20180517071901.pdf%LP XOM V07--l- NELSON GEOTECHNICAL ASSOCIATES, INC. 17311 — 135th Avenue NE # A-500 Woodinville, WA 98072 V: (425) 486-1669 F: (425) 48 t -25 10 FIELD REPORT Cascadian Apartments Project: Underpinning Client: Jeff SterlinL,. 9405 Edmonds Way; Edmonds, Location: WA Weather: Sunm-; 30's Purpose of Visit: Construction Monitorin.4 FileNo.: 9879B-17 Date, 12/20/17 Report No.: I Page: 1 of 2 By: EAF NGA went to the site at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arriving on site, we met with Howard Clark, to discuss the objective of the day. The contractor planned to install multiple pin piles, across the exterior of the building, before the contractor continued to install brackets and prepare the site to proceed with the installation of pin piles. The contractor used a 140-pound hammer and a 2-inch diameter, 5 foot 3 inch long, steel pin pile, which was driven through an opening within the bracket. Upon completing the installation of the pin pile, the brackets will be secured and used to support the existing foundation. We observed the contractor install the following piles, identified per their label according to the plans: Pin Pile ID Embedded Depth 1 13 4 15 8 15 14 15 20* 10 23* 5 * Encountered an obstacle during installation and did not meet refusal. It was recommended that the pile be relocated to avoid the obstacle. We will continue to monitor the site on a part-time basis, and are available for additional consultation if requested. Attachment: Site Plan Signed: Distribution: Eric A. Finley — f A I — )VIDE FOOnW MAIN, UAIL W3.1, ROM TO tTE DISCHARGE SYSTEM KEEP FAST SLAB AND FAST p S LIFT AS NEEDED 3 FIREPLACE 7 9L 01 3 4.4 1.. 1* §1 ' I A& 7 T .9 40C. ;5 0 Ir 06 opt %T VI -UNIT i02 I 41 @ 14 4. a --------------- t -.7 At r .41 M 4 1 6 7 4'W _V 4--a' 10 W-W 31-W K I ! 4�t BUSTING 1� Cascadian Apartments Underpinning NGA File No. 98791317 FR# -L pg,. z/ -L /20 C7 Note: Not to scale, all drawings are approximate FIELD REPORT NELSON Project: Cascadian Apartments File NQ: 9879B17 GEOTECHNICAL Underpinning ASSOCIATES, INC Client: Jeff and Lisa Sterling Date: 12/21/2017 Location: 9405 Edmonds Way Report No: 02 17311 - 13511 Ave. NE #A-500 Weather: Overcast, 32T Page 1 of 2 Woodinville, WA 98072 Purpose of Construction Monitoring By: CTC (425)486-1669 FAX481-2510 Visit: We visited the site today at the request of Mr. and Mrs. Jeff and Lisa Sterling to provide geotechnical consultation and monitoring services for the Cascadian Apartments foundation underpinning project, located at 9405 Edmonds Way in Edmonds, Washington. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a dead stop at one inch or less of vertical movement in 300 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the structural bracket placed at the base of the foundation footing. Pin Pfle Number Embedment Depth I feet) 38* 6.7 27 11.6 33 12.7 30* 31* 80 5 Piles 3 8, 30, and 31 met refusal at depths less than 10 feet below the foundation, and were interpreted to have been obstructed. We recommended the underpinning contractors confirm relocation plans, or other method to reach refusal in native soils, with the structural engineer, per provided plans. We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are based on specific observations made while on site. It is our opinion that the pin piles we observed today were installed in accordance with the project plans and should support the planned loads. We understand that the