Loading...
20170616095837.pdfJune 15, 2017 CITY Copy RESUB Attn: Jen Machuga. City of Edmonds Budding Division CUIJ)!PM, OPPARTMTE 121 5th Ave N eTfY"Y;F-'A--'! �, twin Edmonds, WA 98020 circhitecture ; design I received the correction notice for project #BLD2044445-2-dated November 16, 2016. Below are the requested corrections and locations on the drawings that they can be found: 1. SITE PLAN a. Retaining walls have been clearly marked with arrows on site plan. No retaining walls are proposed within minimum required setback areas. Refer to 02 Sheet. b. Eaves have been dimensioned on site plan. Refer to 02 Sheet. c. The trellis on the western side of the addition has been added to the Site Plan. Refer to 02 Sheet. 2. SETBACKS a. See attached documentation from Builder and Owner verifying the work proposed does not involve destroying/ damaging the existing nonconforming structure in an amount equal to 75 percent or more of its replacement cost. b. See attached revised survey documenting the property line relationship to existing concrete foundation. Refer to the photos below where the existing foundation has two different conditions along the north face of the existing house. Figure 1, taken at the northwest comer of the existing home, illustrates the foundation flush with the existing framing. Figure 2, taken at the northeast comer of the house, illustrates that the foundation stands proud of the siding by several inches. Ibis change in foundation condition is now documented on the revised survey. The proposed additions will follow the line of the existing framing with a more typical foundation condition, thus allowing the new additions to be within the existing 10'-0" setback requirements. c. All existing and new structure setbacks are indicated on the site plan. Refer to 02 Sheet. d. The 10' side yard setback is indicated on Sheet A1.2, A1.3, A2.0, and A2.1. There is a note on the floor plans and elevations indicating the new and existing portions of the house. existing building (north face) Figure 1, Foundation flush w/ framing at NVV corner of existing building (north face) 3. The Lot Area is documented on the survey as 13,778.5 sf and remains as noted on the plans. 4. See attached statement signed by the owners indicating they do not intend for the lower level space to be utilized as an ADU. 5. HEIGHT CALCULATIONS a. The datum point and elevation has been added and clouded on Sheet 02. 23020 Edmonds Wag, -113, Edmonds, WA 98020 1 p. 206.542.3734 1 e. heldiGh2dcrr-hftects com I w. h2dcirch�ects.com b. Point B has been modified. The average grade and height calculations have been adjusted accordingly and clouded on Sheet 02. c. The proposed building height has been added to the Average Grade chart on Sheet 02 and clouded. 6. Lot coverage calculations have been added to the Site Plan. Refer to 02 Sheet. Note: All revisions are clouded on the drawings. I can be reached at 206-542-3734 or at heidi @)h2(Firchirccts.con with any further questions. Regards, Heidi Helgeson Principal H2D Architecture + Design 23020 Edmonds WaW, -113, Edmonds, WA 98020 1 P. 206,542.3734 1 e. hekJOh2cIcrchftects.com I w h2darchftects.00m