20180831132139.pdfMarch 30, 2018 RE: Prospect Lane, Edmunds Washington Dear Ben THE MOST ADVANCED NAME IN WATER MANAGEMENT SOLUTIONS"" . f 0MG Looking at the attached drawings, dropping the inlet 13" will not affect the operation of the BayFilter BF-72-2 that was approved for this project. The key is that the standpipe overflow remains at the same height (426.010) and provides the needed head to drive the filters. I double checked with our engineering department just to make sure. Please check with the design engineer and make sure they have no issue with your new inlet elevation and let me know if you need any further assistance. Please contact me if you have any questions. Thank you. Regards, x - NW -A Jim Ficker Water Quality Product Manager -West Advanced Drainage Systems, Inc. Jim.ficker@ads-pipe.com Phone: 503-956-1031 ADVANCED DRAINAGE SYSTEMS, INC. 4640 TRUEMAN BOULEVARD, HILLIARD, OH 43026 TEL: 614 / 658-0050 800 / 733-7473 HTTP:11WWW.ADS-PIPE COM PROJECT INFORMATION ENGINEERED TIM SNELL PRODUCT 509-993-0813 MANAGER: TIM.SNELL@ADS-PIPE.COM DANNYJONES ADS SALES REP: 559-253-9931 'T DANNY,JONES@ADS-PIPE.COM u� PROJECT NO: - �S 0 6 5"91 BAYSAVER BAYFILTER SPECIFICATIONS �Iffib *.dL LOVELL-SAUERLAND &AS OCIINITEG DATE: 1 F MIKIDS a Ji-3 / 2- �) - OY� ADVANCED DRAINAGE SYSTEMS, INC. PROSPECT LANE EDMONDS, WASHINGTON PRODUCTS A . INTERNAL COMPONENTS ALL COMPONENTS INCLUDING CONCRETE STRUCTURE(S), PVC MANIFOLD PIPING AND FILTER CARTRIDGES, SHALL BE PROVIDED BY BAYSAVER TECHNOLOGIES LLC, 1030 DEER HOLLOW DRIVE, MOUNT AIRY, MD (800,229.7283). B. PVC MANIFOLD PIPING: ALL INTERNAL PVC PIPE AND FITTINGS SHALL MEET ASTM D1785. MANIFOLD PIPING SHALL BE PROVIDED TO THE CONTRACTOR PARTIALLY PRE-CUT AND PRE -ASSEMBLED. C. FILTER CARTRIDGES EXTERNAL SHELL OF THE FILTER CARTRIDGES SHALL BE SUBSTANTIALLY CONSTRUCTED OF POLYETHYLENE OR EQUIVALENT MATERIAL ACCEPTABLE TO THE MANUFACTURER. FILTRATION MEDIA SHALL BE ARRANGED IN A SPIRAL LAYERED FASHION TO MAXIMIZE AVAILABLE FILTRATION AREA. AN ORIFICE PLATE SHALL BE SUPPLIED WITH EACH CARTRIDGE TO RESTRICT THE FLOW RATE TO A MAXIMUM OF 45 GPM. D. FILTER MEDIA: FILTER MEDIA SHALL BE BY BAYSAVER TECHNOLOGIES LLC AND SHALL CONSIST OF THE FOLLOWING MIX: A BLEND OF ZEOLITE, PERLITE AND ACTIVATED ALUMINA, E. PRECAST CONCRETE VAULT: CONCRETE STRUCTURES SHALL BE PROVIDED ACCORDING TO ASTM C. THE MATERIALS AND STRUCTURAL DESIGN OF THE DEVICES SHALL BE PER ASTM C478, C857 AND