 6959 2679 CRDdesignbuild.corn 3929 stone way north seattle, wa 98103