Loading...
20170908092338.pdf..dKXaZ;an & A S S 0 C I AT E S, I N C. SEP 0 6 2017 GEOTECHNICAL ENGINEERING a ENVIRONMENTAL ENGINEERING E)EVELOPMENT SERVICES CONSTRUCTION TESTING & INSPECTION August 25, 2017 Mr. Douglas Spee (E-Mail) EDMONDS 2020, LLC 307 Bell Street Edmonds, WA 98020 RE: CONSTRUCTION TESTING AND INSPECTION Post Office Phase 2 201 Main Street Edmonds, Washington Dear Mr. Spee, KA No. 096-17054 Permit No. BLD20160506 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Jeffrey S. M cer Operations Manager Pacific Northwest Division JSWlkj CC: CITY OF EDMONDS 4303 198" Street SW, Lynnwood, Washington 98036 * (425) 485-5519 - FAX (425) 485-6837 With Offices Serving th e Western United States 09617054 DFR doe &ASSOCIATES GEOTECHNICAL ENGINEERING * ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION Date: Project No.: Project: Project Location: Krazan PM: August 24, 2017 096-17054 Edmonds Post Office Phase 2 201 Main St. im FIELD REPORT Report No.: 09617054DFRO82417-NG Contractor: Pile Contractors Permit No.: BLDG-2016-0506 Inspector: Niccolo Guiao Jurisdiction: City of Edmonds Weather: Mostly Cloudy Temp: 50-60's F A Krazan geotechnical representative visited the project site today to monitor shoring wall construction. TemporarN, Shorin2 Wall — Soldier Piles Installation We observed the shoring wall contractor, Pile Contractors installed soldier piles E2 and E 10 along the eastern alleyway. The soldier pile borings were made with a 30-in diameter auger. The soils encountered generally consisted of brownish gray silty sand with gravel and trace clay and, gray sand with silt and gravel. We also observed groundwater seepage at depth of 27-ft. After the contractor completed drilling the soldier piles to the planned depths and cleaned the bottom for loose soils using a clean up bucket, designated steel shafts (1-beams) were then placed to its planned elevation. Due to the presence of groundwater, line pump and tremie pipe were used in discharging the controlled density fill (CDF) in the lower half portion of the soldier piles. Also, a sump pump was used to reduce the accumulated groundwater before filling the upper half portion of the soldier piles with CDF. The upper half portion of the soldier pile was then filled to about 2-ft below surrounding grade using the concrete truck's chute. The approximate depths of the soldier pile borings and groundwater arc as follows: Soldier Pile No. Dqpth Groundwater Depth Steel Section Pile Lendi E2 31-ft 27-ft Wl8x55 33.5-ft E10 31-ft 27-ft W18x55 32-ft The contractor ordered about 18 cubic yards of CDF from Miles — Everett Plant. Listed below are the following mix nos. used. 1. 11 CDOLP: 9 cubic yards — lower half portion. 2. 1 lCDA10: 9 cubic yards —upper half portion. In our opinion, the soldier piles that we observed today have been installed in general accordance with the approved shoring plans. To the best of my knowledge, the above WAS perfortned to approved plans and specifications. Superiiiteiideiit/Representative: Technician: Niccolo Guiao 4303 — 198th Street SW - Lynnwood, Washington 98036 - (425) 485-5519 - FAX (425) 485-6837 With Offices Serving the Western United States & ASSOCIATES, INC GEOTECHNICAL ENGINEERING e ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION August 29, 2017 Mr. Douglas Spee (E-Mail) EDMONDS 2020, LLC 307 Bell Street Edmonds, WA 98020 RE: CONSTRUCTION TESTING AND INSPECTION Post Office Phase 2 201 Main Street Edmonds, Washington Dear Mr. Spee, REECUVED SEP 0 6 2017 DEVELOPMENT SERVICES KA No. 096-17054 Permit No. BLD20160506 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. Jeffrey S. Mercer Operations Manager Pacific Northwest Division JSMllkj cc: CITY OF EDMONDS - 4303 19811 Street SW, Lynnwood, Washington 98036 e (425) 485-5519 o FAX (425) 485-6837 Willi Offices Serving the Western United States 09617054 DFR doc KraZan & A S S 0 C I A T E S GEOTECHNICAL ENGINEERING 9 ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION Date: Project No.: