Citv of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
August 11, 2017
Tom Leren
tom@lerendesign.com
Eric Carter, Plans Examiner
Plan Check: BLD2017-0944
Project Address: 1140 Sea Vista Place
Scope: Alteration / Single Family Dwelling, — R-3/U occupancy group — V-B
construction— mechanical and plumbing included
Please be advised that the building plans for the above referenced project have been disapproved
for the purposes of obtaining a building permit. During a review of the plans by the Building
Division for compliance with the applicable building codes, it was found that the following
information, clarifications, or changes are needed. Reviews by other divisions, such as Planning,
Engineering, or Fire, may result in additional comments that require attention beyond the scope of
this letter. Items that recur on this list appear in italics.
A complete review cannot be performed until the revised plans/documents, including a
written response in itemized letter format indicatin2 where the 'clouded' or otherwise
hi2hli2hted chan2es can be found on the revised plans, have been submitted to a Permit
Coordinator.
Resubmittals must be made at the Development Services Department on the 2 nd Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
This building plan review cannot be completed until we receive the following items:
General:
The construction project involves demolition of a significant portion of the existing structure. Please
be aware that structures that are demolished to the level that meets or exceeds 75% of the
replacement cost of the structure will not be allowed by city code to be rebuilt except to full -on
standards for new construction. Reference Edmonds Community Development Code section
17.40.020(F). In order to verify that your project does not meet this threshold, the following must be
provided to the city:
a. A cost breakdown showing the demolition is less than 75% of the replacement cost of the building.
b. Distinguish clearly on the plans which portions of the building are to be retained as existing and
which are new, in order to establish a design that clearly demonstrates the level of demolition as laid
out in the cost breakdown. Please contact me if you need further clarification on this issue.
c. Please see the attached worksheet, if this is the method you choose, please complete, and return
with your resubmittal.
S4:
2. Stamped calculations were provided with the plans, these calculations are not easily
discernable. Please provide calculations that correspond with the beam, header, and joist
specifications shown on the plans. For example, the main floor gravity summary references
# 1, B 1, 5.125x I 8FS. This calculation does not appear to coincide with beam BM-0 1, 4x8
DF #2. Please provide calculations that correspond with the beam schedule.
3. The provided reference detail refers you to page S I for the shearwall schedule. Although the
corresponding hold down schedule was provided in detail 3/S 1, the shear panel nailing
schedule was not included on page S 1. Please add the plans. Please be aware that a lateral
review has not been performed, additional comments may generated during the review.
Please let me know if I can be of any additional assistance.
Eric Carter