Loading...
2018-0342 Alpha Assisted Living Alteration.pdfOV EDAI 0 DATE: TO: FROM RE: City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 March 20, 2018 Third Place Design Cooperative Mark@thirdplacedesigncoop.com Eric Carter, Plans Examiner Plan Check: BLD2018-0342 Project Address: 8425 Bowdoin Way Scope: Interior remodel of assisted living Facility Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicatins! where the 'clouded' or otherwise highlij!hted chani!es can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 nd Floor of City Hall. Permit Center hours are M, T, THz, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. This building plan review cannot be completed until we receive the following items: General: Provide as part of a complete building permit application submittal stamped and sealed construction drawings prepared by a licensed architect registered to practice in the State of Washington per Revised Code of Washington (RCW) 18.08.410. The proposed project affects the life safety system of the structure due to the alteration to fire rated assemblies and openings. The drawings should incorporate the applicable responses to the plan review comments and/or the proposed methods of meeting compliance with applicable codes 2. In accordance with WAC 388-78A-2850, a review approval letter from the Construction Review Services of Washington State Department of Health. Provide as part of a complete building permit application submittal of a copy of the required District for the proposed project per the City of Edmonds. 3. A Residential Building Permit Application was filled out at the time of the original submittal. This project is being reviewed as an I- I and falls under the regulation of the IBC. As part of complete resubmittal, a commercial application will need to fill out in its entirety. A2.01: 4. Notes indicate the removal of existing lighting. Provide as part of the resubmittal, Washington State Energy Code (WSEC) Compliance Forms for Commercial Buildings. Areas that will have new fixtures installed are required to be indicated on the energy forms. 5. Notes indicate the removal of existing ceiling GWB and Lights, ETC. Included in the ETC will any alterations to existing heating, ventilation, or exhaust systems within the designated work areas? Please indicate the location of existing, new or relocated grilles, diffusers and if they communicate with the rated corridor on the plans. Fire/Smoke protection will be required if applicable in accordance with IBC 717. A 5.10: 6. Detail IA indicates a 2x4 stud wall with 5/8" type X GWB on both sides. The GWB attachment details are not identified. Furthermore; is the one hour assembly prescriptive as described in the 2015 IBC or a recognized listed assembly? If so please add the code reference or listing number to the plans in accordance with IBC 703.3 7. The plans indicate new smoke/co detectors to be installed. Our records indicate that this building currently has a fire alarm system. If these detectors are being added to the existing system, a separate permit will be required. Please clarify. A 7.00: 8. The door schedule and plans indicate the installation of 20 minute rated doors at the corridor. These doors also need to comply with the smoke and draft control requirements of IBC 716.5.3. Please indicate on the plans how these door assemblies will comply. This plan review is considered incomplete, additional comments may generated upon the second review. Please let me know if I can be of any additional assistance. Eric Carter Page 2 of 3 Page 3 of 3