Loading...
20170728134738.pdf01C ED40 A.- "'0 CITY OF EDMONDS Al PLAN REVIEW COMMENTS RESUS ENGINEERING DIVISION (425) 771-0220 JUL 2 6 2017 City Website: www.edmondswa.gov BU'LDINIG DepARTMet4r Cf7-Y OF EDMONDS DATE: July 17, 2017 TO: Andrew Phillips CRD Design Build Andrew@crddesignbuild.com FROM: Mitch Boyd, Stantec Consulting Services Mitch.Boyd@edmondswa.gov RE: Application #: BLD20170614/5 Project: Laughtland — Demo / Single Family Residence Project Address: 926 Walnut St During review of the above noted application, it was found that the following information, corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or Fire may result in additional comments. Please submit two ����ocutnents including a written response to each item below. Resubmittals can be made at the Development Services Department on the 2 nd floor of City Hall. Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon. City of Edmonds handouts, standard details, application and other forms, and development code may be referenced on the City website: www.edmondswa.gov I under Services/Permits and Development. UTILITIES AND GRADING PLAN — BLD20170615 1) With the proposed driveway grading, there driveway slopes at 11% between the back of walk and the property line. Revise the driveway to reduce the grade break between the driveway and back of walk. DEMO PLAN — BLD20170614 1) If the existing side sewer is to be re -used, the line must be cut and capped a minimum of 20' from existing and/or proposed foundation, whichever is closest to the property line. 2) If the existing water service line is to be re -used, the line must be disconnected at the meter during construction. Please install a hose bib with an AVB at the meter during construction. 3) Show existing utilities on the plans. eNGINErERING July 25, 2017 civil & structural engineering & planning Mitch Boyd, Stantec Consulting Services c/o City of Edmonds 121 5th Ave N Edmonds, WA 98020 RE: Application #BLD20170614/5 Project Name: Laughtland — Demo / Single Family Residence Project Address: 926 Walnut Street Dear Mr. Boyd, RESUB JUL 2 6 201? BUILDING DEPARTMENT CITY OF EDMONDS Itemized below is our response to the civil review comments in the July 17, 2107 letter for the above referenced project. Our response appears in bold. UTILITIES AND GRADING PLAN — BLD20170615 1. With the proposed driveway grading, there driveway slopes at 11% between the back of walk and the property line. Revise the driveway to reduce the grade break between the driveway and back of walk. The driveway grading has been revised. The maximum grade between the back of walk and the property line is now 8.3% along the west side of the driveway. The maximum grade is 12% for the driveway along the west side. The average slopes are shown on sheet C3.1. DEMO PLAN — BLD20170614 if the existing side sewer is to be re -used, the line must be cut and capped a minimum of 20'frorn existing and/or proposed foundation, whichever is closest to the property line. This note is shown sheet C2.1 See Note 4. 2. if the existing water service line is to be re -used, the line must be disconnected at the meter during construction. Please install a hose bib with an AVB at the meter during construction. This note is shown on sheet C2.1. See Note 2. 3. Show existing utilities on the plans. Existing utilities are shown on sheet C2.1. if you have any questions or comments regarding the responses to this review please do not hesitate to call. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778.5536 www.cgengineering.com Laughtland Residence 17074.20 July 25, 2017 Comment Response — Civil #2 Page 2 of 2 Sincerely, CG En ineering t n ineert Greg uill PE, SE Principa 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph. 425.778.8500 1 f. 425.778,5536 GINIGINC-E-RING www.cgengineering.com