Loading...
20180601132709.pdfs l o 1 ı tãA tA2.9622 t^a aat 94^I lô1 Aldçkın W Re: Moy 25, 2018 Mr. Eric Corter Plons Exominer City of Edmonds - Building Division l2l srh Avenue N, 2nd floor Edmonds, WA 98020 Project Address: 123 2nd Avenue South Plon Check #BLD20l8-0558 Scope: Add demising wollto creole lwo fenont spoces. Provide ollerotions ond occessibility upgrodes to Reslrooms on interior occessible route of trovel. Deor Mr. Corter, Thonk you for toking the time to review our project. Listed below ore our responses fo the Plon Review Comments doted Moy 09, 2018. Generol: t . The olferofions require occessibilify upgrodes for the building per WAC 51.50 AEBC4!0.7). On fhe plons, either o) cleorly show fhot lhe inlerior occessible route of trovel complies wifh cunent code, or b) provide upgrodes per the previously referenced section. lf you choose to use excepfio n # I of fhof section , provtde o telter slomped ond signed by the orchitect {reference the code excepfionJ. stofing the overoll proiect cost, 20% of the proiecf cosl ond fisf fhe occessibi/ity upgrodes thot wÌtt be done os porf of fhis permit os wel/ os showing that the tofc¡/ cost of the upgrodes ts of leost 20%. -or- The olterolions require occessibility upgrodes for the building per WAC 5l .50 {IEBC 4ì0.7). On the plons, either o) cleorly show thoÌ lhe interior occessible route of trcvelcomplies with current code, or b) provide upgrodes per the previously referenced section. lf you choose lo use exception #l of lhot secfion, provide o lelter {reference lhe code exceplion), sloting the overoll project cos|,20% of the project cost, ond lisf the occessibility upgrodes thot will be done os porl of lhis permil os well os showing thol lhe totol cosf of the upgrodes is ot leost 20%. Show lhese feotures on the Plons. For exomple, lhe voluolion of the project os listed on the permii opplicction is $2000, 20% of which is gì400. The code requires thot in oddition to your bosic construcTion budget, o minimum of g1400 musl be spenl on cccessible upgrodes unless the spoce fully complies with occessibilily requiremenls of IEBC 410.7. Possible feoiures fhot could be considered for upgrodes might include occessible toilets ond sinks, reslroom grob bors, door sizes ond opprooch sPoce, etc. Response: The projecl scope hos been exponded to include the instollotion of fixed side woll verticol grob botr in four 1+¡ of tfre exisling wheelchoir occessible WC comportmenls (two locotions on level 2 . ãnd 2 locolions on Level l.) The verticol grob bor inslollotion, locotion, plocemenl. ond support defoils hove been referenced ond clouded on sheels G.0.0, A.2A.l ond 4.9.1. Finonciol cost onolysis to supporl lhe 20% rule per exception #l of WAC 51.50 (lEBC4l0.7) hos been provided on sheel G.0.0. MESUB h.{AY 3 1 2019 BTJI..DIA¡G æPAñTMENI"CITYOFEDfvIOf{æ G0.0: 2.Ihe p/ons reference toble 1006.3.2 (2) footnofe b os the meons of utitizng one exif. With o colculoted occuponf /ood of 58 ond fhe exil occess not on fhe "leve/ of exit dischorge" nof being on fhe some /evel os fhe spoce, f oofnote B does not appty. Pleose revise fhe nofe. With lhe occupont lood exceeding 49, the new spoce will require fwo exifs. Pleose indicote fwo exifs rn occordonce with IBC 1007, 1016, 1017, ond ony other opp/icoble codes seclions fhof moy opply fo fhe revised design on fhe plons. Furlhermore; pleose updofe the "Buitding Summory" to reflect lhe revised occupont lood, p/eose see the occuponf lood diogrom thof is offoched. Response: A dedicofed reception entry spoce for the occumulolion of occuponts in the entry of Suite 200 is not needed. As o resull, lhe plons hove been revised to provide file storoge spoce in lieu of the entry woiting oreo ond ossocioted increosed occupont loqd. With this plon revision, the occupont lood for Suite 200 does not exceed 49. The revised plon loyoul ond oreo colculolions con be found on Sheets G.0.0 ond A.2A.1. ln oddition.lhe "Building Summory" hos been exponded fo include the creotion of fhe odjocenl vocont Suite 230 thot hos effecfively been creoled with the demising work of Suite 200 under this permil. Thonk you ogoin for your time ond review comments. Pleose feel free to contoct me wilh ony questions, concerns or to discuss further if needed. Sincerely Jorrod Arbini, AIA Weover Architects