Loading...
20180803134611.pdfKe1li Martin thepermitnetwork@ gmail. com 206-354-1445 Date: August L,2OI8 Kernen Lien, Environmental Programs Manager, City of Edmonds kernen.lien @edmondswa.gov From: Kelli Martin, Permit Specialist, The Permit Network thepermitnetwork@gmail. com Re:Second Round Comments Response Letter- PLANNING DIVISION REVIEW Application #: 81D20180354 Project: James Weis- Single Family Residence Project Address: L6630 74th Pl W The purpose of this letter is to address additionalcomments received from you on July 1'L,2018 regarding the aforementioned project. For your convenience and to expedite the review and approval process, your original comments are included and our responses are provided in BOLD. The following new or revised documents are incorporated by reference herein ¡ Revised Grading and TESC Plan Cl of 2 ¡ Revised Stormwater and Utility Plan C2 of 2 o Revised site plan SP . Geotechnical Plan Review Letter dated June 14, 2018 PLANNING DIVISION REVIEW 1. Geotechnical Report: Not Addressed. The geotechnical report submitted with the building permit application does not address the requirements of ECDC 23.80.060 or ECDC 23.80.070 Please submit a geotechnical report addendum that specifically addresses the required findings in ECDC 23.80.060.4 and ECDC 23.80.070. July 1 1,2A18 Comment: The June 14,2A18 Geotechnical Plan Review Letter does not address the specific requirements of ECDC 23.80.060 or FCDC 23.80.070. Please subm¡t a geCItechn¡cal report addendum the specifically addresses the required findings of ECDC 23.80.060.4 and ECDC 23.80.070" Respondent: Carston Curd, GIT and M. Khaled Shawish, PE, Nelson Geotechnical Associates, lnc. Response: see updated Geotechnical Plan Review Letter dated July 31, 2018' see Comment Response section starting on page 2 and see Minimum Risk Statement starting on page 4 4. Side Sewer: lf the existing side sewer is not approved to be reused, new side sewer would need to be relocated outside the stream buffer. Respondent: Jacob D. Mealey, P.E., lnsight Engineering Response: lssued revised Civil Engineering Site Plan C2 of 2- see Note 11 revised as RESUB AUt 0 2 2018 follows: eugffiffi¡B5ur IF A NEW SEWER LATERAL JS DETERMINED TO BE REQUIRED, AND THE CONNECT¡ON WILL BE CORE DRILLED, THE CONNECTION AT THE SEWER MAIN WILL NEED TO BE A ROMAC INSERT A-TEE OR IF THE SEWER CONNECTION WILL BE CUT IN, A WYE IS TO BE INSTALLED. THE NEW S¡DE SEWER WOULD NEED TO BE LOCATED OUTSIDE THE BUFFER Other: Please note that the architectural Site Plan drawing SP has been revised to conform to the revised Civil Engineering Site Plan C 1 of 2 and C2 o'f 2 Respondent: Doug Williams' Doug Williams Design Response: see revised Architectural Site Plan SP lf you have questions or need additional information, please call or e-mail me at thepermitnetwork@gm ail. com Respectfully, Kelli Martin, Permit Specialist Page2 of 3