Loading...
2017-1446 Parrett deck replacement.pdfCity of Edmonds OV EDAI 0 PLAN REVIEW COMMENTS . ..... BUILDING DIVISION (425) 771-0220 DATE: October 31, 2017 TO: Andreas Winardi andreas@b2engineers.com FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2017-1446 Project Address: 21080 88th PL W Scope: Deck replacement Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the 'clouded' or otherwise hi2hli2hted chanus can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 d Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General: 1. Lateral load connections are required per IRC 507.2.4. A minimum of 2 connections with a 1500# capacity within 24" of each end the deck or 4 connections with a minimum of a 750# capacity are required. Please indicate on the plans. 2. The 4x 10 PT beams, assumed to be HF#2, proposed on the plans are severely overstressed for the anticipated loads. This beam will need to be of a larger size or decrease the span, please take into account of a minimum of I OPSF of "dead load" and 60PSF of "live load" when sizing your framing members. Furthermore; per the requirements of the NDS, wet service and incising factors also apply. Please clarify and change on the plans. 3. The 2x8 PT joists, assumed to be HF#2, proposed on the plans are severely overstressed for the anticipated loads. These joists will need to be of a larger size or decrease the span, please take into account of a minimum of lOPSF of "dead load" and 60PSF of "live load" when sizing your framing members. Furthermore; per the requirements of the NDS, wet service and incising factors also apply. Please clarify and change on the plans 4. Detail 3 appears to indicate stair construction details but does not include riser requirements. Please add the stair riser requirements per IRC R311.7.5.1 to the plans. 5. A graspable handrail per IRC R311.7.8 is also required. Please add the handrail to the plans. Please let me know if I can be of any further assistance. Sincerely, Eric Carter Page 2 of 3 Page 3 of 3