C858. PRECAST CONCRETE SHALL BE PROVIDED BY BAYSAVER TECHNOLOGIES, LLC. PERFORMANCE A. THE STORMWATER FILTER SYSTEM SHALL BE AN OFFLINE DESIGN CAPABLE OF TREATING 100% OF THE REQUIRED TREATMENT FLOWAT FULL SEDIMENT LOAD CONDITIONS. B. THE STORMWATER FILTER SYSTEM'S CARTRIDGES SHALL HAVE NO MOVING PARTS. C. THE STORMWATER TREATMENT UNIT SHALL BE DESIGNED TO REMOVE AT LEAST 85% OF SUSPENDED SOLIDS, 65% OF TOTAL PHOSPHORUS, 65% OF TURBIDITY, 60% OF TOTAL COPPER, AND 60% OF TOTAL ZINC BASED ON FIELD DATA COLLECTED IN COMPLIANCE WITH THE TECHNOLOGY ACCEPTANCE RECIPROCITY PARTNERSHIP TIER 11 TEST PROTOCOL. D. THE STORMWATER FILTRATION SYSTEM SHALL REDUCE INCOMING TURBIDITY (MEASURED AS NTUs) BY 50% OR MORE AND SHALL NOT HAVE ANY COMPONENTS THAT LEACH NITRATES OR PHOSPHATES. E. THE STORMWATER FILTRATION CARTRIDGE SHALL BE EQUIPPED WITH A HYDRODYNAMIC BACKWASH MECHANISM TO EXTEND THE FILTER'S LIFE AND OPTIMIZE ITS PERFORMANCE. F. THE STORMWATER FILTRATION SYSTEM SHALL BE DESIGNED TO REMOVE A MINIMUM OF 65% OF THE INCOMING TOTAL PHOSPHORUS (TP) LOAD. G. THE STORMWATER FILTRATION SYSTEM'S CARTRIDGES SHALL HAVE A TREATED SEDIMENT CAPACITY FOR 80% TSS REMOVAL BETWEEN 150-350 LBS. BAYFILTER MAINTENANCE 6C APPROVED El APPPOV,'-..D AS NOTED El REVISE-` &RESUBMIT [I NOT APPROVED APPROVAL OF THESE DOCUMEN FS DOES NOT RELIEVE CONTRACTOR OF THEIR RESPONSIBILITY IN REFERENCE TO FIELD VERIFICATIONS OF All DIMENSIONS; JOBSITE CONDIT101INS AND REQUIRENIFNTS; COORDINATION WITH ALL TRADES- VIV COMPLYING WITH ALL. STATE AND CITY ORDINANCES 06 'c' l".QUIREM'c" NTS ANO CONTRACT DOCUMENTS. Evilalao"I'll THE BAYFILTER SYSTEM REQUIRES PERIODIC MAINTENANCE TO CONTINUE OPERATING AT ITS PEAK EFFICIENCY DESIGN. THE MAINTENANCE PROCESS COMPRISES THE REMOVAL AND REPLACEMENT OF EACH BAYFILTER CARTRIDGE AND THE CLEANING OF THE VAULT OR MANHOLE WITH A VACUUM TRUCK, FOR BEST RESULTS, BAYFILTER MAINTENANCE SHOULD BE PERFORMED BY A CERTIFIED MAINTENANCE CONTRACTOR. A QUICK CALL TO AN ADS ENGINEER OR CUSTOMER SERVICE REPRESENTATIVE WILL PROVIDE YOU WITH A LIST OF RELIABLE CONTRACTORS IN YOUR AREA. WHEN BAYFILTER IS INITIALLY INSTALLED, WE RECOMMEND THAT AN INSPECTION BE PERFORMED ON THE SYSTEM IN THE FIRST SIX (6) MONTHS. AFTER THAT, THE INSPECTION CYCLE TYPICALLY FALLS INTO A BIANNUAL PATTERN GIVEN NORMAL STORM OCCURRENCE AND ACTUAL SOLIDS LOADS. WHEN BAYFILTER EXHIBITS FLOWS BELOW DESIGN LEVELS, THE SYSTEM SHOULD BE INSPECTED AND MAINTAINED AS SOON AS PRACTICAL. REPLACING A BAYFILTER CARTRIDGE SHOULD BE CONSIDERED AT OR ABOVE THE LEVEL OF THE MANIFOLD. MAINTENANCE PROCEDURES 1. REMOVE THE MANHOLE COVERS AND OPEN ALL ACCESS HATCHES. 