2018-0323 Abra Auto Spray Booths.pdf0,V EDAf DATE: April 24, 2018 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 TO: Henry Byarn Email: Wkwescogroupinc.com FROM: Leif Bjorback, Building Official RE: Plan Check: BLD2018-0323 Project: Abra Auto Spray Booth Replacement ProjectAddress: 2351OHighway99 During review of the plans for the above noted project, it was found that the following information, clarifications or changes are needed. Please provide written responses as to where the changes can be found on the plans, and submit revised plans/documents to a permit coordinator in the Development Services Department. General 1. Provide information regarding the spray product to be used as part of the spray coating process. It should include the 'use' and 'handling' specifics from the product manufacturer and the quantities to be stored on site, and address any other pertinent information required by IBC 414.1.3. This information is relevant in order to establish the correct occupancy group of the space and/or the facility as well as determine other code requirements. 2. Show on the plans the occupancy group(s) of the spray area and the overall facility as per IBC chapter 3. The response to comment #1 will factor in to the determination of the applicable occupancy groups. 3. Show on the plans the natural gas pipe sizes and lengths sufficient to review for proper sizing. Alternatively, indicate on the plans that gas piping will be under a separate permit. 4. indicate on the plans that the spraying equipment is interlocked with the ventilation system as required by International Mechanical Code 507.2.3. 1. Also lFC 2404.7. 1. 5. On sheets M-1 and M-2, Structural Note 4 states: "Anchorage specifications must be reviewed by licensed engineer familiar with the slab/foundation the equipment is being attached to." Please provide proper documentation of this review. 6. The alterations require accessibility upgrades for the building per WAC 51.50 (International Existing Building Code 410.7). On the plans, either a) clearly show that the interior accessible route of travel complies with current code, or b) provide upgrades per the previously referenced section. If you choose to use exception #1 of that section, provide a letter (reference the code exception), stating the overall project cost, 20% of the project cost, Page lof2 and list the accessibility upgrades that will be done as part of this permit as well as showing that the total cost of the upgrades is at least 20%. Show these features on the plans. For example, the valuation of the project as listed on the permit application is $100,000, 20% of which is $20,000. The code requires that in addition to your basic construction budget, a minimum of $20,000 must be spent on accessible upgrades unless the space fully complies with accessibility requirements of IEBC 410.7. Possible features that could be considered for upgrades might include accessible toilets and sinks, restroom grab bars, door sizes and approach space, etc. It appears on your plans that the existing restroorn does not meet current standards, and would be a likely candidate for upgrading. Thank you, Leif Bjorback, Building Official City of Edmonds (425) 771-0220 Leif.bjorbackkedmondswa.go Page 2 of 2