Project: 104th Utility
Copies Date Description
8/29-8/30/18 Daily Field Report(s) # 1 & 2
--r i
Comments:
CC:
1 :
ATTN:
2:
ATTN:
3:
ATTN:
4:
ATTN�
Transmitted By: Earth Solutions NW, LLC
PM: Lewis Conklin
1805 — 136" PI NE, Suite 201 Bellevue, WA 98005
(425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710
Earth Solutions NWLLC
MIMI 1805 136" Place NE,
Suite 201 FAX:
Bellevue, WA 98005 (425) 449-4711
(425) 449-4704
DAILY FIELD REPORT
Project Name
104t� Utility
General Contractor
Grading Contractor
Test N
ed Plans/Permits onsite
Field Rep.
Project No.
Page of
Report No.
MJD
9"K-7
1 of 1
1
Time On Site
Time Off Site
Date
Day of Week
2:OOPM
3:00PIVI
8/29/2018
Wed.
Travel Time
1 Hr. RT
Job Location
23730 104th Ave W, Edmonds, WA
General Contractor's Superintendent
Grading Foreman
Z YES 7 NO Project No.
Weather
760F, Sun
Client / Owner
Received Onsite By
Checked By
Permit No.
umber
Test Location
Elevation
Reference
Compaction
Curve
Maximum Dry
Density
(lbs./cu. ft.)
Fill Moisture
%
Test Dry
Density
(lbs./cu. ft.)
% of
Maximum
Dry Density
8" Sewer
—
__
See Map
-4
1
135.5
9.31
128.4
95
As requested by the contractor, ESNW rep. was onsite to observe and test8" sewer installation, as well as collect soil
samples of Proctor #1 �
8" Sewer Installation
While onsite, ESNW rep. observed the contractor installing 8" sewer main within a —6' utility trench within the roadway.
ESNW rep. observed the contractor bed the pipe with pea gravel, and backfill using 12" lifts of imported 5/8" minus crush
rock. ESNW rep. observed the contractor use a small jumping plate wacker to compact the material down to a dense,
stable state. Compaction tests taken indicate that an adequate compaction of at least 95% was achieved at the testing
locations.
While onsite, ESNW rep. collected samples of the imported 5/8" minus crush rock, and transported the samples back to
ESNW soils lab for further testing.
ICOPY TO: CONTINUED ON NEXT PAGE E]
Earth Solutions NWIULC
1805 11361t' Place NE, FAX:
Suite 201 (425) 449-4711
Bellevue, WA 98005
(425) 449-4704
DAILY FIELD REPORT
Project Name
104th Utility
General Contractor
Grading Contractor
LAre approved Plans/Permits onsite
Field Rep Project No. Page of
MJD to->'7L-7 i of i
Time On Site Time Off Site Date
9:OOAM � 9:45AM
Travel Time
1 Hr. RT
Job Location
23730 104th Ave W, EdrnondE
General Contractor's Superintendent
WA
8/30/2018
Weather
780F, Sunny
Client / Owner
Received Onsite By
Grading Foreman Checked By
YES 7 NO Project No. Permit No,
Report No.
2
Day of Week
Thursday
Reference Maximum Dry Fill Moisture Test Dry % of
Test Number Test Location Elevation Compaction Density % Density Maximum
ICurve (lbs./cu. ft.) (lbs./cu. ft.) Dry Density
8" Sewer I
2 See Map SG I 1 135.5 8.64 129.0 95
As requested by the contractor, ESNW rep. was onsite to observe and test 8" sewer installation.
8" Sewer Installation
While onsite, ESNW rep. observed the contractor continue installing 8" sewer main within a —6' utility trench within the
roadway. ESNW rep. observed the contractor bed the pipe with pea gravel, and backfill using 12" lifts of imported 5/8"
minus crush rock. ESNW rep. observed the contractor use a small jumping plate wacker to compact the material down to
a dense, stable state. Compaction tests taken indicate that an adequate compaction of at least 95% was achieved at the
testing locations.
ESNW rep. will return when requested
Mitchell Dodo