City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
DATE:
May 14,2018
TO:
Kristin Hanson
FROM:
Eric Carter, Plans Examiner
B"
Plan Check: BLD2018-0601
Project Address: 22618 98th AVE W
Scope: Front porch conversion to conditioned space
Please be advised that the building plans for the above referenced project have been disapproved
for the purposes of obtaining a building permit. During a review of the plans by the Building
Division for compliance with the applicable building codes, it was found that the following
information, clarifications, or changes are needed. Reviews by other divisions, such as Planning,
Engineering, or Fire, may result in additional comments that require attention beyond the scope of
this letter. Items that recur on this list appear in italics.
A complete review cannot be performed until the revised plans/documents, including a
written response in itemized letter format indicating where the 'clouded' or otherwise
hi2hli2hted chan2es can be found on the revised plans, have been submitted to a Permit
Coordinator.
Resubmittals must be made at the Development Services Department on the 2 d Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
Page 5:
The foundation detail on page 5 indicates the placement of a HD3B at each end of the
addition. The placement of these hold downs do not comply with the intended shear
walls. The intended hold downs must be placed on panel sections the openings for the
window and door interrupt the panel segment. To comply with the prescriptive
requirements the hold down must be placed at the start and end of each panel in which
the design requires them.
Please let me know if I can be of any further assistance.
Sincerely,
Eric Carter