Loading...
20171023104049.pdf7 ATTENTION IT IS UNLAWFUL TO USE OR OCCUPY A BUILDING OR STRUCTURE UNTIL AFINAL' INSPECTION HAS BEEN MADE AND APPROVAL OR A CERTIFICATE OF OCCUPANCY HAS BEEN GRANTED. UBC109/ TBC110/ IRC1 10, FIRE APPLICANT' ASSESSOR' CITY �„ .« �L T ATITC• TCCTTTi 1' R11 D7.(1171 Pursuatwttt UP 005�2 a eater service, shutoffl shll the installed on the waterline as :it enters t.he,buildin . • City approved plastic piping may be used in water service piping provided that where metal water service piping is used for electrical grounding purposes, replacement piping shall be of like materials (UPC 604.8). A state electrical permit and inspection is required if electrical grounding is altered, removed, improved, or added. Contact State Dept. of Labor & Industries'' Electrical Division at 425-290-1309, • Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy, inspections. • Any request for alternate design, modification, variance or other administrative deviation (hereinafter "variance") from adopted codes, ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such request shall be established by Council and shall be paid upon submittal and are non-refundable. • Approval of any plat or plan containing provisions which do not comply with city code and for which a variance has not been specifically identified, requested and considered by, the appropriate city official in accordance with the appropriate provision of city code or state law does not approve any items not to code specification. +� Sound/Noise originatingfrom temporary construction sites as a result of construction activity are exempt from the noise limits ofECC Chapter 5.30 only during the hours of 7:00am to,6:00pm on weekdays and 10:00am and 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating fi•om construction sites/activities must comply with the noise limitsof Chapter 5.30,'unless a variance has been granted pursuant to ECC 5.30.120. • Applicant, on behalf of his or her spouse, heirs, assigns, and successors in interests, agrees to indemnify defend and hold harmless the City .ofEdmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance for this permit. Issuance ofthis permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. • Referto City of Edmonds Water service lime handout for approved pipe materials, inspections and other requirements. • Owner/Contractor to provide Water Service Line as built at final inspection. See City Standards for requirements. THIS PERMIT AUTHORIZES ONLY THE WORK NOTED. THIS PERMIT COVERS WORK TO BE DONE ON PRIVATE PROPERTY ONLY. ANY CONSTRUCTION ON THE PUBLIC DOMAIN (CURBS, SIDEWALKS, DRIVEWAYS, MARQUEES,' ETC.) WILL REQUIRE SEPARATE PERMISSION. PERMIT TIME LIMIT: SEE ECDC 19.00.005(A)(6)` IBUILDING _ .. .... -. a ENGINEERING (425) 771��0,22.,..0 ..E._X..T 13..2...6 1G—omo:-' wmmw-w.edmondswa.gov d-in, mnt.Inspeections_.------..... .. ...... ._ .. . 2. Then: Senrices are now scheduled online. If you FIRE (425) 775-7720 3. Then: Permits/Development ' have, difficulties, please call the ,4, Then: Online Permit Info Building Department front desk for PUBLIC WORKS (425) 771-0235 5: If you don't have one already, create a 'assistance during office hours. login (upper right hand corner) (425) 771-0220 RECYCLING(425) 275�801 6 Schedule �rourwlnspection w w w ry w 0 E-Water, Service Line