Loading...
20170804161633.pdft" RY1, -- RJ DEVELOPMENT � I N I U P ', H 0 0 S I N 6 0 1 t I V I R EIE7 - E7P T11 EDMONDS MEMORY CARE PERMIT #BLD20150032 21006 72ND AVE W., EDMONDS, WA RESPONSES TO REVISION 4,2ND REVIEW DATED 07-28-17 Mr. Miller, AUS 0 3 20117 DEVELONOENT SERVICES Enclosed you will find the following in response to your review: • A letter from the owner of Edmonds Memory Care, LLC and a letter from Andy Bremmeyer stating that Andy has been hired as the new architect to take over the previous work of Richard Swanson. • Updated Plan Sheet A2.3 — Rated Assembly — clouded with Delta 11 — detailing installation criteria for floor/ceiling Assembly B. If you have questions or need anything else, please advise. Thank you, Jeff Yates Partner and Vice President RJ Development jeff@rjdevelopment.com 360-918-6037 RJ Development 401 Central St SE — Olympia, WA 98501 (360) 528-3343 — www.r development.com Edmonds Memory Care, LLC August 2, 2017 E V1 s # Chuck Miller AUG 0 3 2017 Plans Examiner Building Division e(JILD)KIG DC- PA'�--MENT th 1 1215 Avenue N CITY OF EDM6NDS Edmonds, WA 98020 Mr. Miller, As you are aware, Richard Swanson, the architect we hired for the Cedar Creek Memory Care project, recently passed away unexpectedly. We have hired Lyle Andy Bremmeyer with Wedgewood Architectural Services as the substitute design professional in responsible charge for the remainder of the project. Andy Bremmeyer is an acceptable alternative to Mr. Swanson. Please accept this letter as our response to General Plan Review Note #8. We have included a letter written by Mr. Bremmeyer, in which he has accepted the prior work prepared, signed and stamped by Richard Swanson. If you have any additional questions, please reach out to Jeff Yates at jeff@rjdevelopment.com or 360- 528-3343. Sincerely, Aaron Koelsch Owner - Edmonds Memory Care, LLC I I I Market Street NE, Suite 200 Olympia, WA, 98501 - 360-867-1900