Loading...
2017-1167 Goldstein.pdfCity of Edmonds OV EDAI 0 PLAN REVIEW COMMENTS . ..... BUILDING DIVISION (425) 771-0220 DATE: September 7, 2017 TO: Steve and Gina Goldstein stevegcts-coxom FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2017-1167 Project Address: 524 3 rd AVE N Scope: Alteration / Single Family Dwelling, — R-3/U occupancy group — V-B construction— mechanical and plumbing included Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, includint! a written response in itemized letter format indicatin2 where the 'clouded' or otherwise hi2hli2hted chani!es can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 d Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. During the cursory review of the submitted building plans, several items were found to be insufficient or more clarification is needed prior to plan approval. General: 1. Structural drawings were provided with submittal but gravity calculations were not included. The City of Edmonds requires that any load carrying member 8' or longer must have calculations provided. Please provide gravity calculations for the proposed plan. 2. The proposed engineers design shows a 4x4 post to footing. The new and or existing footing size was not identified. Please add to the plans. This plan review has not been completed, additional comments may be generated upon review of the resubmitted documents. Please let me know if I can be of any additional assistance. Eric Carter Page 2 of 2