20170928161917.pdf�(D re I a4e Construction Co. GENERAL CONTRACTORS Sept. 21. 2017 City of Ednionds 121 5111 Avenue N. Edmonds, WA 99020 Re: Night Work Dear Mr. Rivera, 00 Shoreline requests a noise vnriance for 2 consecutive days to conduct construction activities for an Olympic View Water and Sewer District (OVWSD) project called Sanitary Sewer Upgrades — Phase 2. The basic scope of this project is to rehabilitate sewer pipe at various locations. Several of the locations are within the jurisdiction of City of Edmonds and a Right of Way permit has been issued by City of Edmonds (permit #ENG201 70240). The work for this project can be completed within the conditions of the permit excluding, the site at Edmolids Way & 100" Ave W. The work at Edmonds Way & 100'h Ave W is rehabilitating the existing 12" diameter sewer line utilizing Cured -In -Place Pipe (CIPP). the sewer pipe is within the ROW of Edmonds Way. The pipe VA 11 be accessed utilizing 2 manholes, one is located in the intersection of 100111 Ave W and the other is approximately 400 feet %vest of 100"' Ave W. The process of CIPP requires that the liner be installed, cured and side sewers reinstatement to be performed in a continuous manner (day 2). The two day plan (bypassing is required) is as follows: Day I — Prep existing sewer pipe o Clean pipe o CCTV pipe o Prepare CIPP Day 2 — CIPP pipe o Invert liner (install liner) o Inflate and cure liner o Reinstate laterals o Post TV The activities and equipment required to complete this work are: Tratije Control • Arrow Board/Portable Message Sign • Light duty trucks Sewer bypassing o 60 KW generator CCTV of pipe to be CIPP o TV van Cleaning of pipe to be CIPP o Vacuuni/Combination truck Installation of CIPP • Steam generator - box van • Air Compressor 375 cfin • Support trucks — light duty truck P.O. Box 358 * Woodinville, WA 98072 __ E Noise Level (db) Arrow board/PMS (electric) Below 50 db Light duty truck 50-60 db 60 KW Generator 60 db TV Van 60 db Vacuum/Combination 85 db Steam Generator —Box Van 50-60 db Air Compressor 375 85 db 66P Edmonds Way is a high volume road surrounded by business. Allowing the work to be performed between the hours of 8:00 pin to 7:00 am on 2 consecutive nights will: Decreased vehicular and pedestrian traffic disruption or delays Less disruption to nearby business Increased public safety Enable work to be completed This work is planned to take place either the first or second week iii October. OLYMPIC VIEW WATER & SEWER DISTRICT SEWER SYSTEM UPGRADES PHASE 2 SHORELINE CONSTRUCTION CO SHEET 8 TRAFFIC CONTROL PLAN TRAFFIC CONTROL PLAN SHEET 2 OF 3 0 T POLICE OFFICER POLICE CRUISER 100TH AVE W 4 1 6t? 2,8 2W ,,,EtAl SE"r-'-S �FMR DATA LOWGMID�L BUFFER ILPACC Q V4 TRAN-RTABLE A�ENUATOR ROLL A-D DISTA�E R IEEE-' CTM VKWLK CVJWW WwLc) - R CHANNEL12AIM DEMCE SPAC—NG -j fKET) -0 u� AW41 j Ao DRIVEABLE SHEE;7�� 4- k��z Aw 41*4� T i I 'i t EDMONDS WAY t t