Loading...
2018-0447 Edmonds Recovery Beck struc.pdfBeck & Associates, PLLC Structural Engineering & Code Consulting May 18, 2018 Leif Bjorback Building Official City of Edmonds 121 5t' Avenue North Edmonds, WA 98020-3145 Subject: Northpoint (Structural Review) Permit: BLD2018-0447 BLD2018-0448 Per your request, Beck & Associates has completed a structural review of the drawings and calculations for conformance with the 2015 International Building Code (IBC), as adopted and amended by the State of Washington and the City of Edmonds. Our review of the plans and calculations indicates that corrections are necessary prior to permit issuance. The applicant should address the following comments in itemized letter format in addition to making corrections & revisions to the drawings. Corrections and revisions to the drawing should be clouded so that they are clearly identifiable. General General 1) Shannon & Wilson, Inc. is required to provide a geotechnical review of the plans and specifications to determine that they are consistent with the recommendations. Shannon & Wilson, Inc. should summarize their review in a summary letter, providing any additional recommendations as needed. All recommendations are required to be addressed within the design drawings resubmitted for our review (p. 14 of 16) Analysis G ravity 2) Sections 2 & 4A, as indicated in the structural calculation Table of Contents, were not included in the structural calculations. Please submit these sections in response to this review letter. 3) Provide calculations or other documentation that demonstrates that the existing Level 2 structure can support the gravity loads as required for this project and as indicated on sheet S-0-21. 4) Provide calculations to demonstrate that the existing roof framing can support imposed loads from mechanical equipment and mechanical screening. 5) Provide calculations and detailing for lateral anchorage of all mechanical units. I ntorni 16425 SE 66 t h Street, Bellevue, WA 98006 * beckpllc@msn.com * PH: 206-313-3739 BLD18-0447 (Struct Rvw) May 18, 2018 Page 2 of 5 6) Vertical combinations of lateral resisting elements are required to be addressed in accordance with ASCE 7-10, 12.2.3.1.The upper system (plywood shear walls) is permitted to be designed using its own design coefficients (R, omega, Cd). The lower system (concrete shear walls) is required to be designed for its own coefficients (R, omega, Cd). Forces transferred from the upper system to the lower system are required to be increased by multiplying by the ratio of the higher response modification coefficient to the lower response modification coefficient. ASCE 7- 10, 12.2.3.1 a) Provide an analysis that is consistent with these requirements. b) Provide an analysis that demonstrates that the concrete shear walls are designed for their own appropriate design coefficients (R, omega, Cd). 7) This building meets the criteria of ASCE 7-10, 12.2.3.3 so the building with a horizontal combinations of resisting elements (plywood shear walls, concrete shear walls) may be designed using the least value of R for the different structural systems found in each independent line of resistance. This is for your information only. No response is required. ASCE 7-10, 12.2.3.3 8) Diaphragms and collector elements. a) The value of R used for design of the Level 2 diaphragm is required to be the least value of R for any of the systems (wood shear wall, concrete shear wall) used at that level and below. Update the analysis, design, and detailing accordingly. ASCE 7-10, 12.2.3.3 b) Collector elements and collector element connections to the concrete shear walls are required to be designed considering overstrength. Provide complete design of these collector elements. ASCE 7-10, 12.10.2.1 9) Reference page 17 of 117 of the submitted calculations. Seismic base shear does not appear to be based on all weight that is required to be considered for seismic load determinations. While the loading diagrams identify interior and exterior wall loads, these loads do not appear to have been included in the weight used for determination of seismic loads. All mass needs to be considered. ASCE 7-10, 12.7.2 10) Provide calculations to demonstrate that lateral boundary elements (HSS columns) are adequate to resist all imposed load combinations, including gravity (DL, LL, Snow) and seismic. 