2018-0748 Thompson Addition.pdf
DATE: June 22, 2018
TO: Peter Sandall
pete@sandallnorrie.com
FROM: Eric Carter, Plans Examiner
RE: Plan Check: BLD2018-0748
Project Address: 17126 76th AVE W
Scope: Addition, SFR, VB Construction, Plumbing and Mechanical included.
Please be advised that the building plans for the above referenced project have been disapproved
for the purposes of obtaining a building permit. During a review of the plans by the Building
Division for compliance with the applicable building codes, it was found that the following
information, clarifications, or changes are needed. Reviews by other divisions, such as Planning,
Engineering, or Fire, may result in additional comments that require attention beyond the scope of
this letter. Items that recur on this list appear in italics.
A complete review cannot be performed until the revised plans/documents, including a
written response in itemized letter format indicating where the ‘clouded’ or otherwise
highlighted changes can be found on the revised plans, have been submitted to a Permit
Coordinator.
Resubmittals must be made at the Development Services Department on the 2nd Floor of City Hall.
Permit Center hours are M, T, Th, & F from 8am-4:30pm and from 8:30am-12pm on Wednesdays.
General:
The proposed plans appear to have incorporated work designed by Gregory Coons P.E.
WAC 196-23-020 requires any professionally licensed party who has performed work or
designs incorporated into the submitted construction documents, must stamp the pages of the
plans in which the work is indicated. Please have the EOR stamp any pages or portions of
the plan in which their work is used.
A1:
1. The proposed project is required to meet the minimum prescriptive requirements of the
Washington State Energy code as indicated on page A1 of the submitted plan. The new
space must also elect additional energy credits from table R406.2. With a proposed space
of 370 square feet, you will need to select .5 applicable credits from the table and
indicate on the plans.
City of Edmonds
PLAN REVIEW COMMENTS
BUILDING DIVISION
(425) 771-0220
Page 2 of 3
A2:
2. It is indicated that HDU2 hold downs are to be installed in 2 locations along the
foundation. The anchor that will be embedded in the foundation does not appear to be
specified. Please identify which specific anchor is to be used on the plans.
A3:
3. It appears that a local exhaust fan will be installed in the proposed bathroom but the
CFM rating does not appear to be noted. Please indicate the minimum CFM rating of the
fan in accordance with table M1507.4 on the plans.
Please let me know if I can be of any further assistance.
Sincerely,
Eric Carter
Page 3 of 3