contractors will continue to drive exterior piles the next business day, and will continue to monitor the installation of underpinning at the site. Attachment: Site Plan Signed: Distribution: Carston T. Curd, GIT Af— K--�,� OM MAE AM J;P ^a 11, 41 —77 1 4�, A-1 Jr 11-C i A T-C �iLt4 ms j-VL I Izd I A.4 6('�Lvd 7 Ana o' 46 Cascadian A artments Underpinning NGA File No. 9� pg: - / � 791317 FR#oa� 01% ON IM4 Note: Not to scale, all drawings are approximate 12, AYI --'. . - �11 af NELSON GEOTECHNICAL ASSOCIATES, INC. 17311 — 135th Avenue NE # A-500 Woodinville, WA 98072 V: (425) 486-1669 F: (425) 481-25 10 FIELD REPORT Cascadian Apartments Project: Underpinning Client: -Jeff St�r 9405 Edmonds Way; Edmonds, Location: WA Weather: Overcast; 30's Purpose of Visit: Construction Monitoring FileNo.: 9879B-17 Date: 12/22/17 Report No.: 3 Page: I of 2 By: EAF NGA went to the site at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arriving on site, we met with Wes and Eric, the contractors, to discuss the objective of the day. The contractor planned to install multiple pin piles, across the exterior of the building, before the contractor continued to install brackets and prepare the site to proceed with the installation of pin piles. The contractor used a 140-pound hammer and a 2-inch diameter, 5 foot 3 inch long, steel pin pile, which was driven through an opening within the bracket. Upon completing the installation of the pin pile, the brackets will be secured and used to support the existing foundation. We observed the contractor install the following piles, identified per their label according to the plans: Pin Pile ID Embedded Depth 2 is 79 15 81 15 The contractor will continue installing pin piles following the holidays, starting again on January 2, 2018. We will continue to monitor the site on a part-time basis, and are available for additional consultation if requested. Attachment: Site Plan Distribution: Signed: Eric A. Finley )VIDE FOOTING DRAIN, I � I IEML 9/S3.1. ROUTE To ' �U4 XE DUMRGE sysm d 4'-D' I 14�i -1� ;4 KEEP EXISTSLAH ANu EMST LFTASNEEDED Zp FIREPLACE W-W 4'-fY' 4q .4 j 7 L .41 -7-==] A b VS.@ V.00 15 �r 00 4' _'Y' 2' f 16 L RNEr _1K 141 0-4 V. Ldt 47" @ @ I. 46 4'4 @ 0 �4 4'-G* 3' 7= W__4 C Ir ExsnNe Cascadian A artments Underpinning NGA File No. 99791317 FR#; pg: Z I?/ zz /20 17 Note: Not to scale, all drawings are approximate FIELD REPORT NELSON Cascadian Apartments GEOTECHNICAL Project: Unde4)irmin FileNo.: 987913-17 ASSOCIATES, INC. Client: Jeff Sterlinj� Date: 1/3/18 17311 — 135th Avenue NE # A-500 9405 Edmonds Way; Edmonds, Woodinville, WA 98072 Location: WA Report No.: 4 V: (425) 486-1669 Weather: Clear; 30's Page: I of 2 F: (425)481-2510 Purpose of Visit: Construction Monitoring We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the central portion of the complex Upon arriving to the site, we met with the pile contractors to discuss the objective of the day. The contractor planned to install multiple pin piles, across the exterior of the building. Additionally, the contractors plan to install brackets and prepare the other pile locations to proceed with the installation of pin piles. