Loading...
2018-0204 1135 Sierra ( Chermak).pdfOV EDAI 0 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: March 1, 2018 TO: Chermak Construction Dave Pioli FROM: Eric Carter, Plans Examiner RE: Plan Check: BLD2018-0204 Proj ect Address: 113 5 Sierra Place Scope: Repair/ Rebuild existing wood deck and replace wood/concrete patio with concrete. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicatim! where the 'clouded' or otherwise highlij!hted chani!es can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 d Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. This building plan review cannot be completed until we receive the following items: General: 1. The provided site plan and details by B2 Structural Engineers was not enough information to review. Please provide a detailed plan of the deck that is to be replaced and or repaired. The working plans will need to include dimensions of the deck, joist size, timber species, and spacing. Please also include, what will be replaced and what is existing as well as where the details from B2 will be applied. Please let me know if I can be of any additional assistance. Eric Carter Page 2 of 2