June 12, 2017
Ms. Jen Machuga
Associate Planner
City of Edmonds
Via: Hand Delivery
RE: Replacement / Demolition Cost Analysis - McClurg Resident
746 Somerset Lane, Edmonds WA 98020
Dear Ms. Machuga
JUN 15 2017
BUILUNG, DEPA ",Ar-NT
CITY OF EDMONDS
Per your request, attached is our analysis of what the replacement cost would be of the existing
house at the above referenced address. Also included in our analysis is the value of the
remaining items/structure after the specific demolition planned, based on the remodel plans
being permitted.
We arrived at these numbers based on: 1) our previous experience completing similar remodels
and construction projects over many years, 2) pricing we re6eived from product/material supply
houses we called and received quotes from, and 3) bids we received from sub -contractors we
contacted for this analysis.
We are very confident in our numbers and the accompanying analysis, but are happy to discuss
with you ffirther or answer any questions you might have.
Sincerely,
Tersuli Construction Services
Jeff Johnson
Project Manager
McClurg - 746 Somerset Lane Demo Analysis
Building Component
Cost/SF
Sq, Ft.
Total Cost
Y. Darno'd
Remaining
Value Remaining
Comments
Foundation
$7.00
2,994
$20,888
11%
2,954
$20,679
Includes Garage
Slab on Grade
$5.00
2,495
S12,475
Z395
$11,976
IncludesGarage
Flooffrarning
L7.UO
1,5
SIU,92o
5%
L482
$10,374
Wall Framing
$6.25
4,OS5
S25.344
55%
1,825
M405
Includes Garage
Roof Framing
$S.00
4,OS5
$20,275
Ift
3,6SO
$18,248
Includes Garage
Wall Insulation
$0.60
5,480
$3,288
100%1
0
so
Atticinsulation
$0.87
1,60U
$1,392
100%
0
so
Siding
S8.
2,
$18,700
46%
1,188
$10,098
Plumbing
$4.15
31120
$12,948
SIP.,
156
$647
Electdcal
$5.25
3,120
$16,380
JOODA
0
$0
'Drywall
S1.2S
11,021.
$13,776
93%
771
$964
Interior Garage rernains
Roofing
$5.00
3,163
$15,81.5
1000A
0
Bulk/Package Work
Cost/Unit
Units
Windows
s5w.00
18
$9,000
100%
0
$0
Doors
S200.00
17
53,400
100%
0
$0
HVAC
$11,350.00
1
$11f3SO
100%
a
$0
CablnetPackage
$12,000.00
11
$12,000
100%
ol
�O
Garage Doors
$1,200.00
2
$2,400
WA
2
$2,400
Chimney/Masonry
$6,750.00
1
$6,7501
(),A
1
$6,750
Roof Truss Package
$14,600.00
1
$14,600
101A
1
$13,140
Total Replacement Cost
Total Remaining Value
Demolition Percentage
$231,701,
$106,681
54.0%