FIELD REPORT
Cascadian Apartments
Project:
Underpinning
Client:
Jeff SterlinL,.
9405 Edmonds Way; Edmonds,
Location:
WA
Weather:
Sunm-; 30's
Purpose
of Visit:
Construction Monitorin.4
FileNo.: 9879B-17
Date, 12/20/17
Report No.: I
Page: 1 of 2
By: EAF
NGA went to the site at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arriving on site, we met with Howard Clark, to discuss the objective of the day. The contractor planned to
install multiple pin piles, across the exterior of the building, before the contractor continued to install brackets and
prepare the site to proceed with the installation of pin piles.
The contractor used a 140-pound hammer and a 2-inch diameter, 5 foot 3 inch long, steel pin pile, which was
driven through an opening within the bracket. Upon completing the installation of the pin pile, the brackets will
be secured and used to support the existing foundation.
We observed the contractor install the following piles, identified per their label according to the plans:
Pin Pile ID Embedded Depth
1 13
4 15
8 15
14 15
20* 10
23* 5
* Encountered an obstacle during installation and did not meet refusal. It was
recommended that the pile be relocated to avoid the obstacle.
We will continue to monitor the site on a part-time basis, and are available for additional consultation if
requested.
Attachment: Site Plan Signed:
Distribution: Eric A. Finley
— f A I —
)VIDE FOOnW MAIN,
UAIL W3.1, ROM TO
tTE DISCHARGE SYSTEM
KEEP FAST SLAB AND FAST
p
S LIFT AS NEEDED 3
FIREPLACE
7
9L 01
3 4.4 1.. 1* §1 '
I A&
7
T
.9 40C.
;5 0 Ir 06
opt
%T
VI
-UNIT i02
I
41
@
14 4.
a
---------------
t
-.7
At
r .41 M
4 1
6
7
4'W _V 4--a'
10 W-W 31-W
K I ! 4�t
BUSTING 1�
Cascadian Apartments Underpinning
NGA File No. 98791317 FR# -L pg,. z/ -L /20 C7
Note: Not to scale, all drawings are approximate
FIELD REPORT
NELSON
Project:
Cascadian Apartments
File NQ: 9879B17
GEOTECHNICAL
Underpinning
ASSOCIATES, INC
Client:
Jeff and Lisa Sterling
Date: 12/21/2017
Location:
9405 Edmonds Way
Report No: 02
17311 - 13511 Ave. NE #A-500
Weather:
Overcast, 32T
Page 1 of 2
Woodinville, WA 98072
Purpose of
Construction Monitoring
By: CTC
(425)486-1669 FAX481-2510
Visit:
We visited the site today at the request of Mr. and Mrs. Jeff and Lisa Sterling to provide geotechnical
consultation and monitoring services for the Cascadian Apartments foundation underpinning project,
located at 9405 Edmonds Way in Edmonds, Washington.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC.
The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot
lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a
140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty
seconds of continuous driving. Pin piles observed to be installed today were driven to a dead stop at one
inch or less of vertical movement in 300 seconds of continuous driving. The depths to refusal and
corresponding pile numbers are listed in the table below. The depths are measured from the top of the
structural bracket placed at the base of the foundation footing.
Pin Pfle Number Embedment Depth
I feet)
38* 6.7
27 11.6
33 12.7
30*
31*
80
5
Piles 3 8, 30, and 31 met refusal at depths less than 10 feet below the foundation, and were interpreted to
have been obstructed. We recommended the underpinning contractors confirm relocation plans, or other
method to reach refusal in native soils, with the structural engineer, per provided plans.
We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions
are based on specific observations made while on site. It is our opinion that the pin piles we observed
today were installed in accordance with the project plans and should support the planned loads.
We understand that the contractors will continue to drive exterior piles the next business day, and will
continue to monitor the installation of underpinning at the site.
Attachment: Site Plan
Signed:
Distribution: Carston T. Curd, GIT
Af—
K--�,� OM MAE AM
J;P ^a 11,
41
—77
1 4�,
A-1
Jr
11-C i
A
T-C
�iLt4 ms j-VL I Izd
I
A.4
6('�Lvd
7
Ana
o'
46
Cascadian A artments Underpinning
NGA File No. 9� pg: - / �
791317 FR#oa� 01% ON IM4
Note: Not to scale, all drawings are approximate
12,
AYI --'.
