Loading...
20171122144951.pdfOME4GAIX 0707 EE%ra-weAt, W^ 00201 ne ENONEERM, INC. t 4A2Z.:3S7.-3S2O f 425.7-SO-1 058 November 8th, 2017 City of Edmonds Engineering Division Mitch Boyd RE: Correction Letter for Hung Mobile Dear Staff, This letter is intended to summarize the changes made to the engineering package submitted for the initial permit review for this project. This letter addresses comments from the Engineering Division which were provided via email. I have tried to format this letter to match the comment letter for easier understanding. General The applicant will provide the Side Sewer Permit Application form at the time of resubmittal. 2) It is understood that additional comments may be produced after the next review. SWPPP and Grading Plan 3) The plan has been renamed to SWPP and Demolition Plan. 4) The notes that reference the new home have been removed from the SWPPP and Demolition Plan. 5) The painted power/phone line has been added to the SWPPP and Grading Plan. 6) A note has been added to the plans that "all disturbed soils will be amended per BIVIP T5.13. 7) A callout has been added to the SWPPP and Demolition Plan that states that the water line is to be disconnected at the meter during construction and a hose bib is to be installed with an AVIB at the meter. A standard detail for the AVB has been added to the plans as wel.l. Drainage and Utility Plan 8) Proposed grading contours have been shown on the plans. 9) A note has been added to the plans that states a minimum of 10' of horizontal separation is required between water and sewer lines. 10)A note has been added to the plans that states a minimum of 5' of horizontal separation is required between water and storm lines. The water and storm lines have been adjusted to achieve this. 11) The entire sewer run is shown from the sewer main to the house. 12) The pipe size has been labeled. The material of the pipe was not called out, as the sewer lateral and side sewer will be reused (see comments 16-17). 13) A callout was added to show the 6" sewer clean out, and the note was added to the plans. 14) The note about cutting and capping the side sewer has been removed from the Drainage and Utility Plan 15) A sewer clean out has been shown within 2' of the house. 1% feJE aN. I `NE E FR-I NcG;, IAN C. 2-707 Wa--tirnconm Aft%r4mnLma-- 1E%r*w*btt, W^ 002011 * 42S-:38-7-ZI320 * 42S.2S!9.1 OSS 16) A note about TV'ing the side sewer was added to the plans. 17) A note about having the City's Public Works Department TV the lateral was added to the plans. 18) All dry utilities (power, phone) have been shown and called out on the plans. A note has been added that all dry utilities must have at least 3' of separation from any wet utilities. 19) Footing drains are not proposed for this project. 20) Invert elevations have been provided for all stormwater pipes at the at downspouts and catch basins. 21) The cross slope arrows on the driveway detail were corrected. 22) A note has been added to the plans that states "all final restoration shall be completed by the contractor, not the city of Edmonds." Thank you for taking the time to review the revised plans and report for this project. Please feel free to contact me with any questions you may have. Sincerely, Christopher A. Bydlon E.I.T