Loading...
2017-1714 Day SFR (2).pdfOV EDAI 0 DATE TO FROM RE: City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 March 2, 2018 Morris Originals C/O Corry Morris CORRY@MORRISORIGINALS.COM Eric Carter, Plans Examiner Plan Check: BLD2017-1714 Project Address: 219 Skyline Drive Scope: New SFR on existing foundation Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the 'clouded' or otherwise hi2hli2hted chan2es can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 nd Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. This building plan review cannot be completed until we receive the following items: General: 1. RIECONCILED Structural and lateral calculations from Chris Covington P.E. were provided with the submittal. Any plans and or details designed by the Engineer of Record that have been applied to the plans by other than the E.O.R. must be reviewed for compliance and stamped as so. Please provide two sets of plans reviewed and approved by the E.O.R. A103 MIT 2. RECONCILED The prescriptive energy code compliance worksheet has been included with the submittal but the information is required to be on the plans. Please indicate the elected credits and associated appliances on the plans. 3. RECONCILED 2015 IRC section 308 requires glazing located in hazardous location to be "safety glazed". Please identify the required glazing locations on the plans. 4. RECONCILED 2015 IRC section 310 requires at least one emergency escape and rescue opening for basements, habitable attics, and every sleeping room. Please indicate on the plans, the location, size, and operation of each required opening per IRC 3 10. 5. RECONCILED 2015 IRC section 314 requires smoke alarms to be installed in each sleeping room, outside each sleeping area, on each individual story of the dwelling, including basements and habitable attics. Please indicate the locations of the interconnected smoke alarms on the plans. 6. RECONCILED 2015 IRC section 315 requires an approved carbon monoxide alarm to be installed outside each sleeping area in the immediate vicinity of the bedrooms and each level of the dwelling. Please indicate the location of the CO alarms on the plans. 7. RECONCILED 2015 IRC section 1507 requires the installation of local exhaust in each kitchen, bathroom, laundry room, water closet, laundry room, or any other room where water vapor or cooking odor is produced. Furthermore; Whole house ventilation is also required in accordance with section 1507.3. Please indicate the location and CFM rating of each local exhaust and whole house ventilation on the plans. 8. RECONCILED The plans indicate a number within a triangle at several locations along the perimeter walls. Is this identifier being used to indicted shear wall designation? Please clarify and add directives to the plans. 9. With shear wall I being indicated on the back wall of the garage and the man door perforating that wall. Will additional STHD I ORJ hold downs or force transfer around the opening be required? Please clarify. 10. There are several locations where an H is indicated. It is understood that the H refers you to the structural pages but does not direct you to which page for a specific detail. Please add the proper directive to the plans. 11. The 6x6 DF #I post supporting RB 5 appears to conflict with the garage man door and does not appear to line up with the identified isolated pier below. Please clarify and change on the plans if necessary. Page 2 of 4 A109 12. The directive callout at the front of the garage indicates "see 3/S-7.0". Detail 3 on S7.0 is for the living room moment frame. Please clarify and change on the plans. 13. The isolated piers shown on the plans which appear to support the moment from for the kitchen are of equal size unlike the rest of the piers on the plans. Furthermore; the pier to exterior comer of the foundation has not been identified for size. Please clarify and change on the plans. 14. The beam supporting the roof joist which spans over the " en suite" does not appear to be labeled for size or have supporting calculations. Please clarify and change on the plans. 15. It is unclear how the 5 1/2"x 12" GLB (RI35) will be supported at the end intersecting with the 6x 10 DF #1 beam. Please clarify and add any hardware or supporting identifiers to the plans if necessary. 16. There is a note on the plans that indicates that the 2x12 DF ledger will be fastened to the upper wall and mid height ceiling rafters hung off @ 24" OC typ. The fastener type and spacing does not appear to be identified on the plans. Please clarify and information to the plans if necessary. Please let me know if I can be of any additional assistance. Eric Carter Page 3 of 4 Page 4 of 4