. -
�11 af
NELSON
GEOTECHNICAL
ASSOCIATES, INC.
17311 — 135th Avenue NE # A-500
Woodinville, WA 98072
V: (425) 486-1669
F: (425) 481-25 10
FIELD REPORT
Cascadian Apartments
Project: Underpinning
Client: -Jeff St�r
9405 Edmonds Way; Edmonds,
Location: WA
Weather: Overcast; 30's
Purpose
of Visit: Construction Monitoring
FileNo.: 9879B-17
Date: 12/22/17
Report No.: 3
Page: I of 2
By: EAF
NGA went to the site at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arriving on site, we met with Wes and Eric, the contractors, to discuss the objective of the day. The
contractor planned to install multiple pin piles, across the exterior of the building, before the contractor continued
to install brackets and prepare the site to proceed with the installation of pin piles.
The contractor used a 140-pound hammer and a 2-inch diameter, 5 foot 3 inch long, steel pin pile, which was
driven through an opening within the bracket. Upon completing the installation of the pin pile, the brackets will
be secured and used to support the existing foundation.
We observed the contractor install the following piles, identified per their label according to the plans:
Pin Pile ID Embedded Depth
2 is
79 15
81 15
The contractor will continue installing pin piles following the holidays, starting again on January 2, 2018.
We will continue to monitor the site on a part-time basis, and are available for additional consultation if
requested.
Attachment: Site Plan
Distribution:
Signed:
Eric A. Finley
)VIDE FOOTING DRAIN, I � I
IEML 9/S3.1. ROUTE To ' �U4
XE DUMRGE sysm d
4'-D'
I 14�i -1� ;4
KEEP EXISTSLAH ANu EMST
LFTASNEEDED Zp FIREPLACE
W-W
4'-fY' 4q .4
j
7
L .41 -7-==]
A
b
VS.@ V.00 15 �r 00
4' _'Y' 2'
f
16
L
RNEr _1K 141 0-4 V.
Ldt
47"
@ @
I.
46
4'4
@
0
�4 4'-G* 3'
7= W__4
C
Ir
ExsnNe
Cascadian A artments Underpinning
NGA File No. 99791317 FR#; pg: Z I?/ zz /20 17
Note: Not to scale, all drawings are approximate
FIELD REPORT
NELSON Cascadian Apartments
GEOTECHNICAL Project: Unde4)irmin FileNo.: 987913-17
ASSOCIATES, INC. Client: Jeff Sterlinj� Date: 1/3/18
17311 — 135th Avenue NE # A-500 9405 Edmonds Way; Edmonds,
Woodinville, WA 98072 Location: WA Report No.: 4
V: (425) 486-1669 Weather: Clear; 30's Page: I of 2
F: (425)481-2510 Purpose
of Visit: Construction Monitoring
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the central portion of the complex
Upon arriving to the site, we met with the pile contractors to discuss the objective of the day. The contractor
planned to install multiple pin piles, across the exterior of the building. Additionally, the contractors plan to install
brackets and prepare the other pile locations to proceed with the installation of pin piles.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The
pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and
connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound
pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of
continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or
less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile
numbers are listed in the table below, The depths are measured from the top of the foundation footing.
We observed the contractor install the following piles, identified per their label according to the plans:
Pin Pile ID
28
**30
**31
Embedded Depth
14.2
6.9
6.25
**35 4.75
**38 6
39 12
**41 r2
r42 10.25
"Piles 30, 31, 35, 38, and 41 appeared to meet early refusal on obstruction.
Many of the piles driven today noted above appeared to meet refusal at a relatively shallow depth on obstructions.
We understand that these piles will be addressed at a later time to determine the best approach the observed
shallow refusal. The remaining piles that did not refuse on obstructions appear to have been suitably installed and
should support the planned loads.
We will continue to monitor the site on a part-time basis, and are available for additional consultation if
requested.
Attachment: Site Plan Signed:
Distribution: A,5fz—
S-tT-t NAN
157&7 8 7
DA-Tf-
'PA"
SWONGUDEWINO
ir oc FA wAr
@tWvrAmxEft4a
0 fitu fv&U(Lf-A +Z�"
0 flui MooAVA f�d" ow(,i. afr"�- �o i-o-o-r, k,&,,
6bstmf'+Cd% a+ �;4A.&W gfil"
ImMmunom VaywaL
PlA4eOno,--' -77, OWCOWN=
ir-r
SWOKUPPOLAa
11141
ROMM
- - - --
4 �.
