2018-0037 Door hardware.pdfFrom: Sent: To: Subject: Thanks Eric! John -7ohn Cheng John Cheng <jhccheng@gmail.com> Wednesday, March 21, 2018 1:32 PM Carter, Eric Re: BLD2018-0037 - 1st review - Chinese Grace Evangelical church On Wed, Mar 21, 2018 at 1:21 PM, Carter, Eric <Eric. Carter@edmondswa. go > wrote: Hello John, In response to your question, panic hardware would not be required on the door opening to the corridor if it is intended as the main door as stated in IBC 1010.1.9.3. If panic hardware is not to be installed items 2,2.1,2.2, and 2.3 also apply. Please let me know if I can be of any additional assistance. Thankyou, Eric Carter, Plans Examiner eric.carterkedmondswa.gov 425-771-0220 x 1389 E 4fo Development Services Department Building Division 1215"' Avenue N Edmonds, WA 98020 www.edmondswa.jzov Development Services Permit Center Hours Monday & Tuesday - 8:OOAM — 4:30PM Wednesday — 8:30AM — 12:OOPM Thursday & Friday - 8:OOAM — 4:3OPM From: Miller, Chuck Sent: Wednesday, March 21, 2018 8:34 AM To: Carter, Eric <Eric.Carter@edmondswa.go > Subject: FW: BLD2018-0037 - 1st review - Chinese Grace Evangelical church Chuck Miller, Senior Plans Examiner chuck.miller(i�edmondswa.go 425-771-0220 mc. 1757 - Development Services Department Building Division 121 5th Avenue N Edmonds, WA 98020 www.edmondswa.gov Development Services Permit Center Hours Monday & Tuesday — 8:OOAM — 4:30PM Wednesday — 8:30AM — 12:OOPM Thursday & Friday — 8:OOAM — 4:30PM From: John Cheng <ffihccheng@grnail.corn> Sent: Tuesday, March 20, 2018 6:11 PM To: Miller, Chuck <Chuck.Miller@edmondswa.gov> Subject: Re: BLD2018-0037 - I st review - Chinese Grace Evangelical church Hi Chuck, Thanks for approving the permit for the church project # BLD2018-0037 - Chinese Grace Evangelical church. The church people are working on the remodeling now. We want to confirm with you one more time that the new door in red will be the main door and doesn't require a panic hardware per IBC 10 10. 1.9.3.2? The existing door in yellow will remain its existing panic bar and hardware. We want to make sure we comply everything during construction. Please confirm. Thanks, John coutleca YAu 04W 20wHN PATED D" — aim WDTH Pwarwo NNW OCCtVAUT MAO SiGN 82 OCr- TOTAL ADJACENT SUITE FLS PLAN MEETING ROOM I Am] 15 1 5'- 3' qlo T-8' 3'-2' EXISTING CORRIDOR 51-60 kM MEETING ROOM 2 -1-- 1 90.0 1 6 is 1 6.3 37'- 4 - SUITE 110 DINING AREA . Al 91 Ap "All em'"Wi EXT 0 SICA TO Fl?-*W -0 -!�ORAGE T �j C� 1 13001 A CONCRETE SIDEWALK 5'-0' -0' 121-01- 5-0 FOQDSERVI� AREA I cu 1 —1 John Cheng On Mon, Feb 12, 2018 at 9:29 AM, Miller, Chuck <Chuck.Miller&edmondswa. gov> wrote: It's a start... Once the amount of airflow to the dining room is determined you will need to know the percentage of 'outside air' that is being 'mixed' with the return air during heating and cooling. Economizers, dampers, and other equipment and their settings may have an effect on the amount of 'outside air' that is part of that measured. Chuck Miller, Senior Plans Examiner chuck.miller@edmondswa.go 425-771-0220 , /I C. I Y") I Development Services Department Building Division 121 5t" Avenue N Edmonds, WA 98020 www.edmondswa.gov Development Services Permit Center Hours Monday & Tuesday — 8:OOAM — 4:30PM Wednesday — 8:30AM — 12:OOPM Thursday & Friday — 8:OOAM — 4:30PM From: John Cheng [ma i Ito: ihccheng@gmail.com] Sent: Monday, February 12, 2018 8:24 AM To: Miller, Chuck <Chuck.Miller@edmondswa.go > Cc: David Lo <DAVIDL060@msn.com>; ngaiman@yahoo.com; wciho@aol.com Subject: Re: BLD2018-0037 - I st review - Chinese Grace Evangelical church Morning Chuck, Hope you had a good weekend. Regarding #7 comment, how about if we measure the air flow by using a Digital Anemometer? this way we can measure the actual supplying air at the supply outlets serving the rooms and no more guess work. Then we can compare data to the required number from IMC Table 403.3. 1. 1. Do you think this method is acceptable to you? Thanks, appreciate your help. John John Cheng On Fri, Feb 9, 2018 at 2:27 PM, Miller, Chuck <Chuck.Miller&edrqondswa.goy> wrote: 0 #1 — The 'lighting power allowances' allow for incandescent bulbs so the existing fixtures will probably be OK if they have fluorescent bulbs (unless there was way too many fixtures in the first place). Switching to LED bulbs will always comply. 0 #7 — Not really of much help. The unit must have a separate air handler (fan) to move the heated air. First, you will need to know the capacity of the air handler and how it is distributed through the structure by the different connected ductwork. The air handler is configured to add outside air to the return air as it becomes the 'new' supply air. The total capacity of the air handler and the portion of the ductwork serving the 'Dining Area' needs to be sufficient to meet the additional occupant density of that space determined using IMC Table 403.3. 1. 1. Chuck Miller, Senior Plans Examiner chuck.millergedmondswa.ao 425-771-0220 Development Services Department Building Division 1215"' Avenue N Edmonds, WA 98020 www.edmondswa.gov Development Services Permit Center Hours Monday & Tuesday — 8:OOAM — 4:30PM Wednesday — 8:30AM — 12:OOPM Thursday & Friday — 8:OOAM — 4:30PM From: John Cheng [ma i Ito: ihccheng@gmail.coml Sent: Thursday, February 8, 2018 7:59 PM To: Miller, Chuck <Chuck.Miller@edmondswa.go > Cc: David Lo <DAVIDL060@msn.com> Subject: Re: BLD2018-0037 - 1st review - Chinese Grace Evangelical church Sorry, here is the image again. John Cheng On Thu, Feb 8, 2018 at 7:32 PM, John Cheng <jhccheng&gp1q Llcorn> wrote: Hi Chuck, Thanks for your time discussing the comments with me on Wednesday. We are now working on the responses, and we have questions on #1 and #7: #1 - We are still calculating the lighting table. The question is if the existing fluorescent lights are over the allowed value, will just changing the fluorescent lights to LED be suffice? The church is still planning to not change any fixtures due to the budget. #7 - We found spec info of the existing air furnace that is serving the level 1. Please see attached image, will this information be suffice? If so we can attach this info as part of the response. Thank you again for guiding the church through this review process. Appreciate it. John Cheng John Chengpreview attachment 10 232 KB