20180726151551.pdf............................. 4 wwrwuiIT Lci "11"Ll, faia-c June 26, 2018 civil & structural engineering & planning Steven Wright, Geotechnical Peer Review City of Edmonds, Planning Division 121 5th Avenue N Edmonds, WA 98020 RE: Plan Check: Project Name: Project Address Dear Mr. Wright, BLD2018-0517 Larsen Single Family Residence 15729 75th PI W Itemized below is our response to the engineering review comments in the April 30, 2018 letter for the above referenced project. Our response appears in bold. GEOTECHNICAL REPORT • The vicinity map does not identify existing conditions such as known landslide masses, debris flows, or mud flows on or near the site. The vicinity map has been updated on S0.1 to show the know slide area. Also refer to the response by Nelson Geotechnical dated 7/25/18. • The topographic survey does not show distances to existing habitable structures on or near the site, as required in ECDC 19.10.030(D). Distanced have been added to the site plan. Please refer to 50.1. • The applicant did not submit a separate topographical drawing showing proposed grade contours at 2-foot intervals, as required in ECDC 19 . 10 .0 3 0 (E.7). All work is within the footprint of the existing building. The grading will not change. • The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not provide analysis of the rate of retreat of the bluff nor an estimate of the percent risk of landslide area expansion that recognizes and reflects potential catastrophic events such as seismic activity or a 100-year storm event, as required in ECDC 19.10.030(H.6) and ECDC 23.80.050(F.2.e). Please refer to the response by Nelson Geotechnical dated 7/25/18. • The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not describe public and private sewage disposal systems, as required in ECDC 23.80.050(F.2.c). Please refer to the response by Nelson Geotechnical dated 7/25/18. 250 4th Avenue South, Suite 200 Edmonds, WA 98020 ph.425.778.8500 1 f.425.778.5536 www.cgengineering.com Larsen 3 Lot Short Plat 17145.10 July 26, 2018 Comment Response — Building Page 2 of 2 0 The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not consider the run -out hazard of landslide debris and/or the impacts of landslide run -out on downslope properties, as required in ECDC 23.80.050(F.2.f). Please refer to the response by Nelson Geotechnical dated 7/25/18. o The geotechnical report, dated February 28, 2018 by Nelson Geotechnical Associates does not adequately assess the stability of the slope, as required in ECDC 23.80.050(F.2.g). The geotechnical engineer should confirm the stability of the slope through modeling or numerical analysis and present the results in the geotechnical report. Please refer to the response by Nelson Geotechnical dated 7/25/18. The applicant did not submit documentation of required bonds, frozen funds, or adequate instrument of credit, nor did they submit a copy of the contractor's general public liability insurance, as required by ECDC 19.10.030(J). Bond issues will be addressed with the City of Edmonds. If you have any questions or comments regarding the responses to this review, please do not hesitate to call. Sincerely, CG Engineering Dennis Titus, PE, SE Project Manager 250 4th Avenue South, Suite 200 C Edmonds, WA 98020 RlllwiCa ph.425.778.8500 1 f.425.778.5536 �li�lGII�NI www.cgengineering.com