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below, The depths are measured from the top of the foundation footing. We observed the contractor install the following piles, identified per their label according to the plans: Pin Pile ID 28 **30 **31 Embedded Depth 14.2 6.9 6.25 **35 4.75 **38 6 39 12 **41 r2 r42 10.25 "Piles 30, 31, 35, 38, and 41 appeared to meet early refusal on obstruction. Many of the piles driven today noted above appeared to meet refusal at a relatively shallow depth on obstructions. We understand that these piles will be addressed at a later time to determine the best approach the observed shallow refusal. The remaining piles that did not refuse on obstructions appear to have been suitably installed and should support the planned loads. We will continue to monitor the site on a part-time basis, and are available for additional consultation if requested. Attachment: Site Plan Signed: Distribution: A,5fz— S-tT-t NAN 157&7 8 7 DA-Tf- 'PA" SWONGUDEWINO ir oc FA wAr @tWvrAmxEft4a 0 fitu fv&U(Lf-A +Z�" 0 flui MooAVA f�d" ow(,i. afr"�- �o i-o-o-r, k,&,, 6bstmf'+Cd% a+ �;4A.&W gfil" ImMmunom VaywaL PlA4eOno,--' -77, OWCOWN= ir-r SWOKUPPOLAa 11141 ROMM - - - -- 4 ­�. Dwc[wcRmw/ww AND R&LAa DWCCWMos PSM(MURAM %W Eksm ryp 04. 4%M 114 ---L i f AL 4LL It------ Can L r -546�4 14 al 'b A r ywr f. Flu, PA 1SMAW "r .3 ,om vm*,e core, L I A P 4 4! M. 74 T.: b is i 4 nw ru^"Mc WAL =iell-. FIELD REPORT NELSON Cascadian Apartments GEOTECHNICAL Project: Vjj�ing FileNo.: 987913-17 ASSOCIATES, INC. Client: Jeff Sterliniz Date: 1/4/18 17311 — 135th Avenue NE # A-500 _94_05H_m� �ds Way; Edmonds, Woodinville, WA 98072 Location: WA Report No.: 5 V: (425) 486-1669 Weather: Clear; 30's Page: I of 2 F: (425)481-2510 Purpose I of Visit: Construction Monitoring By: ABR We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the central portion of the complex. Upon arriving to the site, we met with the pile contractors to discuss the objective of the day. The contractor planned to install multiple pin piles, across the exterior of the building and begin install on the interior. Additionally, the contractors plan to install brackets and prepare the other pile locations to proceed with the installation of pin piles. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation We observed the contractor install the following piles, identified per their label according to the plans: Pin Pile ID Embedded Depth A 12.75 B 1 12.5 C 13.75 36 1 11.75 37 10.75 **41 15-1-7 *Piles A, B, and C are 'temporary' screw -jack piles, added after overall pile layout was designed. "Pile 41 appeared to meet refusal on an obstruction. Many of the piles driven today noted above appeared to meet refusal at a relatively shallow depth on obstructions. We understand that these piles will be addressed at a later time to determine the best approach the observed shallow refusal. The remaining piles that did not refuse on obstructions appear to have been suitably installed and should support the planned loads. We will continue to monitor the site on a part-time basis, and are available for additional consultation if requested. We will continue to monitor the site on a part-time basis, and are available for additional consultation if requested. Attachment: Site Plan Signed: e Distribution: miw Sirt-pl,w 0 157q 8 t7 7'��J vvl-i&4 Aef4a` -ib 4-A&C DA-TV n" SAA'UeAAI 6#lj,14W. 144pc INRLTRATICH U97WELL PERGEOTEM MgrOMCPATIO RfhKhT AND PERACE EXIST PATIO W/ NEW V ir-r SW ON GRADE W/ ?A I. wwwo FVAOVtAkDmitAa VWFWNDA--MWI IDWCUWXASW/kEW IDWCOWSLAJI 1 6. SL" Ch CUM WjrMjCr" rn, w 4' VERIFY/ROWDE F"WiNG DRAW, REPENTODETAL943.LactmiD APPROPRAIE DISCIIARGE SMTtM REMOVE AND KPLACE FMSTCO"CSMWfPiEW FIN I "L,,ACvF, 'S' G'SLARONGRADE ..r 04r --v vl- -A' J. '74 4' A— L A A. 44 1 L In IT r A P'Om 'G 54, qf�tomo,;: m L too Ji '. .. - �11 - p 9 4 41 147 j 7- %7' 3w- 4--r IV-7 - a).