2. BEFORE ENTERING THE SYSTEM MAKE SURE THE AIR IS SAFE PER OSHA STANDARDS OR USE A BREATHING APPARATUS. USE LOW 02, HIGH CO. OR OTHER APPLICABLE WARNING DEVICES PER REGULATORY REQUIREMENTS. 3. USING A VACUUM TRUCK, REMOVE ANY LIQUID AND SEDIMENTS THAT CAN BE REMOVED PRIOR TO ENTRY. 4. USING A SMALL LIFT OR THE BOOM OF THE VACUUM TRUCK, REMOVE THE USED CARTRIDGES BY LIFTING THEM OUT 5. ANY CARTRIDGES THAT CANNOT BE READILY LIFTED CAN BE EASILY SLID ALONG THE FLOOR TO A LOCATION THEY CAN BE LIFTED VIA A BOOM LIFT. 6. WHEN ALL THE CARTRIDGES HAVE BEEN REMOVED, IT IS NOW PRACTICAL TO REMOVE THE BALANCE OF THE SOLIDS AND WATER. LOOSEN THE STAINLESS CLAMPS ON THE FERNCO COUPLINGS FOR THE MANIFOLD AND REMOVE THE DRAINPIPES AS WELL. CAREFULLY CAP THE MANIFOLD AND THE FERNCO'S AND RINSE THE FLOOR, WASHING AWAY THE BALANCE OF ANY REMAINING COLLECTED SOLIDS. 7. CLEAN THE MANIFOLD PIPES, INSPECT, AND REINSTALL. 8. INSTALL THE EXCHANGE CARTRIDGES AND CLOSE ALL COVERS. 9. THE USED CARTRIDGES MUST BE SENT BACK TO ADS FOR EXCHANGE/RECYCLING AND CREDIT ON UNDAMAGED UNITS. BAYFILTER INSTALLATION NOTES 1. CONTACT UTILITY LOCATOR TO MARK ANY NEARBY UNDERGROUND UTILITIES AND MAKE SURE IT IS SAFE TO EXCAVATE. 2. REFERENCE THE SITE PLAN AND STAKE OUT THE LOCATION OF THE BAYFILTER VAULT. 3. EXCAVATE THE HOLE, PROVIDING ANY SHEETING AND SHORING NECESSARY TO COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY REGULATIONS. 4. LEVEL THE SUB —GRADE TO THE PROPER ELEVATION. VERIFY THE ELEVATION AGAINST THE MANHOLE DIMENSIONS, THE INVERT ELEVATIONS, AND THE SITE PLANS, ADJUST THE BASE AGGREGATE, IF NECESSARY. 5. HAVE THE SOIL BEARING CAPACITY VERIFIED BY A LICENSED/ENGINEER FOR THE REQUIRED LOAD BEARING CAPACITY. ON SOLID SUB —GRADE, SET THE FIRST SECTION OF THE BAYFILTER PRE —CAST VAULT. 6. CHECK THE LEVEL AND ELEVATION OF THE FIRST SECTION TO ENSURE IT IS CORRECT BEFORE ADDING ANY RISER SECTIONS. 7. IF ADDITIONAL SECTION(S) ARE REQUIRED, ADD A WATERTIGHT SEAL TO THE FIRST SECTION OF THE BAYFILTER VAULT, SET ADDITIONAL SECTION(S) OF THE VAULT, ADDING A WATERTIGHT SEAL TO EACH JOINT, S. INSTALL THE PVC OUTLET MANIFOLD, 9. INSTALL THE PVC OUTLET PIPE IN BAYFILTER VAULT. 10, INSTALL THE INLET PIPE TO THE BAYFILTER VAULT. 