2018 Edmonds Museum Window Replacement Project narrative.docxEdmonds Museum Window Replacement Project
Our intent is to replace the existing single pane double insulated glazing (approximately 4’x9’) on the second floor and replace with traditional wooden double hung sash with a 50/50
upper and lower sash split and a ¼ / ¼ individual sash glazing split to match original historic installation. The double hung sash will be singe pane glazed functional historically
accurate representations of the original 1910-11 sash. Glazing will be point mounted and putty sealed and finished and painted to match existing exterior.
The upper and lower sash will be fully operable by use of in wall iron counter balanced weights. The lower sash will be lift grasp handle operated, and upper sash will be operated by
a pull/push hook system as specified in the 1910 specification document. All hardware and locks will be original refurbished or modern equivalent of historic design. All wood molding
details will match existing or be reused if existing.