- I A - I % f 7EMPORAR, PILE,, TW V-w -r-w VOL, 4 r FIELD REPORT NELSON Project: Cascadian Apartments Underpinning File No: 9879B17 GEOTECHNICAL Client: Jeff and Lisa Sterling Date: 1/5/2018 ASSOCIATES, INC Location: 9405 Edmonds Way Report No: 06 17311 - 135th Ave. NE #A-500 Weather: Rain, 51 IF Page 1 of 2 Woodinville, WA 98072 Purpose of Construction Monitoring By: CTC (425)486-1669 FAX481-2510 Visit: We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arriving to the site, we met with the pile contractors to discuss the objective of the day. The contractors continued the underpinning installation within the subject building. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation. Pin Pile ID Embedment Depth Ift) *45 10.5 46 12.6 47 12.1 9.8-- 52 13,6 *5 4 7.1 96 12.4 87 7.2 D 15.8 E 14.6 F 14.9 *Piles 45, 49, and 54 appeared to meet refusal on an obstruction. Piles D, E, and F are 'temporary' screw -jack piles, added after overall pile layout was designed. Many of the piles driven today noted above appeared to meet refusal at a relatively shallow depth on obstructions. We understand that these piles will be addressed at a later time to determine the best approach the observed shallow refusal. The remaining piles that did not refuse on obstructions appear to have been suitably installed and should support the planned loads. We will continue to monitor the site on a part-time basis, and are available for additional consultation if requested. We will continue to inoni(oi the site on a part-time basis, and are available for additional consultation if requested. Attachment: Site Plan Signed: Distribution: SITt PLAN I�ff413 V7 DA-Tt,-, lh C- INFILTRATION DRYWELL PER GEMCH EUSTCONCPATIO ir-r POAOW AND MPL44M s VW=KSLA&wJw-w MD OUT CON, 5,A3 Cn"ONCRW wIV 3�Rucr I.. ENWO Tyr J�71 A'& �4' 4- 0- REMOVIANDaEPLACE r4r ;-b 4 EICST CWC SLAM wi NEW cp 6� !RAS ON GRADE 4r.V W-W 11V % 74, J A C FMRG "Iv CONO, Pf da 22 r z o� - lift CZil.O NELSON GEOTECHNICAL ASSOCIATES, INC. 17311 — 135th Avenue NE # A-500 Woodinville, WA 98072 FIELD REPORT Cascadian Apartments Project: Underpinning Client: Jef�§tSl n 9405 Edmonds Way; Edmonds, Location: WA FileNo.: 987913-17 Date: 1/8/18 Report No.: 7 V: (425) 486-1669 Weather: Overcast; 50's Page: I of 2— F: (425)481-2510 Purpose of Visit: Construction Monitoring By: ABR We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the central portion of the complex. Upon arriving to the site, we met with the pile contractors to discuss the objective of the day. The contractors continued the underpinning installation within the subject building. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation footing. We observed the contractor install the following piles, identified per their label according to the plans: Pin Pile ID Embedded Depth (ft) J 48 11.75 *50 9.00 *51 8.10 *53 6.00 G 12.5 _77- 78 10.5 11.5 6.50 87 (redriven) *Piles 50, 5 1, and 53 appeared to meet refusal on an obstruction. Pile G is a 'temporary' screw -jack pile, added after overall pile layout was designed. Many of the piles driven today noted above appeared to meet reftisal at a relatively shallow depth on obstructions. We understand that these piles will be addressed at a later time to determine the best approach the observed shallow refusal. The remaining piles that did not refuse on obstructions appear to have been suitably installed and