Project: Project Location: Krazan PM: Report No.: August 28, 2017 Contractor: 096-17054 Permit No.: Edmonds Post Office Phase 2 hispector(s): 201 Main St, Edmonds, WA Jurisdiction: Weather: FIELD REPORT 09617054DFRO82817JGL JeffLeague City of Edmonds Sunny Temp: 65-700 F (AM) Krazan geotechnical representatives visited the site today for shoring wall installation monitoring. The contractor was installing soldier piles along the east -central and southeastern portions of the site. Krazan co-worker Niccolo Guiao visited the site this afternoon to monitor shoring wall construction. Please refer to the field report dated 8-28-17 by Krazan co-worker for detailed information on soldier pile installation. This field report is for infon-national purposes only. Superintendent/Representative: Technician: Jeff League 4303 — 198' Street SW * Lynnwood, Washington 98036 - (425) 485-5519 0 FAX (425) 485-6837 With Offices Serving the Western United States 09617054DFRO82817JGL doc 4UKraZan &ASSOCIATES GEOTECHNICAL ENGINEERING a ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION FORENSIC INVESTIGATION Date: Project No.: Project: Project Location: Krazan PM: August 28, 2017 096-17054 Edmonds Post Office Phase 2 201 Main St. im FIELD REPORT Report No.: 09617054DFRO82817-NG Contractor: Pile Contractors Permit No.: BLDG-2016-0506 Inspector: Niccolo Guiao Jurisdiction: City of Edmonds Weather: Sunny Temp: 70-80's F A Krazan geotechnical representative visited the project site today to monitor shoring wall construction. Temporary Shorine Wall — Soldier Piles Installation In the morning, our project geologist, Mr. Jeffrey League monitored the drilling of soldier piles El 3, El 5 and E17. At the time of our arrival, we observed the shoring wall contractor, Pile Contractors, drilled soldier pile E 19 and installed soldier piles E13, E15, E17 and E19 along the eastern alleyway. The soldier pile borings were made with a 30-in diameter auger. The soils encountered generally consisted of brownish gray silty sand with gravel and trace clay and, gray sand with silt and gravel. We also observed groundwater seepage at depths of 22-ft and 24-ft. After the contractor completed drilling the soldier piles to the planned depths and cleaned the bottom for loose soils using a clean up bucket, designated steel shafts (1-beams) were then placed to its planned elevation. Due to the presence of groundwater, line pump and tremie pipe were used in discharging the controlled density fill (CDF) in the lower half portion of the soldier piles. Also, a sump pump was used to reduce the accumulated groundwater before filling the upper half portion of the soldier piles with CDF. The upper half portion of the soldier pile was then filled to about 2-ft below surrounding grade using the concrete track's chute. The approximate depths of the soldier pile borings and groundwater are as follows: Soldier Pile No. D "th Groundwater Depth Steel Section Pile Lenp-t E13 29-ft 24-ft W1 8x55 31.5-ft E15 28-ft 24-ft W1 8x50 31-ft E17 27-ft 22-ft Wl8x50 29.5-ft E19 27-ft 22-ft Wl8x50 29.5-ft To the best of my knowledge, the above WAS performed to approved plans and specifications. Superintendent/Representative: Technician: Niccolo Guiao P, 4303 — 1981 Street SW - Lynnwood, Washington 98036 * (425) 485-5519 0 FAX (425) 485-6837 With Offices Serving the Western United States KRAZAN & ASSOCIATES, INC. Page No. 2 The contractor ordered about 24 cubic yards of CDF from Miles — Everett Plant. Listed below are the following mix nos. used. 1. 11 CDOLP: 12 cubic yards — lower half portion. 2. 