Loading...
20180911114456.pdfL 'Sol Mimi Earth Solutions NW, LLC LETTER OF TRANSMITTAL To: Select Homes, Inc. 16531-13 1h Avenue West, A-107 Lynnwood, WA 98037 Attn: Mr. Gary Klick Email: gary giselectlionies.com No. of Date: Septeinbei- 11 � 2018 ESNW No.: ES- 6327 Project: 104th Utility Copies Date Description 8/29-8/30/18 Daily Field Report(s) # 1 & 2 --r i Comments: CC: 1 : ATTN: 2: ATTN: 3: ATTN: 4: ATTN� Transmitted By: Earth Solutions NW, LLC PM: Lewis Conklin 1805 — 136" PI NE, Suite 201 Bellevue, WA 98005 (425) 284-3300 FAX (425) 449-4711 Toll Free (866) 336-8710 Earth Solutions NWLLC MIMI 1805 136" Place NE, Suite 201 FAX: Bellevue, WA 98005 (425) 449-4711 (425) 449-4704 DAILY FIELD REPORT Project Name 104t� Utility General Contractor Grading Contractor Test N ed Plans/Permits onsite Field Rep. Project No. Page of Report No. MJD 9"K-7 1 of 1 1 Time On Site Time Off Site Date Day of Week 2:OOPM 3:00PIVI 8/29/2018 Wed. Travel Time 1 Hr. RT Job Location 23730 104th Ave W, Edmonds, WA General Contractor's Superintendent Grading Foreman Z YES 7 NO Project No. Weather 760F, Sun Client / Owner Received Onsite By Checked By Permit No. umber Test Location Elevation Reference Compaction Curve Maximum Dry Density (lbs./cu. ft.) Fill Moisture % Test Dry Density (lbs./cu. ft.) % of Maximum Dry Density 8" Sewer — __ See Map -4 1 135.5 9.31 128.4 95 As requested by the contractor, ESNW rep. was onsite to observe and test8" sewer installation, as well as collect soil samples of Proctor #1 � 8" Sewer Installation While onsite, ESNW rep. observed the contractor installing 8" sewer main within a —6' utility trench within the roadway. ESNW rep. observed the contractor bed the pipe with pea gravel, and backfill using 12" lifts of imported 5/8" minus crush rock. ESNW rep. observed the contractor use a small jumping plate wacker to compact the material down to a dense, stable state. Compaction tests taken indicate that an adequate compaction of at least 95% was achieved at the testing locations. While onsite, ESNW rep. collected samples of the imported 5/8" minus crush rock, and transported the samples back to ESNW soils lab for further testing. ICOPY TO: CONTINUED ON NEXT PAGE E] Earth Solutions NWIULC 1805 11361t' Place NE, FAX: Suite 201 (425) 449-4711 Bellevue, WA 98005 (425) 449-4704 DAILY FIELD REPORT Project Name 104th Utility General Contractor Grading Contractor LAre approved Plans/Permits onsite Field Rep Project No. Page of MJD to->'7L-7 i of i Time On Site Time Off Site Date 9:OOAM � 9:45AM Travel Time 1 Hr. RT Job Location 23730 104th Ave W, EdrnondE General Contractor's Superintendent WA 8/30/2018 Weather 780F, Sunny Client / Owner Received Onsite By Grading Foreman Checked By YES 7 NO Project No. Permit No, Report No. 2 Day of Week Thursday Reference Maximum Dry Fill Moisture Test Dry % of Test Number Test Location Elevation Compaction Density % Density Maximum ICurve (lbs./cu. ft.) (lbs./cu. ft.) Dry Density 8" Sewer I 2 See Map SG I 1 135.5 8.64 129.0 95 As requested by the contractor, ESNW rep. was onsite to observe and test 8" sewer installation. 8" Sewer Installation While onsite, ESNW rep. observed the contractor continue installing 8" sewer main within a —6' utility trench within the roadway. ESNW rep. observed the contractor bed the pipe with pea gravel, and backfill using 12" lifts of imported 5/8" minus crush rock. ESNW rep. observed the contractor use a small jumping plate wacker to compact the material down to a dense, stable state. Compaction tests taken indicate that an adequate compaction of at least 95% was achieved at the testing locations. ESNW rep. will return when requested Mitchell Dodo ESNW Field Technician ICOPY TO: CONTINUED ON NEXT PAGE 0 1