RESPONSES TO REVISION 4,2ND REVIEW DATED 07-28-17
Mr. Miller,
AUS 0 3 20117
DEVELONOENT SERVICES
Enclosed you will find the following in response to your review:
• A letter from the owner of Edmonds Memory Care, LLC and a letter from Andy
Bremmeyer stating that Andy has been hired as the new architect to take over the
previous work of Richard Swanson.
• Updated Plan Sheet A2.3 — Rated Assembly — clouded with Delta 11 — detailing
installation criteria for floor/ceiling Assembly B.
If you have questions or need anything else, please advise.
Thank you,
Jeff Yates
Partner and Vice President
RJ Development
jeff@rjdevelopment.com
360-918-6037
RJ Development
401 Central St SE — Olympia, WA 98501
(360) 528-3343 — www.r development.com
Edmonds Memory Care, LLC
August 2, 2017
E V1 s #
Chuck Miller AUG 0 3 2017
Plans Examiner
Building Division e(JILD)KIG DC- PA'�--MENT
th 1
1215 Avenue N CITY OF EDM6NDS
Edmonds, WA 98020
Mr. Miller,
As you are aware, Richard Swanson, the architect we hired for the Cedar Creek Memory Care project,
recently passed away unexpectedly. We have hired Lyle Andy Bremmeyer with Wedgewood
Architectural Services as the substitute design professional in responsible charge for the remainder of
the project.
Andy Bremmeyer is an acceptable alternative to Mr. Swanson. Please accept this letter as our response
to General Plan Review Note #8. We have included a letter written by Mr. Bremmeyer, in which he has
accepted the prior work prepared, signed and stamped by Richard Swanson.
If you have any additional questions, please reach out to Jeff Yates at jeff@rjdevelopment.com or 360-
528-3343.
Sincerely,
Aaron Koelsch
Owner - Edmonds Memory Care, LLC