20170728134738.pdf01C ED40
A.- "'0 CITY OF EDMONDS
Al
PLAN REVIEW COMMENTS RESUS
ENGINEERING DIVISION
(425) 771-0220 JUL 2 6 2017
City Website: www.edmondswa.gov BU'LDINIG DepARTMet4r
Cf7-Y OF EDMONDS
DATE: July 17, 2017
TO: Andrew Phillips
CRD Design Build
Andrew@crddesignbuild.com
FROM: Mitch Boyd, Stantec Consulting Services
Mitch.Boyd@edmondswa.gov
RE: Application #: BLD20170614/5
Project: Laughtland — Demo / Single Family Residence
Project Address: 926 Walnut St
During review of the above noted application, it was found that the following information,
corrections, or clarifications are needed. Reviews by other divisions, such as Planning, Building, or
Fire may result in additional comments. Please submit two ����ocutnents
including a written response to each item below.
Resubmittals can be made at the Development Services Department on the 2 nd floor of City Hall.
Permit Center hours are M, T, Th & F from 8am-4:30pm and on Wednesdays from 8:30am-noon.
City of Edmonds handouts, standard details, application and other forms, and development code
may be referenced on the City website: www.edmondswa.gov I under Services/Permits and
Development.
UTILITIES AND GRADING PLAN — BLD20170615
1) With the proposed driveway grading, there driveway slopes at 11% between the back of
walk and the property line. Revise the driveway to reduce the grade break between the
driveway and back of walk.
DEMO PLAN — BLD20170614
1) If the existing side sewer is to be re -used, the line must be cut and capped a minimum of 20'
from existing and/or proposed foundation, whichever is closest to the property line.
2) If the existing water service line is to be re -used, the line must be disconnected at the meter
during construction. Please install a hose bib with an AVB at the meter during construction.
3) Show existing utilities on the plans.
eNGINErERING
July 25, 2017
civil & structural
engineering & planning
Mitch Boyd, Stantec Consulting Services
c/o City of Edmonds
121 5th Ave N
Edmonds, WA 98020
RE: Application #BLD20170614/5
Project Name: Laughtland — Demo / Single Family Residence
Project Address: 926 Walnut Street
Dear Mr. Boyd,
RESUB
JUL 2 6 201?
BUILDING DEPARTMENT
CITY OF EDMONDS
Itemized below is our response to the civil review comments in the July 17, 2107 letter for the above
referenced project. Our response appears in bold.
UTILITIES AND GRADING PLAN — BLD20170615
1. With the proposed driveway grading, there driveway slopes at 11% between the back of walk and
the property line. Revise the driveway to reduce the grade break between the driveway and back of
walk.
The driveway grading has been revised. The maximum grade between the back of walk and the
property line is now 8.3% along the west side of the driveway. The maximum grade is 12% for the
driveway along the west side. The average slopes are shown on sheet C3.1.
DEMO PLAN — BLD20170614
if the existing side sewer is to be re -used, the line must be cut and capped a minimum of 20'frorn
existing and/or proposed foundation, whichever is closest to the property line.
This note is shown sheet C2.1 See Note 4.
2. if the existing water service line is to be re -used, the line must be disconnected at the meter during
construction. Please install a hose bib with an AVB at the meter during construction.
This note is shown on sheet C2.1. See Note 2.
3. Show existing utilities on the plans.
Existing utilities are shown on sheet C2.1.
if you have any questions or comments regarding the responses to this review please do not hesitate to call.
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778.5536
www.cgengineering.com
Laughtland Residence 17074.20 July 25, 2017
Comment Response — Civil #2 Page 2 of 2
Sincerely,
CG En ineering
t n ineert
Greg uill PE, SE
Principa
250 4th Avenue South, Suite 200
Edmonds, WA 98020
ph. 425.778.8500 1 f. 425.778,5536
GINIGINC-E-RING www.cgengineering.com