Dwc[wcRmw/ww
AND R&LAa
DWCCWMos
PSM(MURAM
%W
Eksm ryp
04. 4%M
114 ---L i f
AL
4LL
It------
Can
L
r
-546�4
14
al 'b
A
r
ywr f.
Flu,
PA 1SMAW "r .3
,om
vm*,e core, L I
A
P 4
4!
M.
74
T.: b
is i
4 nw
ru^"Mc WAL
=iell-.
FIELD REPORT
NELSON
Cascadian Apartments
GEOTECHNICAL
Project:
Vjj�ing
FileNo.:
987913-17
ASSOCIATES, INC.
Client:
Jeff Sterliniz
Date:
1/4/18
17311 — 135th Avenue NE # A-500
_94_05H_m� �ds Way; Edmonds,
Woodinville, WA 98072
Location:
WA
Report No.:
5
V: (425) 486-1669
Weather:
Clear; 30's
Page:
I of 2
F: (425)481-2510
Purpose
I
of Visit:
Construction Monitoring
By:
ABR
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support
the existing foundation on the central portion of the complex.
Upon arriving to the site, we met with the pile contractors to discuss the objective of the day. The contractor planned to
install multiple pin piles, across the exterior of the building and begin install on the interior. Additionally, the contractors plan
to install brackets and prepare the other pile locations to proceed with the installation of pin piles.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles
consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel
internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal
criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed
today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving.
The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of
the foundation
We observed the contractor install the following piles, identified per their label according to the plans:
Pin Pile ID Embedded Depth
A 12.75
B 1 12.5
C 13.75
36 1 11.75
37 10.75
**41 15-1-7
*Piles A, B, and C are 'temporary' screw -jack piles, added after overall pile layout was designed.
"Pile 41 appeared to meet refusal on an obstruction.
Many of the piles driven today noted above appeared to meet refusal at a relatively shallow depth on obstructions. We
understand that these piles will be addressed at a later time to determine the best approach the observed shallow refusal. The
remaining piles that did not refuse on obstructions appear to have been suitably installed and should support the planned
loads. We will continue to monitor the site on a part-time basis, and are available for additional consultation if
requested. We will continue to monitor the site on a part-time basis, and are available for additional consultation
if requested.
Attachment: Site Plan Signed:
e
Distribution: miw
Sirt-pl,w 0
157q 8 t7
7'��J vvl-i&4 Aef4a` -ib 4-A&C
DA-TV n" SAA'UeAAI 6#lj,14W.
144pc
INRLTRATICH U97WELL
PERGEOTEM MgrOMCPATIO
RfhKhT AND PERACE
EXIST PATIO W/ NEW V ir-r
SW ON GRADE W/ ?A I.
wwwo
FVAOVtAkDmitAa VWFWNDA--MWI
IDWCUWXASW/kEW IDWCOWSLAJI
1 6. SL" Ch CUM WjrMjCr"
rn, w
4'
VERIFY/ROWDE F"WiNG DRAW,
REPENTODETAL943.LactmiD
APPROPRAIE DISCIIARGE SMTtM
REMOVE AND KPLACE
FMSTCO"CSMWfPiEW FIN I "L,,ACvF, 'S'
G'SLARONGRADE
..r 04r --v
vl-
-A'
J.
'74 4'
A—
L
A
A. 44 1 L
In
IT r
A
P'Om 'G
54, qf�tomo,;: m
L
too
Ji '. .. - �11 - p 9
4 41 147
j
7-
%7' 3w-
4--r IV-7 - a).- I A - I % f
7EMPORAR, PILE,, TW V-w -r-w
VOL,
4
r
FIELD REPORT
NELSON Project: Cascadian Apartments Underpinning File No: 9879B17
GEOTECHNICAL Client: Jeff and Lisa Sterling Date: 1/5/2018
ASSOCIATES, INC Location: 9405 Edmonds Way Report No: 06
17311 - 135th Ave. NE #A-500 Weather: Rain, 51 IF Page 1 of 2
Woodinville, WA 98072 Purpose of Construction Monitoring By: CTC
(425)486-1669 FAX481-2510 Visit:
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arriving to the site, we met with the pile contractors to discuss the objective of the day. The contractors
continued the underpinning installation within the subject building.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The
pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and
connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound
pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of
continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or
less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile
numbers are listed in the table below. The depths are measured from the top of the foundation.
