Loading...
20180530074954.pdfffAi ABOSSEIN ENGINEERING, LLC WLI Mechanical - Elecirical - Fire Protection - CiN7il - Structural - LEED - CEM Date: May 29, 2018 Mr. Chuck Miller City Of Edmonds/Building Division 121 5"' Ave. N. Edmonds, WA. 98020 Re: Plan Check: BLD2018-0586-1 I st review. Dear: Mr. Miller The following is the response to your plan review comments for Jacksons Food Store plumbing dated 5/18/2018. Sheet P 1.0 — FLOOR PLAN — WASTE & VENT, LEGEND, NOTES & SCHEDULE: I . Clarify on plans the represented placement of the water heater serving the lavatory in restroorn. It does not appear to meet maximum pipe length per (WSEQ Table 404.3. 1. An instantaneous water heater has been added. See Schedules on sheets P 1.0, & P2.0 and drawing P2.0. 2. Waste & Vent Riser Diagram — Change on the plans the number of WHU (drainage fixture units (DFU) in the Uniformed Plumbing Code (UPC) entering fixture 'GT/1' from '17' to '6'. WFU has been revised to '6' WFU, see sheet P 1.0 'FLOOR PLAN — WASTE AND VENT'. 3. Grease Trap Calculation a. Change on plans the adopted code regarding the sizing of the grease trap from 'OPSC 2014' to 'UPC 2015'. Code reference has been revised, see "GREASE TRAP CALCULATIONS" schedule sheet P1.0. b. Clarify on the plans the difference in the indicated size of the 3-compartment sink bowls used to size the grease trap and of that noted on the provided manufacturer information. The 3-compartment sink bowl dimensions have been revised and calculationa adjusted to match, see GREASE TRAP CALCULATIONS" schedule sheet P 1.0. Main Of&e: 18465 NE 68th St, #200, Redmond, WA RESUB 204 Lincoln, Mukilteo, WA 98275 MAY 2 9 2018 927 Kincaid Ave, #1, Sumner, WA 98390 Phone: (425) 462-9441 / Fax: (425) 462-9451 BU113ING DEPARTM www.aboBsein.com r_." OF EDMONOr S:\2 I 9052\Ca1c-Phnb\2019 05 24 Peniiii ROLIod # 2, 1 7487-C1-Ediiiotids-PUJTv1- Coinomits- Respoose Lettel%doc Page I of ABOSSEIN ENGINEERING, LLC Mechanical - Electrical - Fire Protection - Civil - StructuTal - LEED - CEM UL c. Clarify on the plans the difference in the indicated grease capacity and that noted on the provided manufacturer information — Schier — GB I — 20/25 Grease Interceptor. Capacities and grease trap manufacturer and model number have been revised to the Schier # GB 1. See GREASE TRA P CALCULATIONS" schedule sheet P 1.0 and "PLUMBING FIXTURE SCHEDULES" sheets P 1.0 and P2.0. 4. Backflow Preventer Notes a. Note 3.0 — Change on the plans the name of the state regulating the proposed work from 'Oregon' to 'Washington' Reference has been revised, see 'BACKFLOW PREVENTER NOTES' sheet PLO. b. Note 3.D i. Change on the plans the adopted code regarding the installation of the backflow prevention devise from 'OPSC' TO 'UPC 2015'. Reference has been revised, see '13 ACKFLOW PREVENTER NOTES' sheet P 1.0. ii. Change on plans the referenced code section regarding the location of backflow prevention devices from '603.3.4' to '603.4.3. Reference has been revised, see 'BACKFLOW PREVENTER NOTES' sheet P 1. 0. Plumbing Fixture Schedule a. Mark '5' — Under Mount Drain Trough — Eliminate from the plans the callout to note '1' regarding the provision of a reduced pressure backflow preventer. Callout for note # I has been eliminated from this fixture. See 'PLUMIBNG FIXTURE SCHEDULE' sheet P 1.0. b. Mark '17' —Fountain Machine —Add to the plans a callout to note "I' regarding the provision of a reduced pressure backflow preventer per UPC 603.5.12. A callout for note # I has been added to the fixture. See 'PLUMIBNG FIXTURE SCHEDULE' sheet P 1.0. Mark '19' — Remote Condenser — Eliminate frorn the plans the callout to note 'I' regarding the provision of a reduced pressure backflow preventer. There does not appear to be a need for cross connection control at the fixture. Per the 2015 UPC paragraph 814.3 'POINT OF DISCHARGE' —'Air conditioning discharge shall connect indirectly to the drainage system through an air gap or air break'. Since these units do not have a water connection they are not listed for cross connection control in chapter 6. They do require a waste cross connection control. Note # I in the 'PLUMBING FIXTURE SCHEDULE' has been revised to read 'PROVIDE REDUCED PRESSURE BACKFLOW PREVENTER, OR