1605 Drawing Sheets S-001 — S-004 — General Structural Notes 11) Update the General Structural Notes. Overall, there is a lot of information that is not applicable to this project or that is incomplete. Update the Notes to the specifics of this project. 12) Update the Geotechnical Information section, consistent with and referencing the geotechnical report. 13) Under Design Loads, Snow, a reference is made to the City of Seattle. The authority having jurisdiction for this project is the City of Edmonds. Update the plans accordingly. 14) Update the Seismic information, consistent with the calculations provided. 15) Reference the Lateral Analysis Section. Special Concrete Shearwalls are identified at the 2nd Floor Level. a) Provide calculations or other documentation that demonstrates that the concrete shear walls do indeed meet the criteria to be special concrete shearwalls. Please be aware that ordinary reinforced concrete shear walls are not permitted to be used in Seismic Design Category D. ASCE 7-10, Table 12.2-1 16425 SF 66' Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 BLD18-0447 (Struct Rvw) May 18, 2018 Page 3 of 5 b) Specify the seismic response coefficient, Cs, for the special concrete shear walls. S-101 — Level 1 Framing Plan 16) Specify required diaphragm and diaphragm connection to supporting framing. S-102 — Level 2 FraminLy Plan 17) Specify required diaphragm and diaphragm connection to supporting framing. 18) Drag struts are called out at a couple of locations. However, information is missing. Specify the struts, connectors, and provide detailing for connection of the struts to the shearwalls. S-103 — Roof Framing Plan 19) Specify required diaphragm and diaphragm connection to supporting framing. 20) Shear wall SW-1 needs to be labeled on the plan. 21) Drag struts are called out at a couple of locations. However, information is missing. Specify the struts, connectors, and provide detailing for connection of the struts to the shearwalls. S-221 — Shearwall Elevations 22) Reference 1/S221 — SW-1 Elevation. Specify required straps above the openings as required by the calculations. 23) Reference 2/S221 — SW-2 Elevation. Specify required straps above the openings as required by the calculations. S-581 —Typical Wood Framing Details 24) Reference 6/S-581. a) Illustrate and specify all required connections from the shear wall to the concrete wall below. b) This detail needs to be called out on the plans where they apply. 25) Reference 7, 8, & 9/S-581. a) Illustrate and specify all required connections from the shear wall to the concrete wall below. b) These details need to be called out on the plans where they apply. If they are not applicable to this project, they should be removed from the drawing set. S-591 — Light Gage Steel General Notes Schedules and Framing Details 26) Reference details 12, 19, & 20/S-591. These details call out "sure -board." However, sure -board is not used on this project. Update the details accordingly. 27) Reference 16/S-591 — Light Gage Shear Wall Schedule. a) Reference the column "typ wall stud except at abutting panels." 33 mil material is specified. However, 43 mil (18 GA) material is required per the Simpson catalog in order to achieve the required shear wall values. Please revise. 16425 SF 66' Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 BLD18-0447 (Struct Rvw) May 18, 2018 Page 4 of 5 b) Reference the columns "panel edge screws" and panel field screws." Screws are identified by number (Ex: #10, not 10d). The designations need to be updated. Furthermore, the specific screws for which this project is designed should be specified (Simpson #10 CBSDA fasteners) for connection of sheathing to the light -gage steel. Update the schedule accordingly. c) Reference the column "fasten top track to framing above." i) Provide documentation (from Simpson) of the acceptability of using Simpson A35 clips to connect light -gage steel to wood. Specify required fasteners (screws to the light -gage steel and screws/nails to the wood). ii) Provide calculations to demonstrate the A35s and fasteners are adequate for the imposed loads. d) Reference the column "bottom track attachment" "anchorage to concrete." Y2" DIA x 4" Titen HD anchors are required at 12" o.c. in order to transfer imposed forces (per calculations). Please revise. e) Reference the column "bottom track attachment" "bottom track." 