2017-1435 Edmonds 2020 LLC MP Review03.pdfRainBOW conSULTing MECHanicaL EnginEERINg January 22, 2018 Mr. Leif Bjorback Building Official City of Edmonds 121 Fifth Avenue North Edmonds, Washington 98020-3145 Subject: Edmonds 2020 LLC BLD2017-1435 Plumbing Permit Review 03 I have received and reviewed the above referenced project for conformance with the following codes, as adopted and amended by the State of Washington and the City of Edmonds: 2015 Uniform Plumbing Code (UPC) 2015 Washington State Energy Code, WAC 51 -11 (WSEC) The comments listed below only apply to the documents submitted with the building permit application for the plumbing review: 1. General: Increase text size to 1/8" so that plans are clearly legible. I" Applicant response: Text has been increased. Resolved. 2. General: Provide water heater installation detail. I" Applicant response: Located on P12.00. Per UPC 507.5 indicate how the drainage pans located beneath the water heaters are drained to an approved location; either a floor drain, hub drain or to the outside — draining to the garage floor is not acceptable. Please indicate this on the plumbing plans. 2nd Applicant response: All lines from water heater pans and T&Ps not able to drain to A W boxes have been re-routed to Hub Drains located in parking garage or RP room located on 1st floor. Detail for indirect drains and trap primers located on P12.00. Detail for indirect drains and trap primers not located on sheet P12.00. It appears that the oil/water separator detail was mistakenly included on sheet P12.0 instead. Provide required detail and/or drain make and model number. 3. General: Provide building backflow preventer installation detail. IstApplicant response: Located on P12.00 Resolved. 4. General: Provide firestop detail for water closet installation. Rainbow Consulting Mechanical Engineering 336 NW 50"' Street, Seattle, WA 98107 www.rainbowconsulting-me.com Steven Rainbow, PE Phone 206.235.6002 steven@rainbowconsulting-me.com Edmonds 2020 LLC BLD2017-1435 Plumbing Review 03 January 22, 2018 Page 2 of 3 Ist Applicant response: Firestop detail located on P12.00 water closet flanges will be installed in fire rated PT cans i.e. Hilti or Hold Rite. Resolved. 5. Sheet PO.00, Gas Piping: Indicate longest length used as the basis for gas pipe sizing; indicate gas piping material. Provide gas piping riser diagram. Ist Applicant response: Located on pgs. P9.00 and P13.00. Resolved. 6. Sheet P1.00: Provide a schedule including pump data, for the groundwater/storm vault. If this is scheduled elsewhere in the plan set, provide a sheet reference. I" Applicant response: Pump data will be provided once pumps have been chosen by building owner. Pump selections for the basis of design is required to be included with permit documents; coordinate with building owner as required. 2 n' Applicant response: Pumps have been chosen, schedule is located on PO. 0 1. Resolved. 7. Sheet P2.00: Vents have been omitted from the garage drains connected to oil/water waste line connected to the sand & oil/water interceptor. In accordance with UPC 902.1, vents are permitted to be omitted from the drains connected to the oil/water interceptor where the drains are provided with a settling tank. Provide a schedule for the garage drains indicating a catch basin or other form of settling tank. Ist Applicant response: Schedule located on PO. 0 1, vent has been added to the catch basin per code. Vent can be viewed on P2. 00. The garage drains are required to include a settling tank (perhaps more commonly known as a catch basin). Page 275 of the UPC Illustrated Manual is attached to illustrate what is required. A schedule for the garage drains is required to include make and model number so that the inclusion of the settling tank/catch basin can be verified. 