This form may be used to help! establish the percentage of
demolition work performed to Ian existing home in the course of
a remodel. Once demolition has met or exceeded 50% of the
value of the existing home's replacement cost, the structure will
be required to be rebuilt to the Istandards of new construction.
I
Replacement cost of existing I ome S 322.778
How was the value determined? Values of remaining
components, is replacement va'ues using 2017 RS Means Data.
. . V I-_ -2 - lrl� �f% f%^I%
Component Percentage Value of remaiding Condition Notes
to remain
component
Foundation
100
21584
Good
Floor Framing
100
12026
Fair
Some overframing & repairing
Floor Insulation 100
1500
Fair
Wall Framing
69
22385
Good
Only some interior walls will
be replaced
Wal I Insulation
100
3000
Unkown
Siding
100
36091
good
Some patching
Roof Framing
96
26673
Fair -good
Attic Insulation
100
1400
Fair
Windows
10
1858
Good
Doors
10
2513
Good
Plumbing
25
2000
Fair
Electrical
25
2000
Fair
HVAC
50
6521
Good
Drywall
50
12623
Fair
Cabinets
0
0
Deck 100 12376
Other 8878
TOW 172778
Owner zw��5,
Date
Contractor
Fair Some repairing
5% Overhead/contigencY
54% of existing to remain