AIR GAP AS REQUIRED FOR CROSS CONNECTION CONTROL SEE SCHEDULE'. Main Office: 18465 NE 68th St, #200, Redmond, WA 204 Lincoln, Mukilteo, WA 98275 927 Kincaid Ave, #1, Sumner, WA 98390 Phone: (425) 462-9441 / Fax: (425) 462-9451 www.abokisein.com S:\219052\C,,flc-Phnb\2018 05 24 Pcrinit ROWid # N7497-Cf- Ed jiioi1ds-PLUrv1- Coiiiineiits- Respome Letter.doc Pa-e 2 of MABOSSEIN ENGINEERING, LLC Mechanical - Electrical - Fire Protection - Civil - Structural - LEED - CEM d. Mark '3 1' — Fast Draw Chemical management Systern — Add to the plans a callout to note '1' regarding the provisions of a reduced pressure backflow preventer per UPC 603. The 'Fast Draw Chemical Management System' has an internal air gap fitting meeting the requirements of ASSE 1550 that provides the required backflow protection. See attached manufacturers literature for ASSE rating. e. Mark 'GT/I — Grease Trap i. Connection size — Waste — Clarify on the plans the difference in the indicated size of the waste connection serving the grease trap and of that noted on the provided manufacturer information. Grease waste size has been revised to 3" to match manufacturer information, See sheet PI.O. ii. Description — Clarify on the plans the difference in the indicated manufacturer information and of that noted on the provided manufacturer information The grease trap manufacturer on the plans has been revised to Schier # GB I and sized for 20 GPM at 70 lb. grease capacity meeting the flow requirements of the 3-compartment sink, seee 'GREASE TRAP CALCULATION' and 'PLUMBING FIXTURE SCHEDULE'sheet P1.0. Sheet P2.0 — Floor Plan — Domestic Water, Notes, Schedules & Detail: 6. Floor Plan — Plumbing a. Extend on plans the 'leader line' for the item marked '32' — Water Filtration Systern' to the location on the plans represented as supplying the filtered water. The leader has been adjusted as much as possible to clarify the 'item it is referring to. Please note that the water filter is mounted directly above item '3 1' so visually separating the two leader call outs and still pointing to the items has been done with the space available. b. Provide on plans information on the 'PLUMBING FIXUTRE SCHEDULE' regarding the fixt1ire marked 'I 6'Additional plan review note: The item marked '16' on sheet 'P 1.0' is identified as 'Open Air Display Cooler ' on the 'PLUMBING FIXTURE SCHEDULE' and appears to be different than that represented on sheet P2.0 Fixture '16' has been added to the 'PLUMBING FIXTURE SCHEDULE' on sheet P2.0. The location of item '16' has been coordinated with both sheets P 1.0 and P2.0 and fixture item 'I I' has been added to both schedules and coordinated on drawings. See 'PLUMBING FIXTURE SCHEDULES' sheets P 1.0 & P2.0 and floor plans. Main Office: 18465 NE 68th St, #200, Redmond, WA 204 Lincoln, Mukilteo, WA 98275 927 Kincaid Ave, #1, Sumner, WA 98390 Phone: (425) 462-9441 / Fax: (425) 462-9451 www.aboseein.com S:\2180521\C�ilc-P I inb\2018 0,; 24 Pei-iwt Rotiiid # 2\17487-C1-Fdiiioiids-PL(JN1- Coiiiiiiciits- Respoiise Letterdoc Pa-c 3 of WABOSSEIN ENGINEERING, LLC =L11 Mechanical - Electrical - Fire Protection - Civil - Structural - LEED - CENI Clarify on the plans the represented placement of the water heater serving the lavatory in the restroom. It does not appear to meet the maximum piping length per WSEC Table 404.3. 1. An instantaneous water heater has been added. See 'PLUMBING FIXTURE SCHEDULE, and floor plan sheet P2.0. 7. Plumbing Fixture Schedule a. Mark '5' — Under Mount Drain Trough — Eliminate from the plans the callout to note '1' regarding the provision of a reduced pressure backflow preventer. Callout for note # I has been eliminated from this fixture. See 'PLUMIBNG FIXTURE SCHEDULE' sheet P 1.0. b. Mark '17' — Fountain Machine — Add to the plans a callout to note "I' regarding the provision of a reduced pressure backflow preventer per UPC 603.5.12. A callout for note # I has been added to the fixture. See 'PLUMIBNG FIXTURE SCHEDULE' sheet P1.0. c. Mark '19' — Remote Condenser — Eliminate from the plans the callout to note '1' regarding the provision of a reduced pressure backflow preventer. There does not appear to be a need for cross connection control at the fixture. Per the 2015 