Loading...
2017-1100 Maiefski.pdfOV EDAI 0 DATE: TO: FROM RE: City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 August 30, 2017 Jim Musar. ASPECTS IN C@COMCAST. NET Eric Carter, Plans Examiner Plan Check: BLD2017-1 100 Project Address: 231 Elm Way Scope: Addition of SFR Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicatinz where the 'clouded' or otherwise highlij!hted chani!es can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. 1. It appears that page 3 contains structural elements that have been designed by the Engineer of Record. WAC 196-23-020 requires every page of a plan set that has work prepared by a Washington State licensed Engineer to be stamped or sealed. Please have the EOR stamp and or seal each page that has been prepared by them. Please let me know if I can be of any further assistance. Sincerely, Eric Carter Page 2 of 2