20171012090542.pdf0 Af 0
DEVELOPMENT SERVICES
WORK HOURS VARIANCE REQUEST FORM
1215 1h Avenue N, Edmonds, WA 98020
Phone 425.771.0220 q Fax 425.771.0221
PROJECT NAME:
PERMIT(S) #:
DEPRECIATED POLE REPLACEMENT I
PROJECT ADDRESS: 9804 EDMONDS WAY, EDMONDS
APPLICANT: YASAMIN ZADEHGOL
Phone: 425-783-5592 OR 425-231-0475
Address (Street, City, State, Zip):1 802 75TH ST SW, EVERETT
E-mail:
YXZADEHGOL@SNOPUD.COM
WA 98203
PROPERTY OWNER:MULTIPLE BUSINESSES ON THIS PROPERTY.
Phone: 425-586-4663
CONTACT LEIBSOHN MANAGEMENT FOR MORE INFORMATIO1
J.
Address (Street, City, State, Zip): 9804 EDMONDS WAY,
E-Mail N/A
EDMONDS WA 98020
CONTACT PERSON: (This person must be available at all times that
Phone:
'Al THE CONTACT INFORMATION WILL
extended work is being performed)
SEE CONTACT PERSON
BE AVAILABLE 72 HOURS PRIOR TO
T"F Wn
Address (Street, City, State, Zi P): 1802 75TH ST SW, EVERETT
E-mail: SEE CONTACT PERSON
WA 98203
CONTRACTOR: SNOHOMISH COUNTY PUD
Phone: SEE APPLICANT INFORMATION
Address (Street, City, State, Zip): 1802 75TH ST SW, EVERE I I
E-Mail:
WA 98203
SEE APPLICANT INFORMATION
DATES AND TIME OF EXTENDED WORKTIME REQUESTED:
WA State Contractor License #/Exp. Date:
ANY SUNDAY, MONDAY, TUESDAY, WEDNESDAY,
OR THURSDAY OF THE WEEK. HOURS OF WORK
City of Edmonds Business License #/Exp. Date:
WILL BE BETWEEN 9 PM TO 6 AM, FOR A 6-9 HOUR
ni IPATinN
DETAIL THE SCOPE OF WORK TO BE PERFORMED DURING THE REQUESTED TIMES:
THE DEPRECIATED PUD POWER POLE LOCATED AT THE ADDRESS SPECIFIED NEEDS TO BE REPLACED.
T'HE-NEW POLE HA"LREADY BEEN INSTALLED, Af4D-THE REMAiNDER OF fl IE WORK WILL REQUIRE
PUD FACILITIES AND EQUIPMENT TO BE TRANSFERRED FROM THE OLD POLE TO THE NEW POLE.
THIS WILL RESULT IN A TEMPORARY POWER OUTAGE TO THE 10-12 BUSINESSES ON THE PROPERTY.
THE WORK W11 I- RF CONDUCTED IN A SAFE MANNER WHILE LIMITING THE NECESSARY NOISE TO THE
MINIMUM LEVEL POSSIBLE.
El A RATIONALE FOR THE PROPOSAL SHALL BE SUBMITTED IN ADDITION TO THIS FORM. PLEASE REFER TO THE WORK
HOURS VARIANCE REQUEST HANDOUT WHICH ASKS FOR AN EXPLANATION OF HOW THE ACTIVITIES WILL COMPLY WITH
THE REQUIREMENTS OF THE VARIANCE ORDINANCE.
YASAMIN ZADEHGOL
Print Name:
10/11/17
Signature: Date:
6/
FORM B V:\DESKTOP\Work Hours Variance Form B 2017.docx Updated: 09/25/2017
01 It
PERMITTING & DEVELOPMENT
B U I L D I N G D I V I S 1 0 N
121 5th Avenue N
P: 425.771.0220
www.edmoridswa.gov
The Code:
REQUIREMENTS FOR
WORK HOURS VARIANCE
Based on ECC 5.30.110 Sounds exempt during daytime hours:
Section B. Sounds originating from temporary construction sites as a result of construction activity are exempt from the provisions of
this chapter, but only during the hours of 7:00 a.m. to 6:00 p.m. on weekdays and 10:00 a.m. to 6:00 p.m. on Saturdays, excluding
Sundays and federal holidays.
5.30.120 Variances.
A. Variances maybe granted to any person from any requirement of ECC 5.30.040 (maximum permissible sound levels) or5.30.110
if findings are made that immediate compliance with such requirement cannot be achieved because of special circunistal ices
rendering immediate compliance unreasonable in light of economic or physical factors, encroachment upon an existing noise
source or because of non -availability of feasible technology or control methods.
B. Any such variance or renewal thereof shall be granted only for the minimum time period found to be necessary under the facts and
circumstances.
C. Variances shall be processed as a Type 1 permit procedure under ECDC 20.01.003.B, while using the criteria found in subsection
A of this section. Factors to be balanced in the process include those identified as follows:
1 . Public convenience — Will the work result in significant delays for transportation, services, or other customer needs if done only
during the day and within the hour restrictions set out in other parts of this chapter?
2. Public Safety — Does working outside of normally allowed significantly improve safety conditions for the traveling public and/or
construction workers?
3. Public exposure - — What will be the setting for any proposed work outside of regular hours? Is it located on an arterial street or in
a mostly residential area?
4. Public cost — Does a limited amount of authorized outside of regular hours established by this chapter save the public
significant cost compared to daytime work?
5. Noise reduction measures -- Have all reasonable steps been taken to reduce the impact of any necessary noise outside the
standard hours? Answering this question needs to include evaluation of (1) limiting the night time or early morning work to only
that necessary to reasonably mitigate the issues identified above, (2) use of quiet generators and quiet pumps (as available),
(3) drilling and placing of piles instead of driving them, as well as use of other techniques, design choices, and acoustic control
equipment and strategies necessary to minimize the night-time or early morning impacts from construction noise.
D. The grant of a variance shall not relieve any person from the requirements of ECC 5.30 130 relating to public disturbance noises.
A Temporary Construction Site is defined as the location of a development -related construction project being performed under a
City -issued permit, where required.
Procedures:
For Private Development -related Projects, applications for a noise variance shall be submitted to the Development Services
Department no later than 2 weeks prior to the requested activity, or as otherwise deemed appropriate by the director. An earlier date is
strongly recommended because approval could take longer if necessary if information is unclear or missing or the department needs
additional time to consider relevant factors. Applications must be accompanied by documentation and rationale sufficient to identify the
clate(s) and time for which the variance is being requested and to demonstrate compliance with the criteria set forth in the ordinance.
The director or designee shall render a determination based on the authority under ECC 5.30.120. Approval or denial shall be in writing.
Fees:
The fee amount shall be that as established in the current department fee schedule for a Type 1 Staff Decision (currently $285 which
includes a technology fee) and is payable upon application. Refunds will not be available once a determination has been made,
whether approval or denial.
FORM B V:\DESKTOP\Work Hours Variance Form B 2017.docx Updated: 09/25/2017