11 CDA1 0: 12 cubic yards — upper half portion. In our opinion, the soldier piles that we observed today have been installed in general accordance with the approved shoring plans. To the best of my knowledge, the above WAS performed to approved plans and specifications. Superintendent/Representative: Technician: Niccolo Guiao Krazan & Associates, Inc. Offices Serving The Western United States KraZan & A S S 0 C I AT E S, I N C. =EL. llhh� AM AmEry --R_ GEOTECHNICAL ENGINEERING e ENVIRONMENTAL ENGINEERING CONSTRUCTION TESTING & INSPECTION August 31, 2017 Mr. Douglas Spee (E-Mail) EDMONDS 2020, LLC 307 Bell Street Edmonds, WA 98020 RE: CONSTRUCTION TESTING AND INSPECTION Post Office Phase 2 201 Main Street Edmonds, Washington Dear Mr. Spee, KA No. 096-17054 Permit No. BLD20160506 In accordance with your request and authorization, our firm performed construction testing and inspection for the above -referenced project. The sampling and testing was performed by our inspectors and reports are included. If you have any questions, or if we can be of further assistance, please do not hesitate to contact our office. Respectfully submitted, KRAZAN & ASSOCIATES, INC. CA Jeffreyy S. M rcer Operations Manager Pacific Northwest Division JSNVlkj CC: CITY OF EDMONDS 4303 1981h Street SW, Lynnwood, Washington 98036 e (425) 485-5519 e FAX (425) 485-6837 With Offices Serving the Western United States 09617054 DFR doc Page I of I -;, 3-0- — 00 14�14.11azan &Associates, Inc. Geotechnical Engineering 9 Environmental Engineering Construction Testing and Inspection Field Report NO.: 09617054DFR8292017EH DATE: 8/29/2017 Set Count: CONTRACTOR: Pile Contractors PROJECT #: 09617054 PERMIT #: BLDG-2016-0506 PROJECT: Edmonds Post Office Phase 2 INSPECTOR: Eric Haines LOCATION: 201 Main St JURISDICTION: Citv of Edmond KA P.M.: WEATHER: TEMP: A Krazan geotechnical representative visited the project site today to monitor shoring wall construction. Temporary Sliorin2 Wall - Soldier Pile Installation We observed the shoring wall contractor, Pile Contractors installed soldier piles E12, E14, E16, E18. E20 along 3rd Ave N. The soldier pile borings were made with a 30-in diameter auger. The soils encountered generally consisted of brownish gray silty sand with gravel. We also observed groundwater seepage at depths of about 24-ft and 25-ft After the contractor completed drilling the soldier piles to the planned depths, designated steel shafts (1-beams) were then placed to its planned elevation. Due to the presence of groundwater, line pump and tremie pipe were used in discharging the controlled density fill (CDF) in the lower half portion of the soldier piles. Also, a sump pump was used to reduce the accumulated groundwater before filling the upper half portion of the soldier piles with CDF. The upper half portion of the soldier pile was then filled to about 4-ft below from the top of the steel shafts using the concrete truck's chute. The approximate depths of the soldier pile borings and groundwater are as follows: Soldier Pile No. Depth Groundwater Deptli Steel Section Pile Length E12 27.5-ft 24-ft W18x5532-ft E14 27.5-ft 24-ft W18x5531-ft E16 27.5-ft 24-ft Wl8x5030-ft E18 27.5-ft 24-ft Wl8x50 29.5-ft E20 27.5-ft 24-ft Wl8x50 29.5-ft The contractor poured about 31 cubic yards of CDF (mix nos. I ICDOLP: 20 cubic yards - tremie pipe method and I I CDA1 0: 11 cubic yards - chute method) from Miles - Everett Plant. in our opinion, the soldier piles that we observed today have been installed in general accordance with the approved shoring plans. W Reviewed By: 2� ASTMT-st#: J Asset Number(s): To the best of my knowledge, the above WAS performed in accordance with the approved plans, specifications and regulatory requirements. Superintendent/Representative: Technician: Offices Serving the Western United States Lynnwood (425) 485-5519 - Poulsbo (360) 598-2126 - Puyallup (253) 939-2500 The information provided on this report is prepared for the exclusive me of the clienl. This report my not be reproduced in my 15,xmat without the written permission of the client and Knman & Associates. This report indicates our inspectors observation and lwting results based on site conditions and contractor activities. This information is subject to review prior to final submiftal By signing this repon, our inspeclor does not accept responsibility for validity ofmults The same informstion hasb= provided by others on sit