Pin Pile ID Embedment Depth Ift)
*45 10.5
46 12.6
47 12.1
9.8--
52 13,6
*5 4 7.1
96 12.4
87 7.2
D 15.8
E 14.6
F 14.9
*Piles 45, 49, and 54 appeared to meet refusal on an obstruction.
Piles D, E, and F are 'temporary' screw -jack piles, added after overall pile layout was designed.
Many of the piles driven today noted above appeared to meet refusal at a relatively shallow depth on obstructions. We
understand that these piles will be addressed at a later time to determine the best approach the observed shallow refusal. The
remaining piles that did not refuse on obstructions appear to have been suitably installed and should support the planned
loads.
We will continue to monitor the site on a part-time basis, and are available for additional consultation if
requested. We will continue to inoni(oi the site on a part-time basis, and are available for additional consultation
if requested.
Attachment: Site Plan Signed:
Distribution:
SITt PLAN
I�ff413 V7
DA-Tt,-,
lh
C-
INFILTRATION DRYWELL
PER GEMCH
EUSTCONCPATIO
ir-r
POAOW AND MPL44M
s VW=KSLA&wJw-w
MD
OUT CON, 5,A3
Cn"ONCRW
wIV 3�Rucr
I..
ENWO Tyr
J�71 A'&
�4'
4-
0-
REMOVIANDaEPLACE r4r
;-b
4 EICST CWC SLAM wi NEW cp
6� !RAS ON GRADE
4r.V
W-W 11V
%
74,
J
A C
FMRG "Iv
CONO, Pf da
22
r
z
o� - lift
CZil.O
NELSON
GEOTECHNICAL
ASSOCIATES, INC.
17311 — 135th Avenue NE # A-500
Woodinville, WA 98072
FIELD REPORT
Cascadian Apartments
Project: Underpinning
Client: Jef�§tSl n
9405 Edmonds Way; Edmonds,
Location: WA
FileNo.: 987913-17
Date: 1/8/18
Report No.: 7
V: (425) 486-1669 Weather: Overcast; 50's Page: I of 2—
F: (425)481-2510 Purpose
of Visit: Construction Monitoring By: ABR
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the central portion of the complex.
Upon arriving to the site, we met with the pile contractors to discuss the objective of the day. The contractors
continued the underpinning installation within the subject building.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The
pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and
connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound
pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of
continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or
less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile
numbers are listed in the table below. The depths are measured from the top of the foundation footing.
We observed the contractor install the following piles, identified per their label according to the plans:
Pin Pile ID
Embedded Depth (ft)
J 48
11.75
*50
9.00
*51
8.10
*53
6.00
G
12.5
_77-
78
10.5
11.5
6.50
87 (redriven)
*Piles 50, 5 1, and 53 appeared to meet refusal on an obstruction.
Pile G is a 'temporary' screw -jack pile, added after overall pile layout was designed.
Many of the piles driven today noted above appeared to meet reftisal at a relatively shallow depth on obstructions.
We understand that these piles will be addressed at a later time to determine the best approach the observed
shallow refusal. The remaining piles that did not refuse on obstructions appear to have been suitably installed and
should support the planned loads.
We will continue to monitor the site on a part-time basis, and are available for additional consultation if
requested.
Attachment: Site Plan
Distribution:
Signed:
� AI-7
cj'2_ IW-
5IT-t NAIV
WqS V7
DA-Tv 11,612A-tir
M?Urcm Mww
OTS tuaww'm
M7-Mj*E_
mr2w
mmmawl"wookRa
ftvwL'MFx-tAm
EMS-,Mcwtwws*
IrOCEAWAY
A
COWMAM"Mm V-w I-4r
oWCMCx"W/mRv EM
F R" Ok MWE R"Ma
r
( . * r
OF_
4'
4b4i
vt
() P)IU
0
i �Swtui h d44_1
jhsj'aL'w Y�dafl wkie_� &rpeAv �o
ou'� r_q� At C'A s kjpjf-A-�; o N III,- wcv_�o .
VT
Ira,
f4%MWtAPdDAEftACE
5 DweannowINEW
WAM APO WtM )"W
OWCOPKSL40 SWPWmw4p&CMN
I V 9AS ON GMM
4'. 4.4. 4w 4!
