Loading...
2018.05.30 Iguchi Final Summary Letter.pdfC sfa i May 3 0, 2018 SFA Elo�ign GrOLIP, LLE: STRUCTURAL I CIVIL I GEOTECHNICAL I LAND USE PLANNING 9020 SW Washington Square Drive, Suite 505, Portland, Oregon 97223 1813 Rutan Drive, Suite C, Livermore, California 94551 1912 S 146th Street, Seattle, Washington 98168 p: 503-641-8311 www.sfadg.com Special Inspection FINAL SUMMARY REPORT City of Edmonds Development Services Department ATTN: Special Inspections RE: Project Name: Iguchi Residence Underpinning Project No.: MFR18-007 Permit No.: BLD2018-0417 Address: 19230 94th Avenue W, Edmonds, WA 98020 Dear Building Inspection Division: This letter serves to certify that in accordance with Chapter 17 of the International Building Code requirements outlined in the General Structural Notes on S 1. 1 of the approved permit drawings, SFA Design Group, LLC has performed special inspection as detailed below. The inspector observed the installation of (4) FSI Pin Piles, verifying pile locations, installation depth, drive, bracket type, pile type, pile diameter and thickness. To confirm pile capacity, load tests were observed following installation and the results were within approved allowances. Please see attached field installation logs and load test data dated, 05/22/2018. All piles were installed per the intent of the design and any installation deviations were reviewed and approved by this office with no outstanding non-compliance items. Our inspection and testing services do not constitute a warranty or guarantee of any type and were provided and intended to help reduce the risk of construction defects, deficiencies or omissions that may arise during and after construction. It is the contractor's responsibility to perform their work in accordance with the approved construction documents. All inspections and tests were performed and reported according to the requirements of the City Building Regulations and these Administrative Rules and, to the best of my knowledge, the work was in conformance with the applicable workmanship provisions of the State Building Code and Standards. Sincerely, Dusti Huddleston Engineer Technician — SFA Design Group Cc: Tara Todd, Matvey Foundation Repair Reviewed by: Jeff Fitch, PE, P.Eng, SFA Design Group, LLC MFA Manign 6MLAP. LLE STRUCTURAL I CIVIL I LAND USE PLANNING I SURVEYING Portland, Oregon 97223 1 Livermore, CA 94551 P: (503) 641-8311 F: (503) 643-7905 -1 www.sfadg.com fa 9020 SW Washington Square Dr., Suite 505/1813 Rutan Dr, Suite C Mf FIELD INSTALLATION LOG Project Name: Contractor: Site Address: 0 Project Foreman: Install Date: 572,1 A9 Contractor Arrival: Inspector Arrival: Inspector Departure: Permit Number: �BLb 2101 Inspector Name: C3 W(Awrr"" Jurisdiction: (,/j Location Part Description Pier CID, in Pier Wall Thickness, in Pier Segmeht Length, ft Installation Pressure, psi 57 VQ coil-, (n- -Fs( 26� (Z Non -Compliance Items: Inspector Signature: Rev 2016.01.25 SFA 13liamigra 153111-0111-111p, LLE STRUCTURAL I CIVIL I LAND USE PLANNING I SURVEYING 9020 SW Washington Square Dr., Suite 50 1813 Rutan Dr, Suite C Portland, Oregon 97223 Y Livermore, CA 94551 P: (503) 641-8311 F: (503) 643-7905 www.sfadg.com LOAD TEST LOG Project Name: Contractor: Site Address: Project Foreman: Test Date: Ll te) Permit Number: Inspector Name: Jurisdiction: Pier Tested: Test Pressure, psi: Working Load, kips: Total Creep, in: Test Load, kips: 1 min: 5 min: 15 min: 40 min: 2 min: 6 min: 20 min: 50 min: a) 3 min: 10 min: 30 min: 60 min: 4 min: Pier Tested: Z'_ Test Pressure, psi: Working Load, kips: Total Creep, in: Test Load, kips: 1 min: 5 min: 15 min: 40 min: 2 min: 6 min: 20 min: 50 min: CL 3 min: 10 min: 30 min: 60 min: 4 min: Continuous special inspection is required during installation per 2012 IBC section 1810.4.12. Load testing shall be performed in accordance with ASTM Method D1 143 (Quick Method). 20 percent of piers shall be tested to 150 percent of design load. Load testing creep acceptance criteria shall be no greater than 0.04 inches within a 10 minute period. If movement is observed greater than 0.04 inches within the 10 minute period the load test shall be held for an additional 50 minutes, the pier is to be deepened and re -tested, or the pier is to be abandoned and replaced with a new pier. If the load test is to be held the pier movements shall be measured at 15, 20, 30, 40, 50, and 60 minutes. The creep versus the logarithm of time shall be plotted. If the creep rate is less than 0.080 inches between 6 and 60 minutes, the load test shall be considered successful. Non -Compliance Items: Note: Load test performed utilizes a hydraulic load cylinder with an effective bore diameter of 3.5" which equates to an operating hydraulic area of 9.62 in 2. Pier Test Pressure (psi)= [Design Load] X 1.5 9.62in 2 Inspector Signature: Rev 2013.01.31 SFA Iliesign Bruzip. LLr_ STRUCTURAL I CIVIL I LAND USE PLANNING I SURVEYING Portland, Oregon 97223 Livermore, CA 94551 P: (503) 641-8311 F: (503) 643-7905 -1 www.sfadg.com 9020 SW Washington Square Dr., Suite 505/1813 Rutan Dr, Suite C LOAD TEST LOG Project Name: �4 Contractor: Foreman: Site Address: qqO&CAl"OZC�0Jp�Project Test Date: Permit Number: Inspector Name: Jurisdiction: Pier Tested: Test Pressure, psi: Working Load, kips: Total Creep, in: Test Load, kips: 1 min: 01A___ 5 min: 15 min: 40 min: 2 min: 6 min: 20 min: 50 min: L) 3 min: 10 min: 30 min: 60 min: 4 min: Pier Tested: Test Pressure, psi: Working Load, kips: Total Creep, in: Test Load, kips: 1 min: 5 min: 15 min: 40 min: 2 min: 6 min: 20 min: 50 min: Q 3 min: 10 min: 30 min: 60 min: 4 min: Continuous special inspection is required during installation per 2012 IBC section 1810.4.12. Load testing shall be performed in accordance with ASTM Method D1 143 (Quick Method). 20 percent of piers shall be tested to 150 percent of design load. Load testing creep acceptance criteria shall be no greater than 0.04 inches within a 10 minute period. If movement is observed greater than 0.04 inches within the 10 minute period the load test shall be held for an additional 50 minutes, the pier is to be deepened and re -tested, or the pier is to be abandoned and replaced with a new pier. If the load test is to be held the pier movements shall be measured at 15, 20, 30, 40, 50, and 60 minutes. The creep versus the logarithm of time shall be plotted. If the creep rate is less than 0.080 inches between 6 and 60 minutes, the load test shall be considered successful. Non -Compliance Items: Note: I Load test performed utilizes a hydraulic load cylinder i with an effective bore diameter of 3.5" which equates to an operating hydraulic area of 9.62 in 2 Pier Test Pressure (psi)= [Design Load] X 1.5 9.62in2 Inspector Signature: Rev 2013.01.31