11. AFTER THE SITE IS STABILIZED, REMOVE ANY ACCUMULATED SEDIMENT OR DEBRIS FROM THE VAULT AND INSTALL THE FLOW DISKS, DRAINDOWN MODULES (IF APPLICABLE), AND THE BAYFILTER CARTRIDGES, 12. PLACE FULL SET OF HOLD DOWN BARS AND BRACKETS INTO PLACE. 02013 ADS, INC, A PRELIMINARY SIZING SUMMARY I BAYFILTER TREATMENT SYSTEM BF-72-2 PROJECT 8713 - 236TH STREET SlW. LOCATION EDMONDS,WA WATER QUALITY FLOW 0.0613 CFS DRAINAGE AREA CARTRIDGE DESIGN FLOW RATE 22.6 GP # BAYFILTER CARTRIDGES 2 THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS A STORMWATER FILTRATION DEVICE DESIGNED TO REMOVE FINE SEDIMENTS. HEAVY METALS, AND PHOSPORUS. THE SAYFILTER SYSTEM RELIES ON A SPIRAL WOUND MEDIA FILTER CARTRIDGE WITH APPROXIMATELY 45 SQUARE FEET OF FILTRATION AREA. THE FILTER CARTRIDGES ARE HOUSED IN A CONCRETE STRUCTURE THAT EVENLY DISTRIBUTES THE FLOW BETWEEN CARTRIDGES. THE SYSTEM IS OFFLINE WITH AN EXTERNAL BYPASS THAT ROUTES HIGH INTENSITY STORMS AROUND THE SYSTEM. THE FILTER CARTRIDGES REMOVE POLLUTANTS FROM RUNOFF BY FILTRATION (INCEPTIONIATTACHMENT) AND ABSORPTION. 522 CARTRIDGE (TYP) 3" OUTLET MANIFOLD 3" FERNCO COUPLER OVERFLOW STANDPIPE 12"0 OUTLET PIPE 2C INVERT AT BOTTOM OF VAULT 36" SOLID LID 072" MANHOLE STEPS DDMV 12"0 INLET PIPE 173' CP:r'Tlr'tKl A -A M f-� LOVELL-SAUERLAND &AS MATEO DATE: 0�2 BY: Ft APP9,o�,,i,,r) f-1 APPROVED AS NOTED FI ffiVISE R RESUBMIT ID NOT APPROVE.D AppnOVAL OF THESF oocukwimn DOF.�; NOT RELIEVE (' OlslTnAG rOR OF Tl IFIR RE,3PON^rj!l-]'rY IN REFERENCL T"'. I:IELDVERli-ICATIO�ISOFAI,I.Dlhi,LNSIONG;JOC,SITECONDI'ii(, AND REQUIREM�il%fll'&, COOFIDINATION WITH ALL TRADES; COMPLYING %-ViTH ALL STA 1­2 AND CITY ORDINANCE'S AND PF( UICEW417` AND CONTRACT DOCUMENTS. ) it 1; z p 50 L) LU F- z 0 Lu Lu LU p- u� �2 (j) 0 co a) 0 z — L0 I (D 0 C? a. CN uj LLj 0 a. z 0 Lu > 0 0 oz 10 D Lu L) U) 0 F- 0 IDA z V 1= 2 SHEET 2 0 F I I PR Oil 0 T 0 P -­ 4.3 O�', 2 INV=.427.73/ --RD- - - --------- 30 6 P VIC oel� @ 5.0% f INV=429-23 r.�a6-u--p UNDERCI`ROUND ION VAULT DETENJ PN SD 77 0 A L _'S,_77 7 LOVELL-SAUERLAND & A OC 'FEG--- 10 1 Pv. 0.-57o- ­AN f)ATF.:_:�t�,3 Z91.2 _BY: U AP\ Y APPROVED ADD CI T5AS is , :Su 7 A V11 Y6 'Ap 0 APPROYAL FTrohUC6M64TS D06MT RA/ /7 -0 TRAGTOF�Of THF1RXspoN`aIf1TY REf ERN' -Ptj�ICATIO E %)F)IONS- DVE A 11 Deltz '160SIT rNDIT10 �,."Tj r a I - �A NO RL N � AORP, v1;',T10Z. ALL. ' ADES* A! o , DZA &ING V! L ol',* F. AND 9 OR I CLS A r REM - S AND 14 JTIACWOCUNI�u I >It M?U I