2 nd Applicant response: Details for the garage drains have been added to P12.00. Detail for garage drains not located on sheet P12.00. It appears that the oil/water separator detail was mistakenly included on sheet P12.0 instead. Provide required detail and/or drain make and model number. 8. Sheet P2.00, The sand & oil/water interceptor has not been provided with vents as required by UPC 1017.1. The separation or vapor compartment shall be independently vented to the outer air. Where two (2) or more separation or vapor compartments are used, each shall be vented to the outer air. Additionally, the interceptor shall be vented on the sewer side and shall not connect to a flammable vapor vent. All provisions of UPC 1017.0 shall be strictly adhered to. Provide sand & oil water inceptor installation detail. Ist Applicant response: Vent has been added and installed see P2. 00 and P3. 00 for overhead installation. Typical installation detail has been added on P12.01. The sand & oil/water separator detailed in the plans do not meet the City of Edmonds Engineering Division standards for separators. While the sizing of the separator capacity is the responsibility of the Engineer, the minimum separator size required for this project is 100 gallons. Please note that these standards are new and are Rainbow Consulting Mechanical Engineering 336 NW 50"' Street, Seattle, WA 98107 www.rainbowconsulting-me.com Steven Rainbow, PE Phone 206.235.6002 steven@rainbowconsulting-me.com Edmonds 2020 LLC BLD2017-1435 Plumbing Review 03 January 22, 2018 Page 3 of 3 different that they would have been for Phase 1 of the project. A copy of the standards is attached for review. Please include the sizing calculation on the plans along with the correct oil/water separator installation detail. 2n' Applicant Response: New detail for oillwater separator have been added to 12.01 per email dated 11812018 from Leif Bjorback. Baffles will be added to separator and 6" stand will be added to meet requirements. The oil water separator detail on sheet P12.01 indicates that the ejector pump is located within the separator. As described by King County, the design of an oil water separator operates in such a way that, "the large capacity of the vaults slows down the wastewater, allowing oil to float to the surface and solid material to settle out." Thus, installing a pump within the separator will not allow the oil to float to the surface; the lift station is required to be separate from the separator. Provide revised plans and details as required. 9. Sheet P2.00: The plans indicate that the sand & oil/water separator has a 2" pump line to overhead plumbing. On sheet P3.0, there appears to be another pump line connected to the sand & oil/water separator (20 GPM). Please clarify the installation. Ist Applicant response: The 2" pump lines have been separated and drawn to the appropriate sewer or storm lines. These were installed per 710.3 (1) 20 GPM minimum. Both interceptors have been determined to receive less than 5-10 GPM, See related comments above. 10. Sheets P10.00 and P1 1.00: Domestic water plans are incomplete. Complete plumbing design and resubmit. I st Applicant response: Riser diagram and typical manifold installation have been included on P14.00. Resolved. If you have any questions or require additional clarification on any of the items contained in this letter, please email me at steven@rainbowconsulting-me.com or contact me directly at 206-235-6002. Sincerely, Rainbow Consulting LLC Steven Rainbow, PIE cc: Douglas Beck, Beck & Associates, PLLC, beckpllc@msn.com Enc. Rainbow Consulting Mechanical Engineering 336 NW 50"' Street, Seattle, WA 98107 www.rainbowconsulting-me.com Steven Rainbow, PE Phone 206.235.6002 steven@rainbowconsulting-me.com 62.5" A A 04 7-1-77' 7-/-77 Z7 7n-,7�/7 7-1--7' r// � � z � � � T PROVIDE