4
A
..... cc
I . '.. tl:7_-:lfj. .. - . ;.' ." -1- 1 - "' r
umm""RLmro
Dorm
mu�m%%u
-VEnGATE B�G
X
FounNG &VEWFVC%V7ION
.6
Pl
A
FILLD REPORT
NELSON
Cascadian Apartments
GEOTECHNICAL
Project:
-Underpinning
FileNo.:
9879B-17
ASSOCIATES, INC.
Client:
Jeff Sterling
Date:
1/10/17
17311 — 135th Avenue NE # A-500
9405 Edmonds
Woodinville, WA 98072
Location:
_WA
Report No.:
8
V: (425) 486-1669
Weather:
Overcast; 40's
Page:
I of I
F: (425) 481-2510
Purpose
of Visit:
Construction Monitoring
By:
DPN
NGA went to the site at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arriving to the site, we met with the pile contractors to discuss the ob ective of the day. The contractors
j
continued the underpinning installation within the subject building. They drove approximately 10 feet of Pile #71
when their compressor malfunctioned. After several attempts of trying to fix it they decided to wait until
tomorrow to continue driving.
We will continue to monitor the site on a part-time basis, and are available for additional consultation if
requested.
Attachment:
Distribution:
Signe(l.'
NELSON
GEOTECHNICAL
ASSOCIATES, INC
17311 - 135" Ave. NE #A-500
FIELD REPORT
Proj ect:
Client:
Location
Weather:
Woodinville, WA 98072 Purpose of
(425)486-1669 FAX481-2510 Visit:
CascadianApartments Underpinning FileNo:9879BI7
Jeff and Lisa Sterling
9405 Edmonds Way
Rain, 46'F
Construction Monitoring
Date: 1/ 11/2018
Report No: 09
Page I of 2
By: EAF/CTC
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arrival to the site we inet with underpinning contractors from Advanced Foundation Stipports, LLC. The
pin piles consisted of i-incl) dianicter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and
connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound
pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of
continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or
less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile
numbers are listed in the table below. Ile depths are measured from the top of the foundation footing. The piles
driven observed installed today appear to have been suitably installed and should support the planned loads.
Pin Pile ID Embedment Depth (ft)
- 34
8.7_
71
13.5
72
8.9
73
9.1
74
11.9
75
11.2
76 6.9
- 88
__91
--7.3
1111 —
12.7
— 92
95
8.9
We have been providing monitoring of pile installation on a full-time basis. Our fmdings and conclusions are
based on specific observations made while on site.
We understand that the contractors will continue to drive exterior piles the next business day, and will continue to
monitor the installation of underpinning at the site.
Attachment: Site Plan
Distribution:
�/ Al
Signed: Z__
sm-t NA-tv
If*8 V7
FjL*4 O�
DA-Tt'. llllll�
VERIFY/PROMDE F=lP4G DRAIN,
RMR TO OFTAP ML POJM M
APPACIPRIATE DISCHARGE SYSM
ROAME AND REPLACE
M7CDNCSLAGWjNEW
6* SLAB 04 GRADE
zl� INFILTUTUR Dgr*M
PER GCOTECH
r4r T4r
vm
nunaa
4Ar 4'-(r
.41
vw,
41:
upir 3d
WWAUDMiRG
VIUMV cow
L�
A
—WPORARYFlLMTYP
/�N �Z A44,Aj
EXW CONC PAM
IJWCE 10*
ItAh 0 MUSAS REQIjqRW
iy.r
RIMAMANOItEft4a
awcamcnaw/kc.
a-ca RWm
W St:RM
—7-1�
Or SM ON GRADE
4'0
ImAr ,
7
.A
I—F a
roe ji. . - -, i.. ... I. . -
( —jo
AL
A 1:
ccSTW
Pt�Ma WALL
MvEmmme v=nNG
FOOTOG & NOTIM COMMK
-AL
4
FIELD REPORT
NELSON
Project:
Cascadian Apartments Underpinning
File No: 9879B 17
GEOTECHNICAL
Client:
Jeff and Lisa Sterling
Date: 1/12/2018
ASSOCIATES, INC
Location:
9405 Edmonds Way
Report No: 10
17311 - 135h Avc. NE #A-500
Weather:
Overcast, 40's
Page I of 2
Woodinville, WA 98072
Purpose of
(425)486-1669 FAX481-2510
Visit:
Construction Monitoring
By: DPN
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The
pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and
connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound
pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of
continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or
less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile
numbers are listed in the table below. The depths are measured from the top of the foundation footing. The piles
driven observed installed today appear to have been suitably installed and should support the planned loads.
