Loading...
20170814112232.pdftgb Memorandum Date August 7, 2017 To Department of Health, City of Edmonds From Richard Project SEMC Pharmacy Project # 15080 Subject: Drawing revisions for 800 Room QFO)mil MEW OND'§ he general scope of Revision Delta 4 is to add an 800 Room (E1345) in compliance with USP 797. Theplacementof the 800 Room (E1345) is requires to be placed adjacent to the Chemo Room (E1344). The Electrical Room (E1360) is displaced and relocated at the end of Hall El 350.001. The addition of the 800 Room (El 345) displaces the Electrical room (El 360) to the end of Corridor (El 350.002). Other design changes were incorporated as described below Page Description AO.22 Corrected plan and occupancy load calculations for Conference Room (E 1358) and Break Room (E 1359) due to the switch of room function and relocation of the electrical room. AO.41 Add note to clarify sealant on smoke partitions which are not required to be fire -rated. A2.1 1 Demolition — Remove existing locker room door Adjusted rooms, dimensions, wall and elevation tags for the incorporation of 800 Room (El 345) and relocation of Electrical room (E 1360). Changed rooms numbers to accommodate addition of 800 Room. Room number changes: Refrigerators (El 347), Work (El 346) and 800 room (El 345) A2.12 Add new access ladder and detail for roof access behind screen wall. Add details 4, 5, 6 for roof flashing for HVAC roof equipment. A2.21 Changed and aligned ceilings as required for the adjustment of relocating the Electric room and (El 360) Added new ceiling, lights and diffusers to 800 Room (El 345) Revised ceiling diffusers and lighting to match Mechanical and Electrical design drawings in Clean room (E 1432), Ante Room / Clean storage (E 1343), Clean Room (E 1344) A2.31 Revised flooring to accommodate changes in Electric room El 360 and 800 Room El 345 Revised finishes for selected color palette and materials by Swedish. A2.41 Adjusted furniture and equipment per revised equipment lists and vendor drawings. ment. Added equipment tags to match Swedish equipment lists. Created on 5 10 2017 11:21 AM 2017-05 10 - Memo 800 Room revisions page I ol'2 t 425 778 1530 21911 76th Ave W, Suite 210 Incorporated in the State ofWashington Edmonds WA 98026 wwwtgbarchitectscom ion If 425 77 1 1 tgb tgb.,. A6.01 A7.01 Door Schedule Door 1345 800 room — Added 30" new door with Half glazing, Passage lockset Door 1346 — Change lockset hardware Door 1353 — Deleted door Door 1358 - Swapped with 1359 narrow glazing Door 1359 — Swapped with 1358 full glazing Door 1360 — no changes but door has been relocated in plans Added abbreviations symbol legend and added FG Full Glass type Equipment Schedule — Added new equipment for 800 room. Incorporated equipment per Swedish's equipment Add elevation 33 E 1345 — 800 ROOM -S Add elevation 22 for Door partition dimensions Corrected elevation 42 and 43 Corrected elevation 20 I A8.01 I Add detail 9 soffit detail Attachments: Mechanical and Electrical Memo Created on 5 10 2017 1 1:21 AM 2017-0510 - Memo 800 Room revisionS page I of I t 425 778.1530 21911 76th Ave W, Suite 210 1 Incorperated in the State ofWashii igton f 425 774 7803 1 EdrnondsVVA98026 wwwtgharchitects coin tgb MacDonald -Miller FACILffY SOLLMONS 14 June 2017 Richard Lastimosa TGB Architechs 21911 76t" Ave. W Suite 210 Edmonds, WA 98026 Subject: Mechanical Plan Revisions For 800 Room Dear Richard: Below is a summary of the changes made to the drawings due to the revisions of adding the 800 Room. TMO.01 1. Addition of Filter schedule. TM0.01S 1. No Change TMO.02 I . Update Room Pressurization schedule. 2. Update Exhaust fan Schedule. 3. Update VAV Box schedule including addition of new VAV box (VAVH-E 1346). 4. Update Hydronic Heating Coil Schedule. 5. Update Refrigerator Condensing Unit Schedule. 6. Update Sequence of Operation Schedule. TF2.01 I - Update drawings to reflect changes to location and addition of hydronic heating coils. DF2.01 1. No Change TM2.01 1 . Duct changes to exhaust system for new location of electrical room 2. Duct and Hydronic Heating coil changes for room changes to Conference Room El 358 an d Break Room E 13 5 9. 3. Duct changes and VAV box location changes for Clean Room, Ante Room and Chemo Room. PO Box 47983 7717 Detroit Avenue SW MacDonald -Miller Facility Solutions, Inc. Seattle, WA 98146 Seattle, WA 98106 206.763.9400 4. Exhaust changes to Clean Room, Ante Room and Chemo Room 5. Add VAV box with new HEPA filter diffuser for new 800 Room. 6. Add Exhaust to new 800 Room. TM2.02 1. Add HEPA filter to general chemo room/ 800 room exhaust. 2. Swap location of EF-3 & EF-4. 3. Change location of exhaust duct penetrating roof. 4. Delete I refrigerator condenser. 5. Clarify size of Chilled water lines going to MUA- 1. TM6.01 1. No Change TM6.02 1. No Change TPO.01 1. Update Fixture Connection Schedule. 2. Update Scope of Work. DPLOI 1. No Change TPLOI 1. Add waste for new 800 Room Sink 2. Adjust waste for new location of Break Room DP2.01 1. Change pipe to be demoed to account for new 800 room sink and relocation of Break Room. TP2.01 1. Add new HW, CW and vent lines for new 800 Room Sink. 2. Ad ust HW, CW and vent lines for new Break Room Location. i 3. Delete Coffee water connection. Sincerly, Steve Hargrove Project Engineer (3� Stantec Memorandum To: Richard Lastimosa, TGBArchitects From: Maureen D. Jackson, PE Date: August 4, 2017 Subject: Swedish Edmonds Pharmacy Revisions Richard, Below is a summary of the revisions that have been made to the drawings in the CD set dated 08-03-2017, from the Building Permit set that was issued on 09-15-2017: 1. Sheet E2.01 - Partial Level 1 Lighting Plan a. Revise lighting layout to match updated floor plan. 2. Sheet E3.01 - Partial Level 1 Power Plan a. Revised power device layout to match updated floor plan. b. Added panel and transformer in new electrical room to serve Pharmacy area. 3. Sheet E3.03 - Partial Roof Power Plan a. Revised power to accommodate mechanical equipment revisions. 4. Sheet E4.01 - Partial Level 1 System Plan a. Revised communication devices to match updated floor plan. 5. Sheets E8.00 and E8.01 - Partial Power Riser Diagram a. Revised load calculations to accommodate power revisions. 6. Sheets E9.00, E9.01, E9.02 and E9.03 a. Added panel schedules to reflect final circuiting. Let me know if there are any questions. cc: Jenny Tang - Stantec jt:V:\2048\.�Li,-e\204819527\De.ig.\C.,�p\2017-08-04 Drawing Revisiom - LI Comtruction Set. d� 4100 194th St SW - Suite 400, Lynnwood, Washington 98036-4613 206-667-0555 800-667-0610 Fax: 20(Y-667-0554 Yowit). Stan tec. coin