54 mil bottom tracks are specified. However, detail 18/S-591 requires 68 mil bottom tracks. Provide coordination. f) Reference the Notes. Note #5 provides specifications for nails. However, screws are used for these shear walls. Provide specifications for the required screws. S-592 — Light Gage Steel Framing Details 28) Reference detail 5/S-592. This detail needs to be called out on the plans. 29) Reference detail 6/S-592. This detail is not applicable and should therefore be removed from the drawing set. 30) Reference detail 10/S-592. Illustrate and identify all connectors for shear transfer to the concrete shear wall. 31) Reference detail 16/S-592 —Typical Elevation of Shearwall with Holdown Straps. a) "Solid bIkg to match width of post above" is specified between HSS holdowns. Provide calculations to demonstrate that this adequately transfers compression loads in all cases. Revise the detail as necessary to illustrate actual conditions. b) Double holdowns are specified on the shear wall elevations in all cases. The detail needs to be updated to reflect these conditions. 32) Reference 13/S-592. This detail is not applicable (never are holdown straps called out on the plans) and should therefore be removed from the drawing set. 33) Reference 18/S-592 —Typical Holdown at Base. a) Double holdowns are specified on the shear wall elevations in all cases. The detail needs to be updated to reflect these conditions. b) Specify required embedment of holdown anchors. This does not appear to be provided anywhere in the drawing set. S-721 — Steel Canopy and Stair Details 34) Reference 6/S-721 — South Canopy Detail. a) Provide an analysis for all elements of this canopy, including the foundation. 16425 SF 66' Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739 BLD18-0447 (Struct Rvw) May 18, 2018 Page 5 of 5 b) The required axial strength of cantilever column elements, considering only the load combinations that include seismic load effects, is required to not exceed 15% of the available axial strength, including slenderness effects. Provide an analysis to demonstrate that this criteria is met. ASCE 7-10, 12.2.5.2 c) Foundations used to provide overturning resistance at the base of cantilever column elements are required to be designed to resist the seismic load effects including overstrength factor of Section 12.4.3. Provide an analysis to demonstrate that this criteria is met. ASCE 7-10, 12.2.5.2 d) We assume the columns will be designed and analyzed as ordinary cantilever columns (R=1.25; overstrength = 1.25; Cd = 1.25). If they will be designed as special cantilever columns, all the requirements for special detailing (AISC 341-10) will need to be met. AISC 341-10 35) Reference 16/S-721 — East Canopy Detail. a) Provide an analysis for the foundation. b) The required axial strength of cantilever column elements, considering only the load combinations that include seismic load effects, is required to not exceed 15% of the available axial strength, including slenderness effects. Provide an analysis to demonstrate that this criteria is met. ASCE 7-10, 12.2.S.2 c) Foundations used to provide overturning resistance at the base of cantilever column elements are required to be designed to resist the seismic load effects including overstrength factor of Section 12.4.3. Provide an analysis to demonstrate that this criteria is met. ASCE 7-10, 12.2.5.2 d) We assume the columns will be designed and analyzed as ordinary cantilever columns (R=1.25; overstrength = 1.25; Cd = 1.25). If they will be designed as special cantilever columns, all the requirements for special detailing (AISC 341-10) will need to be met. AISC 341-10 S-731 — Mech Screen & Misc Roof Details 36) Reference 6 & 8/S-731 — Mechanical Screening. Specify the maximum spacing of vertical posts that connect to the roof structure. 37) Reference 9/S-731 — Mechanical Screen Post Base Plate. a) Specify the weld of the post to the base plate. b) Given the load on the posts (M=134 k-in, ASID, per calcs), it is clear that the connections to the wood framing and of the wood framing to resist the loads are inadequate. Provide an analysis and complete design for these resisting elements, including addressing fall protection forces. 38) Reference 11/S-731 — Typ Fall Protection Anchor. Provide a complete analysis and detailing/specs for the anchor and its connection to the wood framing below. 39) Reference 13/S-731 — Screen Wall Details. Specify all elements, including angles, bolts, etc. Please contact me should you have any questions. Respectfully, Douglas Beck, PE, SE Beck & Associates, PLLC 16425 SF 66' Street, Bellevue, WA 98006 . beckpllc@msn.com - PH: 206-313-3739