Loading...
20180719094629.pdfSPECIAL INSPECTION AND TESTING AGREEMENT Permit #:BLD2OI Project: ESD Sherwood Elementarv Portable Classrooms Príor to ìssuønce of ø pemút, this form musl be compleled Ín iß mtirety ønd retu¡ned to the CÍly for approval. The contplAedform musl hove sÍgnatures of acknowledgntent by all pørlies. DUTIES AND RESPONSIBILTTIES Soecial hsnection Firm and Sneclal Insoeetors: The Specíal lnspection firm of *- Âs5 c will perform special inspection for the following types of rvork (separate forms must be submitted if more one firm is to be employed): Expansion Anchors All individual inspectors to be employed on this project will be WABO certified for the type of work they are to inspect. If inspection is for work that is not covered by the U|ABO categories, or the inspector is not IüABO cert¡lied, a detailed resume of the ¡nspector and firm muit be submitted. The resume must show that the inspector and the firm are qualificd by education and experience lo perform the rvork and test¡ng required by the project design and specifÌcations. The worlc shall be inspected forconformance with the plans and specifications approved by the C¡ty. Revisions and addenda sheeß wil¡ not be used for inspection, unless they have been approved by the City. Inspection records shall include: ¡ A daily record lo be maintained on s¡te, itemizing the inspections perfonned. Any nonconforming rvork shall be brought to the immediate attention of the contractor for rcsolulion.¡ A weekly report shall be submined to the City; detailing the inspections and testing performed, listing any nonconforming work and resolution of nonconforming items.¡ A final report shall be submitted to the building deparûnent prior to the Certificate of Occupancy being issued. This repon wilt indicate that inspection and æsting was compteted in conformance with the approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be detailed in the final report. Contractor: The contractor shall provide the special inspector or agency adequate notification ofwork requiring inspection. The City approved plan and specifications must be made available, at the jobsite for the use of the special inspector and the City inspector. The conbactor shall maintain all daily inspection reports, on site, for rcvierv by all parties. The special inspection fr¡nctions arc considered to be in addition to the normal inspections performed by the City and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be poured or other work covered until approval is given by the City inspector. \\EDMSVR-DEgfFs\Building\Handous lnformation þ Chuck\x inspcctions\COE SPECTAL INSPECÎON AND ÏESTING AGREEMENT. doc x,7 I I 7 nO I 8 Buildine Deoartment¡ The buildin-g departmcnt shall review any revisions and addenda The City inspector wilt monitor the specialinspection fi¡nc¡ions for compliance wittrthe agreement and the approved ilans. The City inspector shall beresponsible for approving various søges ofcoñshuction to be covere¿ anffor wo* to proceed. I)esien Prof€ssion¡l¡: The arcìitect and/or engineer.will clearly indicate on the plans and specifications the specific types of specialinspection required and shall include a schedule for inspection ."J t irt¡"Ë. ï¡. ,t"rtitått *øír".ngineer willcoordinate their rcvision and addenda process in such away as to ensureihai all requircd c¡ty áppiã"åi" -obtained, prior to work shown on the rwisions being performed in the fierl Owner: The project orvner' or the architect or engineer acting as the orvners ageng shall emptoy the special inspector oragency. A raiture-orrhe.speciar h:t-r:i::g.I*," r.JfrlÌ:lrH#å lhe requiremenrs orthe rBC, the approvedplans and this document, may void this agrelment an¿rt¡e'guäo¡ùoffi;;åì approvat of rhe special inspector. ln s¡ch a case a new special inspector anÚor firm rvould need ro ¡ã prop"sø tóiapproval- a råin* ıi¡r"design and/or construct¡on parties to perform in accordance wiûr trriJ ag;ement may resutt in a STop woRKnotice being posted on the project uniil nonconforming items tr"n" ue"ñresoluø. I have read and asre ro compry with the*å:Ho#lll'?"1Tf;il1ïL*,n.* ts Conlractor: Special L oav 7'17-lÐ o*e: 7 -11-tE- o*,,4' f('18 €rru+ruP¿', Special Insp. THE Date:z/'þ¡" 2 c-"(t'r7T' By: CITYQF.EDMONDS VL'h D,*i 7- l1 -l I BUILDINGDEPT \EDMsvR'DeprrsBuildino\llandouts tnformuion þ Chuck\x inspcaions\CoE spEclAL fNspEcT¡oN AND TESTïNGAGREEMENT.docTI t n notí