UPC paragraph 814.3 'POINT OF DISCHARGE' —'Air conditioning discharge shall connect indirectly to the drainage system through an air gap or air break'. Since these units do not have a water connection they are not listed for cross connection control in chapter 6. They do require a waste cross connection control. Note # I in the 'PLUMBING FIXTURE SCHEDULE' has been revised to read 'PROVIDE REDUCED PRESSURE BACKFLOW PREVENTER, OR AIR GAP AS REQUIRED FOR CROSS CONNECTION CONTROLSEESCHEDULE'. d. Mark '3 V — Fast Draw Chemical management System — Add to the plans a callout to note 'l' regarding the provisions of a reduced pressure backflow preventer per UPC 603. The 'Fast Draw Chemical Management System' has an internal air gap fitting meeting the requirements of ASSE 1550 that provides the required backflow protection. See attached manufacturers literature for ASSE rating. e. Mark 'GT/I —Grease Trap i. Connection size — Waste — Clarify on the plans the difference in the indicated size of the waste connection serving the grease trap and of that noted on the provided manufacturer information. Grease water size has been revised to 3" to match manufacturer information, See sheet P1.0. ii. Description — Clarify on the plans the difference in the indicated manufacturer information and of that noted on the provided manufacturer information Main Office: 18465 NE 68th St, #200, Redmond, WA 204 Lincoln, Mukilteo, WA 98275 927 Kincaid Ave, #1, Sumner, WA 98390 Phone: (425) 462-9441 / Fax: (425) 462-9451 www.aboi3sein.com S:\218052\Ca1c-Ph1ib\2018 05 24 Pei-init Rowid 4 2\17497-C1-EcMioiids-PLLJM- Coiiiiiietits- Respome Lettei%doe Page 4 of ffli ABOSSEIN ENGINEERING, LLC WL11 Mechanical - Electrical - Fire Protection - Civil - Structural - LEED - CEM The grease trap manufacturer on the plans has been revised to Schler # GB I and sized for 20 GPM at 70 lb. grease capacity meeting the flow requirements of the 3- compartment sink. Size 'GREASE TRAP CALCULATION' and 'PLUMBING FIXTURE SCHEDULE' sheet P 1.0. 8. Detail I/P2.0 a. Clarify on the plans the represented installation of a circulation pump. There does not appear to be a circulation loop proposed on the 'Floor Plan — Plumbing. Circulation pump has been removed, see detail I/P2.0. b. Change on the plans the referenced code section regarding the anchorage or strapping of the water heater frorn '508.1.2' to '507.2'. Code reference has been revised see, detail I/P2.0 Sheet P3.0 — Plumbing Specifications: 9. Plumbing Specifications — Division # 22 a. Part 1.00 — General — Item 1.02 — Change on the plans the referenced code from 'OMSC — Oregon Mechanical Specialty Code' to 'IMC — International Mechanical Code' and from OPSC — Oregon Plumbing Code' to 'UPC — Uniform Plumbing Code'. All references have been revised, see sheet P3.0 paragraph 1.02. b. Part 2.00 — Products — Item 2. 11 — Change on the plans the referenced code and code chapter regarding water supply piping installation frorn 'IPC' and '13' to 'UPC' and W respectively. All references have been revised, see sheet P3.0 paragraph 2.11. c. Part 3.00 — Execution — Item 3.50 — Change on the plans the referenced code and code chapter regarding fuel gas piping materials and installation from 'Uniform Plumbing Code' and '12' to 'International Fuel Gas Code' and '4', respectively. All references have been revised, see sheet P3.0 paragraph 3.50. Main Ofhce: 18465 NE 68th St, #200, Redmond, WA 204 Lincoln, Mukilteo, WA 98275 927 Kincaid Ave, #1, Sumner, WA 98390 Phone: (425) 462-9441 / Fax: (425) 462-9451 www.abo8sein.com S:',218052\Ca1e-Phnb\2018 05 24 Pennit ROLUid # 2,.17487-C[-F,diiioiids-['L(JM- Coininems- Respoilse Lettel%doc Nge 5 of Uti ABOSSEIN ENGINEERING, LLC UL" Mechanical - Electrical - fire Protection - Civil - Structural - LEED - CEM Please contact me, if you have any additional questions or additional information is needed. Sincerely, Dennis Grovenburg Plumbing Department Main Office: 18465 NE 68th St, #200, Redmond, WA 204 Lincoln, Mukilteo, WA 98275 927 Kincaid Ave, #1, Sumner, WA 98390 Phone: (425) 462-9441 / Fax: (425) 462-9451 www.abossein.com S:\218052\C,flc-PhiibI,2018 05 24 Pennit ROLUid 4 2\1 7487-CT-Edinoiids-PLUM- Coinnients- Respoiise Lettendoe Nige 6 of