should support the planned loads. We will continue to monitor the site on a part-time basis, and are available for additional consultation if requested. Attachment: Site Plan Distribution: Signed: � AI-7 cj'2_ IW- 5IT-t NAIV WqS V7 DA-Tv 11,612A-tir M?Urcm Mww OTS tuaww'm M7-Mj*E_ mr2w mmmawl"wookRa ftvwL'MFx-tAm EMS-,Mcwtwws* IrOCEAWAY A COWMAM"Mm V-w I-4r oWCMCx"W/mRv EM F R" Ok MWE R"Ma r ( . * r OF_ 4' 4b4i vt () P)IU 0 i �Swtui h d44_1 jhsj'aL'w Y�dafl wkie_� &rpeAv �o ou'� r_q� At C'A s kjpjf-A-�; o N III,- wcv_�o . VT Ira, f4%MWtAPdDAEftACE 5 DweannowINEW WAM APO WtM )"W OWCOPKSL40 SWPWmw4p&CMN I V 9AS ON GMM 4'. 4.4. 4w 4! 4 A ..... cc I . '.. tl:7_-:lfj. .. - . ;.' ." -1- 1 - "' r umm""RLmro Dorm mu�m%%u -VEnGATE B�G X FounNG &VEWFVC%V7ION .6 Pl A FILLD REPORT NELSON Cascadian Apartments GEOTECHNICAL Project: -Underpinning FileNo.: 9879B-17 ASSOCIATES, INC. Client: Jeff Sterling Date: 1/10/17 17311 — 135th Avenue NE # A-500 9405 Edmonds Woodinville, WA 98072 Location: _WA Report No.: 8 V: (425) 486-1669 Weather: Overcast; 40's Page: I of I F: (425) 481-2510 Purpose of Visit: Construction Monitoring By: DPN NGA went to the site at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arriving to the site, we met with the pile contractors to discuss the ob ective of the day. The contractors j continued the underpinning installation within the subject building. They drove approximately 10 feet of Pile #71 when their compressor malfunctioned. After several attempts of trying to fix it they decided to wait until tomorrow to continue driving. We will continue to monitor the site on a part-time basis, and are available for additional consultation if requested. Attachment: Distribution: Signe(l.' NELSON GEOTECHNICAL ASSOCIATES, INC 17311 - 135" Ave. NE #A-500 FIELD REPORT Proj ect: Client: Location Weather: Woodinville, WA 98072 Purpose of (425)486-1669 FAX481-2510 Visit: CascadianApartments Underpinning FileNo:9879BI7 Jeff and Lisa Sterling 9405 Edmonds Way Rain, 46'F Construction Monitoring Date: 1/ 11/2018 Report No: 09 Page I of 2 By: EAF/CTC We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arrival to the site we inet with underpinning contractors from Advanced Foundation Stipports, LLC. The pin piles consisted of i-incl) dianicter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. Ile depths are measured from the top of the foundation footing. The piles driven observed installed today appear to have been suitably installed and should support the planned loads. Pin Pile ID Embedment Depth (ft) - 34 8.7_ 71 13.5 72 8.9 73 9.1 74 11.9 75 11.2 76 6.9 - 88 __91 --7.3 1111 — 12.7 — 92 95 8.9 We have been providing monitoring of pile installation on a full-time basis. Our fmdings and conclusions are based on specific observations made while on site. We understand that the contractors will continue to drive exterior piles the next business day, and will continue to monitor the installation of underpinning at the site. Attachment: Site Plan Distribution: �/ Al Signed: Z__ sm-t NA-tv If*8 V7 FjL*4 O� DA-Tt'. llllll� VERIFY/PROMDE F=lP4G DRAIN, RMR TO OFTAP ML POJM M APPACIPRIATE DISCHARGE SYSM ROAME AND REPLACE M7CDNCSLAGWjNEW 6* SLAB 04 GRADE zl� INFILTUTUR Dgr*M PER GCOTECH r4r T4r vm nunaa 4Ar 4'-(r .41 vw, 41: upir 3d WWAUDMiRG VIUMV cow L� A —WPORARYFlLMTYP /�N �Z A44,Aj EXW CONC PAM IJWCE 10* ItAh 0 MUSAS REQIjqRW iy.r RIMAMANOItEft4a awcamcnaw/kc. a-ca RWm W St:RM —7-1� Or SM ON GRADE 4'0 ImAr , 7 .A I—F a roe