Loading...
20170823110820.pdfRAM Engineering August 11, 2017 City of Edmonds Development Services Department c/o Mitch Boyd 1215 th Avenue North Edmonds, WA 98020 RE: Select 22208 92 "d Ave W SFR Plan Check BLD20170855 Vt Plan Review Comment Response RAM Job No. 17-015 Mr. Boyd: This letter outlines the revisions and corrections made per your review comments dated July 10, 2017. Below is a list of the comment response documents addressing the comments and requests: GENERAL 1) Submit ROW Permit Application form Response: ROW Permit Application included in resubmittal materials. 2) Submit Side $ewer Permit Application form Response: Side Sewer Permit Application included in resubmittal materials. 3) A Stormwater Covenant is required to be recorded against the property based on the proposed stormwater facilities for the project. Please complete the covenant, including notarization and any required exhibits and submit to the city. The document must be complete, but will not be recorded prior to permit issuance. Prior to construction final location of facilities are to be verified (by field inspection and asbuilt) and then the covenant will be recorded, Response: See attached Stormwater Covenant included in resubmittol materials. CLEARING, GRADING, & TESC PLAN 1) Show filter fence on the east property line. Response: Filterfence added to east property line. 2) Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site. Response: Filter sock locations and note added to plan. RESUB 3) Add a note that the stockpile is to be covered within 24 hours AUG 1 4 � - Response: Note added to plan. BUILDING DEPARTMENT CITY OF EDMONDS 4) Please add a note to the plans that all disturbed soils Avill be cornpost amended per BMP T5.13, Response: Note added to plan. RECEIVED 5) The future driveway note on the plans misspelled "area". Response: Note corrected. AUG 14 2017 6) Outside of the proposed block wall. will there be any proposed onsite grading? DEVELOPMEN] 6b, —aS CTR. Response: Yes, grading for pod, utilities and driveway will be necessary. C11Y OF EDMONDS RAM Engineering 16531 131h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com Select 22208 92od Ave W SFR Plan Check BLD20170885 111 Plan Review Comment Response RAM Job No. 17-015 7) Update building permit number to BLD20170855 Response: Building permit number added to a// sheets. DEMOLITION PLAN 1) If the existing side sewer is to be re -used, the line must be cut and capped a minimum of 20' from existing and/or proposed foundation. whichever is closest to the propem, line. Response: Note added to plan. 2) If the existing water service line Is to be re -used. the line must be disconnected at the meter durina construction. Please install a hose bib with an AVB at the meter during construction. Please show the existing water service, meter, and water main on the plan. Response: Existing water meter to be removed and replace with 1" meter. See plan. 3) Show existing dry utilities on the plan. Response: Existing dry utilities added to plan. 4) Show filter fence on the plan. Reference City of Edmonds standard detail El.1 Response: Filterfence and detail reference added to plan. 5) Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site - Response: Filter sock locations and note added to plan. 6) Add a note that the stockpile is to be covered within 24 hours. Response: Note added to plan. 7) Please add a note to the plans that all disturbed soils will be compost amended per BMP T5.13. Response: Note added to plan. SITE DEVELOPMENT PLAN 1) Show all dry utilities and required utility separation. Please add a note that a minimum of 3' separation is required between the dry utilities (power, gas, phone, cable, etc.) and wet utilities (sewer, water. and storm). Response: Dry utilities and separation note added to plan. 2) Show the existing water main. Response: Existing water main added to plan. 3) A minimum of 10' of horizontal separation is required between water and sewer lines. Response: Note added to plan. 4) A minimum of 5' of horizontal separation is required between water and storm lines. Response: Note added to plan. 5) Label pipe material Response: Pipe material labels added to plan. Page 2 of 4 6) Show a 6" cleanout at the property line. Please add a note that the 6" cleanout at the property I "' hexbolts. line shall have a 12" cast iron lamphole cover w th V2 Response: 6" cleanout added at property line and note added to plan. RAM Engineering 1653113" Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.com Select 22208 92nd Ave W SFR Plan Check BLD20170885 111 Plan Review Comment Response RAM Job No. 17-015 7) Provide the invert elevation at the main so that a minimum 2% slope and minimum 2' pipe coverage can be verified. If the slope of the pipe exceeds 20% the pipe will need to be anchored. Response: Sewer elevations and slopes added to plan. 8) If the existing side sewer is to be re -used. the line must be cut and capped a minimum of 20' from existing and/or proposed foinidation. whichever is closest to the property line. Add to the existing note that the sewer line needs to be capped a minimum of 20' from the proposed foundation as well. Response: Note added to plan. 9) Show where the retaining wall drainage will discharge to. Response: Retaining wall dry well added to plan. 10) SDCO I rim elevation appears to be incorrect. Update. Response: SDC01 rim elevation corrected. 11) Verify driveway slopes as they do not match spot elevation callouts. Response: Driveway slopes and spot elevations corrected. 12) Driveway/Utility Pole clearance callout unclear. The utility pole is on the east side of 92"' Ave W. Please clarify. Response: Note removedfrom plan. 13) The proposed house is labeled as "propose house". Response: Label corrected to "proposed house". 14) Building Permit number is BLD20170855, Response: Building permit number added to a// sheets. 15) Impervious areas provided on the plans do not match the impervious areas provided in the drainage report. Response: Impervious areas on plans revised to match drainage report. 16) Please add a note to the plans that all final restoration shall be completed by the contractor not the City of Edmonds. Response: Note added to plan. Page 3 of 4 RAM Engineering 16531 13'h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAMengineeringinc.corn Select 22208 92nd Ave WSFR Plan Check BLD20170885 1" Plan Review Comment Response RAMJob No. 17-015 STORNINVATER R11"PORT The following comments are provided from Robert C. Edwards, PE, Stormwater Engineer. Please contact Robert directly at 425-771-0220 or by email at robert.edwards(e—i,,edmoiidswa.go%,* with any specific questions you may have regarding these comments. Background This is classified as a Category I Small Site Project because it creates/adds impervious area more than 2,000 SF and less than 5,000 SF. Category I Small Site Projects are subject to Small Site Minimum Requirements 1, 2, 31 4, and 5. Minimum Requirement #1 — Preparation of Stormwater Site Plan Comments: None Minimum Requirement #2 — Construction Stormwater Pollution Plan Comments: 1. Orange fence conflicts with construction entrance. Discussed with Mike Morris of RAM Engineering on June 30, 2017. a. Orange fence to protect future infiltration trench from over compaction not necessary as invert of trench is at least 6-feet below the existing grade. Response: Orange protection fence removed per discussion with staff. b. Should existing driveway be excavated first, place geotechnicil filter fabric under C, the rock construction entrance to minimize fine soil deposits. Response: Note added to plan. Minimum Requirement 93 — Source Control of Pollution Comments: N/A per SFR Minimum Requirement #4 — Preservation of Natural Drainage Systems Comments: N/A per LID N-11inimum Requirement #5 — Onsite Stormwater Management Comments: See MR42 Minimum Requirement #7 — Flow Control Comments: Flow control bv LID Minimum Requirement W8 — Wetland Protection Comments: N/A Minimum Requirement #9 — Operation and Maintenance Comments: None Minimum Requirement #11 — Financial Liability Comments: N/A for SFR Page 4 of4 If there are any questions regarding the items above, please contact me at your earliest convenience; I can be reached at (425)678-6960 or RobL@RAMengineeringinc.com. Thank you, Rob Long, PE Principal RAM Engineering 1653113 1h Ave W, Suite A108 Lynnwood WA 98037 (425) 678-6960 RAM engi neeri ngi nc, corn