GASKET SEALED CAP FOR INLET TEE, FOR INTERIOR INSTALLATION ONLY 2.75" NOTES: GALVANIZED DIAMOND-y COVER PLAN PLATE COVERS WITH BOLT -DOWN LOCKS PROVIDE GASKET SEALED CAP FOR OUTLET TEE, FOR INTERIOR INSTALLATION ONLY 1.5"-5- 3.5 . ADJUSTMENT SLOTS ADJUSTABLE INLET /-SAMPLING TEE BAFFLES - ���W�ATER LEVEL INLET A I I GRIT/SLUDGE 4 RETAINER WEIR A 10 �J' '-A 17.5" 8" 22.5" 14.5" SECTION AA INSPECTION/SAMPLING TEE - SEE NOTE 3 OUTLET A * (o 1. USE UTILITY VAULT COMPANY INC. MODEL #25-SA OR EQUAL. PRECAST VAULT SHALL HAVE KNOCKOUTS AT ALL PIPE OPENINGS. IF KNOCKOUTS ARE NOT PRESENT, THEN PIPE OPENINGS SHALL BE CORE -DRILLED. PIPE OPENINGS SHALL BE 2" LARGER THAN THE PIPE DIAMETER. 2. LOCATE VAULT WITHIN 20' OF DRIVE FOR ACCESS BY MAINTENANCE VEHICLES. 3. PVC INSPECTION AND SAMPLING TEE SHALL BE THE SAME SIZE AS THE OUTLET PIPE FOR 6" OUTLET OR GREATER. USE 6" BY OUTLET -SIZE TEE WHERE OUTLET PIPE SIZE IS LESS THAN 6". INSTALL GASKETED CAP ON TOP OF THE SAMPLING TEE, FOR INTERIOR INSTALLATION ONLY. 4. FILL WITH CLEAN WATER PRIOR TO START-UP OF THE SYSTEM. 5. GRAY AND BLACK WATER SHALL BE CARRIED BY SEPARATE SIDE SEWER. 6. PIPE CONNECTION TO VAULT: KOR-N-SEAL OR EQUAL FOR CORE -DRILLED OPENINGS, OR SAND COLLAR FOR KNOCKOUT OPENING. SEAL ALL PIPE CONNECTIONS WITH NONSHRINK GROUT. 7. INTERIOR OIL/WATER SEPARATORS SHALL HAVE VENTING PER 2009 UNIFORM PLUMBING CODE REQUIREMENTS. 8. PRIOR TO STARTUP, OIL/WATER SEPARATOR SHALL PASS 1% PER DAY LEAK TEST WHERE ONLY A MAXIMUM OF 1% OF DEAD STORAGE REDUCTION IS ALLOWED WITHIN A 24 HOUR PERIOD PER THE 2009 UNIFORM PLUMBING CODE 712.2. 9. ACCESS LID SHALL HAVE SLIP RESISTANT TREATMENT. CITY OF EDMONDS PUBLIC WORKS DEPARTMENT "�st. IB9- 100 GALLON BAFFLE TYPE OIL/WATER SEPARATOR APPROVED BY: R. ENGLISH REVISION DATE OCTOBER 2015 STANDARD D ETAI L E6.1 4 VENTS @Vents Not Required. 903.0 Materials. 3 kderceptor. Vent piping shall be permitted to be 903.1 Applicable Standards. Vent pipe and fittings bd on an interceptor where such interceptor acts as a shall comply with the applicable standards referenced in my settling tank and discharges through a horizontal Table 701.2, except that: =waste pipe into a secondary interceptor. The second (1) No galvanized steel or 304 stainless steel pipe shall be o*wr shall be properly trapped and vented. installed underground and shall be not less than 6 inches IM See Figure 902.1 for an illustration of this instal- (152 nim) aboveground. L Section 1009.0, Interceptors (Clarifiers) and Separa- (2) ABS and PVC DWV piping installations shall be in accor- md Section 1016.0, Sand Interceptors, are the areas dance with the applicable standards referenced in Table sed by this exception. 170 1. 1, and Chapter 14 "Firestop Protection." Except for indi- 2 Bars, Soda Fountains, and Counter. Traps vidual single-family dwelling units, materials exposed within ig sinks that are part of the equipment of bars, soda ducts or plenums shall have a flame -spread index of not more bins. and counters need not be vented where the loca- than 25 and a smoke -developed index of not more than 50 =ad construction of such bars, soda fountains, and where tested in accordance with ASTM E84 or UL 723. aws is such as to make it impossible to do so. Where 903.2 Use of Copper or Copper Alloy Tubing. conditions exist, said sinks shall discharge by means Copper or copper alloy tube for underground drainage and piroved indirect waste pipes into a floor sink or other vent piping shall have a weight of not less than that of Nwd type of r e al g e WV. IMThis s ction allows indirect waste for special ' 903.2.1 Aboveground. Copper or cop alloy tube for J where ven g is impossible. An example would be aboveground drainage and vent piping shal have a weight bar with eating around it where an adjacent wall is of not less than that of copper or copper all drainage tube le for[a vent. Traps serving soda fountains and type DWV. sinks th are part of the bar equipment may be y waste into an approved receptor. Therefore, lie 903.2.2 Prohibited Use. Copper or c per alloy tube t 8, Indire t Wastes will apply. See Figure 902.2 for shall not be used for chemical or indu ial wastes as of thi installation. defined in Section 811.0. Opeq Grill C.O� C.O. 7 _�! n n Settilling Tank Interceptor FIGURE 902.1 VENT NOT REQUIRED ON SECONDARY INTERCEPTOR Bar Sink Indirect Waste Pipe lf� , - ILI� i -; � T, -.