ji. . - -, i.. ... I. . - ( —jo AL A 1: ccSTW Pt�Ma WALL MvEmmme v=nNG FOOTOG & NOTIM COMMK -AL 4 FIELD REPORT NELSON Project: Cascadian Apartments Underpinning File No: 9879B 17 GEOTECHNICAL Client: Jeff and Lisa Sterling Date: 1/12/2018 ASSOCIATES, INC Location: 9405 Edmonds Way Report No: 10 17311 - 135h Avc. NE #A-500 Weather: Overcast, 40's Page I of 2 Woodinville, WA 98072 Purpose of (425)486-1669 FAX481-2510 Visit: Construction Monitoring By: DPN We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation footing. The piles driven observed installed today appear to have been suitably installed and should support the planned loads. Pin Pile ID LEmbedment Depth (ft) 79 E 15.7- 82-1 3.7 84 14.9 89 6.8 90 14.8 94 10.5 14.6 97 We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are based on specific observations made while on site. We will continue to monitor the installation of underpinning at the site. Attachment: Site Plan Distribution: Signed: ,FofZ- DN 1574 8 t-7 r—PL*-: 10 DATC: 'Ivz1l5 1>*4c -. y?_ IT. W/ NEW G' --GRADEw/m4@ 32-OCEAWAY4 VIRIfy/PRCVIDEFOCYTING DRAIN, REFERTODErAIL51/53.1-ROMM APPROPRIATE DISCHARGE SYSTEM EIIST CONC PATIO .1. 2L DOWEI &EPDXY REINF th -XP & 4" WIT. oltul 7- I�IEMOVE,.-D RE—C, PIMOVE A.40 REPLACE f EXIST FOLINDAT10M W/ EXIST . SLA13 EXISTCOKCSLAB ,I,� IN =ON SET GRAD W/6' STALIC1 SLAB D* Ty 4-W r i--- r1l Li 4 FIRE rLACTE .4 In r oc. .0c 4 -4r 4 1 71 _j 2A TLI l? lip. 9 J .4 qz 4 r 'Del . Lt� so EXISTING PWMBING WALL 'rwi—srIGAW EXISTING FOOTING & VERIFY COrOTION WFILTRATION DAYVIELL NELSON GEOTECHNICAL ASSOCIATES, rNC FIELD REPORT Proj ect: Cascadian Apartments Underpinning FileNo:9879BI7 Client: Jeff and Lisa Sterling Location: 9405 Edmonds Way 17311 - 1350'Ave. NE #A-500 Weather: Woodinville, WA 98072 Purpose of (425)486-1669 FAX481-2510 Visit: Overcast, 50's Construction Monitoring Date: 1/15/2018 Report No: I I Page I of 2 By-, DPN We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter ' schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. 'Me depths are measured from the top of the foundation footing. The piles driven observed installed today appear to have been suitably installed and should support the planned loads. Pin Pile ID Embedment Depth (ft) 7 15.2 8 14.1 9 15.0 10 15.0 11 15.1 12 15.0 13 14.9 15 85 15.4 15.7 14.9 Howard Clark and Jeff Sterling decided to remove Pile #14 from the plans due to underground conduits found during excavation for the pile. We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are based on specific observations made while on site. We will continue to monitor the installation of underpinning at the site. Attachment: Site Plan Distribution: Signed: 5n-t Plw q*Tq 8 V7 r-IL*.. I ( DA-Tt'. T%W, L/2- Zt, JNRLPATrONDRYWELL_,,,� PER GEDTEC34 MMST MUC PATIO &WMXILWAUZOATIO REMOVEAWMEPtACI EXSrPATloYWMWF LIW* rAWMWRMWfkEW COSTcowsi.4 SLANORGuawfolf LKWIN1111,11111110 EA WAY tOADWAADRV%AQ UMM AND RVUa L V*gjsakGkmx WtV STFUCT W g,/,W IV vuM/pw,oF P00W ftuK 4' ADAUK AND NVUa r-r t nwooMMMWIMCW am st" am GRAW S� ro 4'-V C4r 4'.W —.,M6 L ; 43 Ak oil A. t I f -T" A^ L 1. #A j1U*V4ko r . - . * , ; " .. ? * C4 "I - "-� , c * 41 , . - 4. � -3� 'I WY Coma, jo Jj j P-1 TDAPOx4.wPetMTTP, 9-M 4w r,. I'LLMOUNG WALL MVCMSATE CWMG *DGTM&MJFVCOt&rnom A3, .4- NELSON GEOTECHNICAL ASSOCIATES, INC 17311 - 1351 Ave. NE #A-500 FIELD REPORT Project: Cascadian Apartments Underpinning FileNo:9879B17 Client: Location: Weather Woodinville, WA 98072 Purpose of (425)486-1669 