SPECIAL INSPECTION AND TESTING AGREEMENT
Permit #: BLD2 017-0545
Project: 514 8th AVE N New SFR/ ADU
Prior lo issuønce of a permí4, this form mast be completed in its entìrety and retutned to the City forapproval. The completedform must høve sìgnøtures of acknowledgment by atl pørtìes.
DUTM,S AND RESPONSIBILITIES
Snecial Insnection Firm and Special Inspectors:
The Special Inspection firm of Geotech Consultants. Inc. will perForm special inspection for the following types
of work (separate forms must be submitted if more than one firm is to be employed):
. Pin piles
---S*n¡e+ural-eene+ete
All individual inspectors to be employed on this project will be WABO certifïed for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspéctor is not WABO
cer1ified, a detailed resume of the inspector and firm must be submitted. The resum" tnurt show that the
inspector and the firm are qualified by education and experience to perform the work and testing required by the
project design and specifications-
The work shall be inspected for conformance with the plans and specifications approved by the City. Revisions
and addenda sheets will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention of the contractor for resolution.
A weekly report shall be submitted to the City; deøiling the inspections and testing performed, listing
any nonconforming work and resolution of nonconforming items.
A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must
be deøiled in the final report.
Contractor:
The contractor shall provide the special inspector or agency adequate notification ofwork requiring inspection.
The City approved plan and specifications must be made available, at the jobsite for the use of the ip"cial
inspector and the City inspector. The contractor shall maintain all daily inspection reports, on site, ior review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. Nó concrete shall be
poured or other work covered until approval is given by the City inspector.
a
o
C:\UsersVimi\Downloads\BlD201 7-0545 Thuesen SFR (signed).doc?/l 3/201 g
Buildine Denartment:
The building department shall review any revisions and addenda- The City inspector will monitor the special
inspection firnctions for compliance with the agreement and the approved ptans. the City inspector shall be
responsible for approving various stages ofconstruction to be covered und for work to präceed.
Desisn Professionals:
The architect and/or engineer will clearly indicate on the plans and specifications the specific types of special
inspection required and shall include a schedule for inspection and tésting. The architËct and/oiengineår will
coordinate their revision and addenda process in such a way as to ensure tlat all required City apprwals are
obtained, prior to work shown on the revisions being performed in the field.
Owner:
The project o\ryner, or the architect or engineer acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMENT
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC, the approvedplans and this document, may void this agreement an¿ the-guilding Ofüciai's approval of the special inspector.
11 such a case a new special inspector and/or firm would need to be proposed foi approval. A faìlure of the
design and/or construction parties to perform in accordance with thii agreement may result in a STOp ryORK
notice being posted on the project until nonconforming items have been resolved.
ACKNO\ilLEDGMENTS
I have read and agree to comply with the terms and conditions of this agreement.
Owner: €L q*b Date I rt+/rc,
Contractor: l3 ni c* ß.Date: n (t''-(tg
Arch.Æng:Date:
Speoial Insp.Geotech Date: 7112118
Special Insp.ø
ACCEPTED FORTHE CITY OF EDMONDS BUILDING DEPT.
By Date e/, "
C;\UsersUimiV)ownloads\BLD2O I 7-0545 Thuesen SFR (signed).doc7 /13t20tE