�_ -� *,& ­0 ir�. —.' 7�f -.*:,Ip � ". U 40"'3111- Floor Sink Vented Trap Un� ented "ap FIGU NOT REQUIRED UNIFORM PLUMBING CODE ILLUSTRATED TRAINING MANUAL 275 steven@rainbowconsulting-me.com From: steven@rainbowconsuIting-me.com Sent: Monday, January 8, 2018 10:02 AM To: 'Josh Tomulty' Cc: 'Douglas' Subject: FW: Print Review BLD2017-1435 (Edmonds 20120) Hi Josh, Please see below for direction regarding the oil/water separator. Please detail these items in your revised plans. Thank you, Steven Steven Rainbow, PE Rainbow Consulting LLC 206.235.6002 www.rainbowconsuIting-me.com From: Bjorback, Leif [maiIto:Leif.Bjorback@edmondswa.gov] Sent: Monday, January 8, 2018 9:58 AM To:'Douglas'<beckpllc@msn.com> Cc: Steven Rainbow <steven@rainbowconsulting-me.com> Subject: RE: Print Review BLD2017-1435 (Edmonds 20/20) Doug and Steven, For this installation the city is OK with the minor modifications they have proposed, ie. The retrofitting of baffles and the elevation of the pump. Thank you. Leif From: Douglas [mailto:beckpllc@msn.com] Sent: Thursday, January 4, 2018 4:53 PM To: Bjorback, Leif <Leif. B6orback@edmondswa.gov> Cc: Steven Rainbow <steven@rainbowconsulting-me.com> Subject: Fw: Print Review BLD2017-1435 (Edmonds 20/20) Leif, Would you please take a look at the email interchange below regarding the oil/water separator for the Edmonds 20/20 project? It seems your input is needed. Thank you, Douglas Beck, PE, SE Beck & Associates, PLLC 16425 SE 66th Street Bellevue, WA 98006 206-313-3739 beckpllc@msn.com From: steven@rainbowconsulting-me.com <steven@rainbowconsulting-me.com> Sent: Thursday, January 4, 2018 8:03 AM To:'Douglas' Subject: FW: Print Review BLD2017-1435 Hi Douglas, The City will need to make a decision on this one. I don't understand why this got approved in phase one as it is not a code approved oil/water separator. Thanks, Steven Steven Rainbow, PE Rainbow Consulting LLC 206.235.6002 www. rain bowconsulti ng-me.com From: Josh Tomulty [mailto:oosh.t@bestplumbing.com] Sent: Thursday, January 4, 2018 6:52 AM To: 'Douglas' <beckpl lc@ msn.com>; steven@rainbowconsulting-me.com Subject: Print Review BLD2017-1435 Thank you for the review, We have verified the dimensions of the sand/oil we are proposing to use and it will meet the minimum requirements for the 100 gallons however it does not currently have baffles nor is there a settling tank attached. This particular device has been installed and cast in concrete. We were basing the design of the system on the attached first phase of this project which was approved. We can add baffles based on the requirements set forth by the City if necessary, however would it be possible to elevate the pumps to meet the required 6" minimum gap instead of a gravity system? 4 Based on the performance of the attached building there will be little to no measurable water or other substances actually entering the basin. Attached is a page from the original approved submitted prints. Thank You Josh Tomulty Journeyman Plumber Senior Superintendent plumbing SERVICE - SEWER - SHOWROOM P: 206.633.1700 C: 425.327.5600 1 www.bestplumbing.com Follov� 6 "The quality of a man's life is in direct proportion to his commitment to excellence, regardless of his chosen field of endeavor." -Vince Lombardi