FAX481-2510 Visit: Jeff and Lisa Sterling Date: 1/17/2018 9405 Edmonds Way Report No: 12 Rain, 50's Page I of 2 Construction Monitoring By: EAF We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation footing. The piles driven observed installed today appear to have been suitably installed and should support the planned loads. Pin Pile ID Embedment Depth (ft) 89 __10.4 Temp- 15.6 bed/bath i Temp- 10.2 Temp-bed/bath and Temp-Laundry/bath were installed beneath interior walls to install permanent screws and to stabilize the interior walls separating the rooms of apartment 102. We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are based on specific observations made while on site. We will continue to monitor the installation of underpinning at the site. Attachment: Site Plan Distribution: Signed: r -5n—t P&OV IV7cr 8 t7 DA-T f, ZA\, WMTRATXM[WrAML I PER GMTECtf VMTCONCPkTIO SUB MES A$ KOMO -! .tr.r '14 WwWWANDRU"a vwcmcmmw/sfew rsma""W WO OW COW UAS WIV 57%tX7 SW mww-.O cwR"Da=*/ sposo" sa-V a v mm vom,"Mu FOOTM MAIN, REPM TO DET"rA'- ROLnEiu A PPRMlATED[SDMGFSvMw 4-.D- P AM. RFUM AM REPIACE V4r j -a wl New VSLABONGRADE RREPLAM - 4w c4r .r I.- d ?A 41 ow A LIP Ll ILI J-0 I 4'� rrl n 1� W*An 1.3�aC FOOTIRG i �ER-�y aM 42 % I - i I J . . , :: '- f. 6 A[ t Q,— J ft�� WAU FIELD REPORT NELSON Project: Cascadian Apartments Underpinning FileNo:9879BI7 GEOTECHNICAL Client: Jeff and Lisa Sterling Date: 1/19/2018 ASSOCIATES, INC Location: 9405 Edmonds Way Report No: 13 17311 - 1350'Ave. NE #A-500 Weather: Rain, 50's Page I of 2 Woodinville, WA 98072 Purpose of Construction Monitoring By: EAF (425) 486-1669 FAX 481-2510 Visit: We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation of pin piles to support the existing foundation on the northern side of the complex. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 53-foot lengths and connected with steel internal slip couplers. We monitored as the pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving, The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation footing. The piles driven observed installed today appear to have been suitably installed and should support the planned loads. Pin Pile ID Embedment Depth (ft) 16 17� �-4- 26 25 82 83 23 21 19 20 22 24 15.6 15.5 15.6 10.4 10.4 15.5 10.3 15.6 10.4 10.3 15.6 10.4 15.5 10.3 We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are based on specific observations made while on site. We will continue to monitor the installation of underpinning at the site. Attachment: Site Plan Distribution: Signed: Z 5IT-t Plw 107OV7 r-p-if'. DA-TE'. OaST WOO wtmwr $W ON CRAM W/ M 9 12'OCEAWAv WPJFYIMOWW Poor-WG OFA, , A'le L3�, PER GECITUM ONT COW PA710 SAWCLrr & WALCE PAnO SlMVPlu5ASAWWREc AND FVLACE MAME C=Wwnmw/h!* Ah E,QST COXC 0 "MACE VVAM ON rAmx STKLC- SLAD nato 4' .thxh2 O=TM0fCUA&W/lMW CSLADONGK40C V .1� - n, - -7 V& % r 3h —7 4 4S.0 A" is Or CO o4arc't, 1.vl b 4-1 l 4* d FOOT?-< 10 . 3 J 16 T TDAPORARvftjMTVp 'r.T r-V e r-cr 3..(r PLum@mvAkL L3 5 I-M-MGATE Cam. NELSON GEOTECHNICAL ASSOCIATES, INC FIELD REPORT Project: CascadianApartmentsUnderpinning FileNo:9879BI7 Client: Location: 17311 - 135" Ave. NE #A-500 Weather: Woodinville, WA 98072 Purpose of (425)486-1669 FAX481-2510 Visit: Jeff and Lisa Sterling Date: 2/l/2018 9405 Edmonds Way Report No: 14 Partly Cloudy, 53'F Page I of 2 Construction Monitoring By: ABR We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation and redriving of pin piles to support the existing foundation on the northern side of the complex. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. The replacement piles were moved laterally from the original location and redriven. We monitored as the replacement pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving. Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation footing where present. The piles driven observed installed today appear to have been suitably installed and should support the planned loads. Pin Pile ID Embedment Depth (ft) 49 9.3 � -8 12.25 7.5 35 12.3 28 7.25 30 31 8.5 54 9.3 Piles 45, 50, and 182 all met obstructions at shallow depths. The contractor will try and redrive these piles tomorrow We have been providing monitoring of pile installation on a full-time basis. Our findings and conclusions are based on specific observations made while on site. We will continue to monitor the installation of underpinning at the site. Attaclunent: Site Plan Distribution: Signed- wv sr-, 3n! D 7 -1 P IL r I 77 F via .1-3 j A" VIWQ "OLY.&NUISC13 Avon OUVOMWM Lnymn - MV4 2w:l ism Fm, 9 Vld nimmmnummo � w CIO, A*ft7(3 gUW '*AO-31— li- NELSON GEOTECI-INICAL ASSOCIATES, fNC 17311 - 135"' Ave. NE 4A-500 FIELD REPORT Proj ect: CaseadianApart.me:n.tstliiderpinn.ijig File No: 98791317 Client: Location: Weather; Woodinville., WA 98072 Purpose of (425)486-1669 FAX481-2510 Visit: Jeff and Lisa Sterling Date: 2/2/2018 9405 Edmonds Way Report No: 15 Partly Cloudy, 53T Page I of 2 Construction Monitoring By: CTC We visited the site today at the request of Jeff Sterling and Howard Clark to monitor the installation and redriving of pin piles to support the existing foundation on the northern side of the complex. Upon arrival to the site, we met with underpinning contractors from Advanced Foundation Supports, LLC. The pin piles consisted of 2-inch diameter, schedule 80, galvanized steel, which were cut into 5.3-foot lengths and connected with steel internal slip couplers. The replacement piles were moved laterally from the original location and redriven. We monitored as the replacement pin piles were driven with a 140-pound pneumatic post -driver to a refusal criterion of one inch or less of vertical movement in sixty seconds of continuous driving, Pin piles observed to be installed today were driven to a complete stop or at least one inch or less of vertical movement in 60 seconds of continuous driving. The depths to refusal and corresponding pile numbers are listed in the table below. The depths are measured from the top of the foundation footing where present. The piles driven observed installed today appear to have been suitably installed and should support the planned loads. Pin Pile ID Embedment D epth (ft) — ___4_5___ I-- - 13.4-- 50 13.0 821 15�9 We have been providing monitoring of pile installation on a ftill-time basis. Our findings and conclusions are based on specific observations madewbile on site. We will continue to monitor the initallation of underpinning at the site. Attachment: Site Plan Distribution: Signed: 5n-t P14-tv TPT ff - r-jLjj-- 15 DA-Tto- 7—h—lzx�lv SLAB@ NLaA5Wk4RM RELROVS 440 XERACE Dw PATIO W wwa- ir- IPAVE'.-' WOCIFAWAT WAWA AND RUIAa NUM 'XD KO"CE I s FA%7cow-gmwlhpw IMIEnwsm kO OF GRAM wfrst%x7iw VAhO "r Ir-ol 4*.W c 'r. . vowrAwow-M MT" own. 0 AL 11 PVAOA A.-O IMOIAU 14 vi F)w'OKUA6WlXEW am WAM AW .w Z-L- 5%, 34 L =,!!a ;4: 41 - i jo umwrT 4v room 6., qA 77- 74 r V-V TEW4)RAZfpvES'Tyr LS VIV�MrWALL T0OTfw9vfAfflcOmDmR