Pin Pile ID
LEmbedment Depth (ft)
79
E 15.7-
82-1
3.7
84
14.9
89
6.8
90
14.8
94
10.5
14.6
97
We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are
based on specific observations made while on site. We will continue to monitor the installation of underpinning at
the site.
Attachment: Site Plan
Distribution:
Signed:
,FofZ- DN
1574 8 t-7
r—PL*-: 10
DATC: 'Ivz1l5
1>*4c -. y?_
IT. W/ NEW G'
--GRADEw/m4@
32-OCEAWAY4
VIRIfy/PRCVIDEFOCYTING DRAIN,
REFERTODErAIL51/53.1-ROMM
APPROPRIATE DISCHARGE SYSTEM
EIIST CONC PATIO
.1. 2L
DOWEI &EPDXY REINF th
-XP & 4" WIT. oltul 7-
I�IEMOVE,.-D RE—C, PIMOVE A.40 REPLACE f EXIST FOLINDAT10M W/
EXIST . SLA13 EXISTCOKCSLAB
,I,� IN =ON SET
GRAD W/6' STALIC1 SLAB
D* Ty
4-W
r
i--- r1l
Li
4
FIRE rLACTE
.4
In
r oc.
.0c
4
-4r 4 1
71
_j
2A
TLI
l?
lip.
9
J .4
qz
4
r
'Del
. Lt�
so
EXISTING
PWMBING WALL
'rwi—srIGAW EXISTING
FOOTING & VERIFY COrOTION
WFILTRATION DAYVIELL
NELSON
GEOTECHNICAL
ASSOCIATES, rNC
FIELD REPORT
Proj ect: Cascadian Apartments Underpinning FileNo:9879BI7
Client: Jeff and Lisa Sterling
Location: 9405 Edmonds Way
17311 - 1350'Ave. NE #A-500 Weather:
Woodinville, WA 98072 Purpose of
(425)486-1669 FAX481-2510 Visit:
Overcast, 50's
Construction Monitoring
Date: 1/15/2018
Report No: I I
Page I of 2
By-, DPN
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The
pin piles consisted of 2-inch diameter ' schedule 80, galvanized steel, which were cut into 5.3-foot lengths and
connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound
pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of
continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or
less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile
numbers are listed in the table below. 'Me depths are measured from the top of the foundation footing. The piles
driven observed installed today appear to have been suitably installed and should support the planned loads.
Pin Pile ID
Embedment Depth (ft)
7
15.2
8
14.1
9
15.0
10
15.0
11
15.1
12
15.0
13
14.9
15
85
15.4
15.7
14.9
Howard Clark and Jeff Sterling decided to remove Pile #14 from the plans due to underground conduits found
during excavation for the pile.
We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are
based on specific observations made while on site. We will continue to monitor the installation of underpinning at
the site.
Attachment: Site Plan
Distribution:
Signed:
5n-t Plw
q*Tq 8 V7
r-IL*.. I (
DA-Tt'.
T%W, L/2-
Zt, JNRLPATrONDRYWELL_,,,�
PER GEDTEC34
MMST MUC PATIO
&WMXILWAUZOATIO
REMOVEAWMEPtACI
EXSrPATloYWMWF LIW*
rAWMWRMWfkEW COSTcowsi.4
SLANORGuawfolf LKWIN1111,11111110
EA WAY tOADWAADRV%AQ UMM AND RVUa
L V*gjsakGkmx WtV STFUCT W
g,/,W IV
vuM/pw,oF P00W ftuK 4'
ADAUK AND NVUa r-r t
nwooMMMWIMCW am
st" am GRAW
S�
ro
4'-V C4r 4'.W
—.,M6
L ; 43
Ak
oil A.
t
I f -T"
A^
L 1.
#A
j1U*V4ko
r .
- . * , ; " ..
? *
C4
"I - "-� , c * 41 , . - 4. � -3� 'I
WY Coma, jo
Jj
j
P-1
TDAPOx4.wPetMTTP, 9-M 4w r,.
