Loading...
2017-0662 Nishiwaki Alteration.pdfCity of Edmonds OV EDAI 0 PLAN REVIEW COMMENTS . ..... BUILDING DIVISION (425) 771-0220 DATE: June 1, 2017 TO: Homero Nishiwaki HomerokLN-ARC.com FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2017-0662 Project Address: 23615 96th PL W Scope: Alteration / Single Family Dwelling, — R-3/U occupancy group — V-B construction— mechanical and plumbing included Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the 'clouded' or otherwise hi2hli2hted chanus can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 d Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. This building plan review cannot be completed until we receive the following items: Sheet A- 1: 1. 2012 code references are mentioned in multiple areas of the notes. Please change the outdated code references to the applicable 2015 codes. Sheet A2: 2. The proposed bathroom, north of the kitchen requires a local exhaust fan. Please indicate a local exhaust fan with a minimum of 50CFM on the plans. Sheet A3: 3. The proposed double 2x8 header supporting the roof load over the new double doors to the deck appears to be over spanned. Without clarification, it is assumed that these 2x8's are HF #2. Please clarify header species or upsize header to accommodate anticipated loads. 4. It appears from detail I/A4 the roof is "stick framed". With conventional stick framed construction there is generally an intermediate brace that transfers roof load to the ceiling joist. Without clarification of the roof assembly's construction, I am unable to verify the triple 2x12 beam that is proposed is adequate. Please add to the plans the species and grade of the beam as well as the any clarification of the roof structure construction. 5. It appears that the new triple 2x8 beam over the proposed bathroom is extremely overstressed for the anticipated loads. Please clarify and change on the plans. Furthermore; verify the existing structure will accommodate the anticipated loads and indicate on the plans the size of the supporting foundation. Sheet 4: 6. Detail 6 indicates a 2x8 deck ledger with 1/2"x5" lags bolts 32' O.C. used as attachment. The anticipated loads exceed the allowed values of 1/2" lag bolt of the proposed spacing. Furthermore; the lag bolts must be installed in compliance with IRC 507.2.1 (1), which requires the bolts to be staggered. Please change on the plans. Page 2 of 3 Page 3 of 3