20170919142027.pdfDonna Breske
,-,\& Associates
___4t�z I I
rcivil Engineering & Land Use Planning
City of Edmonds
RESUB
SEP 18 20V
BUILDING DEPARTMENT
CITY OF EDMONDS
Attn: Mitch Boyd, Santec Consulting Services, Engineering Division
City Hall - Second Floor
121 5th Ave N
Edmonds, WA 98020
21 Ave A, Suite 4
Snohomish, WA 98290
Telephone (360) 294-8941
www.donnabreske.com
September 14, 2017
Subject: Response to Review Comments for Bob Cook Project, 10519 Alan A. Dale Pl.
Reference: Application #: BLD20170252
Donna Breske & Associates, LLC is in receipt of the City of Edmonds review comments from
Mitch Boyd dated 5 -4-17. A 3 -sheet drawing set dated 9-13 -17 and a Drainage Report dated 9-13 -17
are included with this resubmittal. Responses to City review comments are as follows:
GENERAL
1) Include Construction Sequence per sample on City Website.
Response: Said Construction Sequence is shown on Sheet I of the drawing set.
2) Include General Construction Notes per sample on City Website.
Response: Said Construction Sequence is shown on Sheet 3 of the drawing set
3) Ensure scale callout and north arrow with scale legend are consistent.
Response: All references to drawing scales are I" = 10'
TESC PLAN
1) Showfilterfence on the plans and incorporate and reference City standard detail El. 1.
Response: Filter fence location is shown on Sheet 2, and City Standard Detail on Sheet 3.
2) Please remove the limits of disturbance fencing blocking the construction entrance.
Construction entrance is to be installedper standard detail El. 2, please add the standard detail
to the plans.
Response: The "zig-zag" line shown on the TESC plan depicts the limits of disturbance on the
site, and is a pictorial representation on paper, not an actual fence to be installed. Hence, the
46zig-zag" line remains the same. Standard detail E1.2 has been added as well as a note to use the
existing gravel as a staging area for construction or the quarry spall entry per detail E1.2.
3) Please show and add a note to the plans thatfilter socks will be added to any catch basins
downstreamftom the construction site. Pleaseprovide a catch basin insert in the catch basin to
the south of the property within Alan A. Dale Pl. Incorporate and reference City standard detail
El. 3.
Response: Filter sock detail is shown and applicable note are shown on Sheet 2
Donna Breske
& Associates
-rcivil Engineering & Land Use Planning
21 Ave A, Suite 4
Snohomish, WA 98290
Telephone (360) 294-8941
www.donnabreske.com
DRAINAGE PLAN
1) Please providefooting drain design and discharge location
Response: On Sheet 1, bldg. footing drains are shown and discharge to drywells.
2) Show where the proposed rockeryfooting drainage will discharge to.
Response: On Sheet 1, rockery footing drains are shown and discharge to a drywell.
3) Please provide the top and toe elevations and total heightfor the proposed rockery. Include
Standard details for rockeries E8.9 and E8. 10
Response: Top and toe elevations and total height are shown on Sheet 2. Rockery details are
shown on Sheet 3.
4) Please provide location of splash blocks is applicable
Response: One splash block is shown on the west side of the house and on Sheet 1.
5) Please provide proposed contours
Response: Proposed contours are shown on both Sheets I & 2.
6) Please provide additional driveway grading information.
Response: On Sheet 1, the driveway is now shown as a circular type driveway. The driveway
slopes away from the house downward to the street.
7) The west driveway will have to be brought up to compliance with City ofEdmonds 2017 code.
The driveway access is to be 24-feet in width. Gravel may be added on the side of the driveway
up to the property line. Existing gravel in the City right-of-way to the west of the proposed
driveway will need to he replaced with landscaping.
Response: Mr. Cook desires to have a circular type driveway and removing the gravel from
apron area to the west of the existing driveway would limit vehicular ingress and egress into the
west driveway. In lieu of removing gravel to the west, the plans instead depict removing gravel
in the ROW between the two driveway gravel aprons and replacing with landscaping.
8) Add a note to the plans that allfinal restoration shall be complete by the contractor not the City
of Edmonds.
Response: Applicable note has been added to the area to be converted from gravel to
landscaping in the right-of-way shoulder area.
DRAINAGE REPORT.
Response: The Drainage Report has been revised in it's entirety to address MR's # 145 for the
project. Previously only MR#2 was addressed. However, with the addition of the circular
driveway the project proposes more than 2,000 sf and less than 5,000 square feet of impervious.
Sincerely,
Donna L. Breske, P.E.
Office: 360294-8941
Mobile: 206-715-9582