I'LLMOUNG WALL
MVCMSATE CWMG
*DGTM&MJFVCOt&rnom
A3,
.4-
NELSON
GEOTECHNICAL
ASSOCIATES, INC
17311 - 1351 Ave. NE #A-500
FIELD REPORT
Project: Cascadian Apartments Underpinning FileNo:9879B17
Client:
Location:
Weather
Woodinville, WA 98072 Purpose of
(425)486-1669 FAX481-2510 Visit:
Jeff and Lisa Sterling Date: 1/17/2018
9405 Edmonds Way Report No: 12
Rain, 50's Page I of 2
Construction Monitoring By: EAF
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin
piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected
with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver
to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles
observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60
seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below.
The depths are measured from the top of the foundation footing. The piles driven observed installed today appear
to have been suitably installed and should support the planned loads.
Pin Pile ID Embedment Depth (ft)
89 __10.4
Temp- 15.6
bed/bath i
Temp- 10.2
Temp-bed/bath and Temp-Laundry/bath were installed beneath interior walls to install permanent screws and to
stabilize the interior walls separating the rooms of apartment 102.
We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are based
on specific observations made while on site. We will continue to monitor the installation of underpinning at the site.
Attachment: Site Plan
Distribution:
Signed:
r
-5n—t P&OV
IV7cr 8 t7
DA-T f,
ZA\, WMTRATXM[WrAML
I
PER GMTECtf
VMTCONCPkTIO
SUB MES A$ KOMO
-!
.tr.r
'14
WwWWANDRU"a
vwcmcmmw/sfew
rsma""W
WO
OW COW UAS
WIV 57%tX7 SW
mww-.O
cwR"Da=*/
sposo" sa-V a v mm
vom,"Mu FOOTM MAIN,
REPM TO DET"rA'- ROLnEiu
A PPRMlATED[SDMGFSvMw
4-.D-
P
AM.
RFUM AM REPIACE V4r j
-a wl New
VSLABONGRADE RREPLAM -
4w c4r
.r
I.- d
?A 41
ow A
LIP
Ll
ILI J-0 I
4'� rrl
n
1� W*An 1.3�aC
FOOTIRG i �ER-�y aM
42
% I - i I J . . , :: '- f.
6 A[ t
Q,— J
ft�� WAU
FIELD REPORT
NELSON
Project:
Cascadian Apartments Underpinning
FileNo:9879BI7
GEOTECHNICAL
Client:
Jeff and Lisa Sterling
Date: 1/19/2018
ASSOCIATES, INC
Location:
9405 Edmonds Way
Report No: 13
17311 - 1350'Ave. NE #A-500
Weather:
Rain, 50's
Page I of 2
Woodinville, WA 98072 Purpose of Construction Monitoring By: EAF
(425) 486-1669 FAX 481-2510 Visit:
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to
support the existing foundation on the northern side of the complex.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The
pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 53-foot lengths and
connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound
pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of
continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or
less of vertical movement in 60 seconds of continuous driving, The depths to refusal and corresponding pile
numbers are listed in the table below. The depths are measured from the top of the foundation footing. The piles
driven observed installed today appear to have been suitably installed and should support the planned loads.
Pin Pile ID Embedment Depth (ft)
16
17�
�-4-
26
25
82
83
23
21
19
20
22
24
15.6
15.5
15.6
10.4
10.4
15.5
10.3
15.6
10.4
10.3
15.6
10.4
15.5
10.3
We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are
based on specific observations made while on site. We will continue to monitor the installation of underpinning at
the site.
Attachment: Site Plan
Distribution:
Signed:
Z
5IT-t Plw
107OV7
r-p-if'.
DA-TE'.
OaST WOO wtmwr
$W ON CRAM W/ M 9
12'OCEAWAv
WPJFYIMOWW Poor-WG OFA, ,
A'le
L3�,
PER GECITUM
ONT COW PA710
SAWCLrr & WALCE PAnO
SlMVPlu5ASAWWREc
AND FVLACE
MAME
C=Wwnmw/h!*
Ah
E,QST COXC 0 "MACE
VVAM ON rAmx
STKLC-
SLAD
nato
4'
.thxh2
O=TM0fCUA&W/lMW
CSLADONGK40C V .1�
- n, -
-7 V&
%
r
3h
—7
4
4S.0 A"
is Or CO o4arc't,
1.vl
b
4-1
l 4*
d
FOOT?-< 10 . 3
J
16
T
TDAPORARvftjMTVp 'r.T r-V e
r-cr 3..(r
PLum@mvAkL L3 5
I-M-MGATE Cam.
