Loading...
2018-0613 Dolan Addition (McNurlen).pdfOV EDAI 0 City of Edmonds PLAN REVIEW COMMENTS BUILDING DIVISION (425) 771-0220 DATE: May 24, 2018 TO: Ron McNurlen McNurlenkComcast.net FROM: Eric Carter, Plans Examiner B" Plan Check: BLD2018-0613 Project Address: 515 Homeland DR. Scope: Addition, SFR, VB Construction, Plumbing and Mechanical included. Please be advised that the building plans for the above referenced project have been disapproved for the purposes of obtaining a building permit. During a review of the plans by the Building Division for compliance with the applicable building codes, it was found that the following information, clarifications, or changes are needed. Reviews by other divisions, such as Planning, Engineering, or Fire, may result in additional comments that require attention beyond the scope of this letter. Items that recur on this list appear in italics. A complete review cannot be performed until the revised plans/documents, including a written response in itemized letter format indicating where the 'clouded' or otherwise hi2hli2hted chan2es can be found on the revised plans, have been submitted to a Permit Coordinator. Resubmittals must be made at the Development Services Department on the 2 d Floor of City Hall. Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays. General: 1. With a proposed addition of 1021 square feet of "conditioned space", the project must comply with the prescriptive requirements of the Washington State Energy code plus select additional credits from table R406.2. This project requires that a minimum 1.5 credits be selected from the table. Please select the desired credits and indicate on the plans. 2. The proposed addition is in excess of 500 square feet and is required to have a "whole house" ventilation system that meets the requirements of the 2015 International Residential Code section M 1507.3. If there is currently a ventilation for the existing home which meets the requirements of table M1507.3.3 (1), the existing system can be utilized. Please indicate the location and CFM rating of the ventilation system on the plans. Page 5: 3. The proposed project will be required to install Carbon Monoxide detectors in accordance with the Washington State Amended version of R315.2.2. and 315.2.3. Please indicate the location of the detectors on the plans. 4. By the overall size of the proposed moment frame, it is assumed that field welding will be required. A third party inspector will be required to inspect the welds. For your convenience, I have included the Special Inspection testing agreement, this agreement will need to be filled out in its entirety and returned prior to permit issuance. 5. On the plans beam A is indicated as a 4x 10 DF #2, the provided calculations indicate a 4x I ODF #1. When applying the applicable loads to a #2 beam, an overloaded condition occurs. Please clarify which beam is to be used on the plans. Please let me know if I can be of any further assistance. Sincerely, Eric Carter Page 2 of 3 Page 3 of 3