Loading...
2017-1230 Ace Hardware Garden Center #2.pdf0,V EDAf DATE: April 9, 2018 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Mike Baily LDG Architects Email: Mike&ldgarchitects.com FROM: Leif Bjorback, Building Official RE: Plan Check: BLD2017-1230 2 "d Review Project: Ace Hardware Garden Center Project Address: 550 5th Ave S During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. Text that is italicized below is thatfor unresolved comments. New comments (41912018): The most recent information (provided via email) for the polycarbonate roofpanels applies to the Amerilux MR 12 " corrugatedpanels, and appears to be adequatefor determining the structural requirements in comment #8 below. However, the product testing information previously provided that applies to thefire resistive properties addressed in comment #10 below isfor an entirely different product, the Makrolon Multi Wall 8mm sheet. Please clearly state which roofingproduct will be used, andprovide the lacking information accordingly. Please coordinate the roofing product callouts and associated information on the Nexus plan sheets, showing whichever of the two products you choose to use. (Currently, GH-1. 1, GH-2. 0 and GH-2. I specify the corrugatedpanels, while sheet GH-3. 0 contains detailsfor the multi -wall product.) Sheet A- 1. 0 l. Resolved. 2. Resolved. Sheet A-2.0 3. Resolved. 4. Resolved. 5. Resolved. Sheet GH-0.0 6. Resolved. 7. Resolved. Page 1 of 2 8. Provide structural calculations or approved technical data to show how the polycarbonate roof panels meet the structural requirements of IBC 2606.5 Sheet GH- 1. 1 9. Resolved. 10. Provide product specifications for the the roof panels to show compliance with the ASTM and UL testing standards as required in EBC 2606.4. General 11. Resolved. 12. Resolved. 13. Resolved. Thank you. Page 2 of 2