NELSON
GEOTECHNICAL
ASSOCIATES, INC
FIELD REPORT
Project: CascadianApartmentsUnderpinning FileNo:9879BI7
Client:
Location:
17311 - 135" Ave. NE #A-500 Weather:
Woodinville, WA 98072 Purpose of
(425)486-1669 FAX481-2510 Visit:
Jeff and Lisa Sterling Date: 2/l/2018
9405 Edmonds Way Report No: 14
Partly Cloudy, 53'F Page I of 2
Construction Monitoring By: ABR
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation and redriving
of pin piles to support the existing foundation on the northern side of the complex.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The
pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and
connected with steel internal slip couplers. The replacement piles were moved laterally from the original location
and redriven. We monitored as the replacement pin piles were driven with a 140-pound pneumatic post -driver to
a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles
observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in
60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table
below. The depths are measured from the top of the foundation footing where present. The piles driven observed
installed today appear to have been suitably installed and should support the planned loads.
Pin Pile ID
Embedment Depth (ft)
49
9.3
� -8
12.25
7.5
35
12.3
28
7.25
30
31
8.5
54
9.3
Piles 45, 50, and 182 all met obstructions at shallow depths. The contractor will try and redrive these piles
tomorrow
We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are
based on specific observations made while on site. We will continue to monitor the installation of underpinning at
the site.
Attaclunent: Site Plan
Distribution:
Signed-
wv
sr-,
3n!
D
7 -1 P
IL
r I
77
F via
.1-3 j
A" VIWQ
"OLY.&NUISC13
Avon
OUVOMWM Lnymn -
MV4 2w:l
ism Fm, 9 Vld
nimmmnummo � w
CIO,
A*ft7(3
gUW '*AO-31—
li-
NELSON
GEOTECI-INICAL
ASSOCIATES, fNC
17311 - 135"' Ave. NE 4A-500
FIELD REPORT
Proj ect: CaseadianApart.me:n.tstliiderpinn.ijig File No: 98791317
Client:
Location:
Weather;
Woodinville., WA 98072 Purpose of
(425)486-1669 FAX481-2510 Visit:
Jeff and Lisa Sterling
Date: 2/2/2018
9405 Edmonds Way
Report No: 15
Partly Cloudy, 53T
Page I of 2
Construction Monitoring By: CTC
We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation and redriving
of pin piles to support the existing foundation on the northern side of the complex.
Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The
pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and
connected with steel internal slip couplers. The replacement piles were moved laterally from the original location
and redriven. We monitored as the replacement pin piles were driven with a 140-pound pneumatic post -driver to
a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving, Pin piles
observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in
60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table
below. The depths are measured from the top of the foundation footing where present. The piles driven observed
installed today appear to have been suitably installed and should support the planned loads.
Pin Pile ID Embedment D epth (ft)
— ___4_5___ I-- - 13.4--
50 13.0
821 15�9
We have been providing monitoring of pile installation on a ftill-time basis. Our findings and conclusions are
based on specific observations madewbile on site. We will continue to monitor the initallation of underpinning at
the site.
Attachment: Site Plan
Distribution:
Signed:
5n-t P14-tv
TPT ff -
r-jLjj-- 15
DA-Tto- 7—h—lzx�lv
SLAB@ NLaA5Wk4RM
RELROVS 440 XERACE
Dw PATIO W wwa- ir-
IPAVE'.-'
WOCIFAWAT WAWA AND RUIAa NUM 'XD KO"CE
I s FA%7cow-gmwlhpw IMIEnwsm
kO OF GRAM wfrst%x7iw VAhO "r
Ir-ol 4*.W c 'r. .
vowrAwow-M MT" own. 0
AL 11
PVAOA A.-O IMOIAU 14 vi
F)w'OKUA6WlXEW am
WAM
AW .w
Z-L- 5%,
34
L =,!!a
;4: 41 - i
jo
umwrT
4v
room 6.,
qA
77-
74 r
V-V
TEW4)RAZfpvES'Tyr LS
VIV�MrWALL
T0OTfw9vfAfflcOmDmR